HomeMy WebLinkAbout[External] Revised Design Plan for Transylvania County Storm Fred Hightower Site, DWR No. 20231425, Corps Action ID SAW-2023-020331
Winston, Joey
From:David Brown <david@jenningsenv.com>
Sent:Tuesday, December 5, 2023 9:22 AM
To:Winston, Joey; Shannon Healy
Cc:Zan Price; Leslie, Andrea J
Subject:[External] Revised Design Plan for Transylvania County Storm Fred Hightower Site, DWR No.
20231425, Corps Action ID SAW-2023-02033
Attachments:1903 Hightower 2023-12-04.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Joey & Shannon,
You received a PCN for the Transylvania County Storm Fred Hightower Site around October 17. Recently we
have changed the design which is attached. The length/amount of the requested stream impacts to Indian Creek
are the same, 115 ft. On the attached Sheet 2.1 you will see that there are now two 50-ft areas of bank
stabilization upstream of the bridge instead of the one 100-ft area of bank stabilization along the east stream
bank upstream of the bridge. We moved a portion of the stream bank stabilization work upstream to protect a
waterline that flows to the fish runs located south of the driveway.
I’m sorry for this late revision to the design plans. Please let me know if you have any questions.
Thanks,
David
David Brown, PG
Sr. Scientist / Geologist | Jennings Environmental, PLLC
828 384 1890
david@jenningsenv.com
Asheville, NC | jenningsenv.com
This information is confidential and is intended solely for use by the recipient and others authorized to receive it. Any disclosure, copying, distribution or taking
action in relation to this information is strictly prohibited and may be unlawful.