HomeMy WebLinkAbout1903 Hightower 2023-12-04L
O
D
L
O
D
L
O
D
LO
D
LO
D
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
C
O
V
E
R
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
O
c
t
o
b
e
r
1
6
,
2
0
2
3
1
1
:
1
0
:
1
0
A
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
20
2
3
8
:
5
2
:
2
6
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
CO
V
E
R
S
H
E
E
T
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
1.1
SCALE (34"X22"):
SCALE (17"X11"):
1" = 100'
1" = 200'
SCALE IN FEET
0 200100
PROJECT DIRECTORY
PROJECT SPONSOR
TRANSYLVANIA COUNTY
SOIL AND WATER
CONSERVATION DISTRICT
JEFF PARKER
SOIL & WATER DISTRICT DIRECTOR
JEFF.PARKER@TRANSYLVANIACOUNTY.ORG
DESIGN TEAM
ENGINEER
JENNINGS ENVIRONMENTAL PLLC
GREG JENNINGS, PHD, PE
PRESIDENT
GREG@JENNINGSENV.COM
CONSTRUCTION
CONTRACTOR
TO BE DETERMINED
PROPERTY OWNER(S)
PIN OWNER
8546-56-7461-000 EVERETTE JR & MARY O HLTE HIGHTOWER
8546-56-4086-000 BOBBY C & CRYSTAL OWEN
SHEET INDEX
COVER SHEET 1.1
GENERAL PROJECT NOTES & SPECIFICATIONS 1.2
STREAM RESTORATION PLAN 2.1
SECTIONS 3.1
DETAILS 4.1 - 4.2
EROSION & SEDIMENTATION CONTROL (ESC)5.1 - 5.3
RE-VEGETATION 6.1 - 6.2
PROJECT
LOCATION
IND
I
A
N
C
R
E
E
K
R
O
A
D
TRANSYLVANIA COUNTY EWP
SITE ID #: 37-11-21-5042-406 - HIGHTOWER
INDIAN CREEK
TRANSYLVANIA COUNTY , NORTH CAROLINA
LAT: 35.243687, LONG: -82.867949
Know what'sbelow.
before you digCall
PERMIT DRAWING
NOT FOR CONSTRUCTION
December 4, 2023
NRCS DESIGN CERTIFICATION:
"TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT, AND BELIEF, THESE
PLANS MEET APPLICABLE NRCS STANDARDS AND PERMITTING REQUIREMENTS."
GREG JENNINGS, PHD, PE
PRESIDENT, JENNINGS ENVIRONMENTAL PLLC
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
N
O
T
E
S
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Tu
e
s
d
a
y
,
O
c
t
o
b
e
r
1
0
,
2
0
2
3
5
:
3
6
:
4
8
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
2
:
3
0
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
GE
N
E
R
A
L
P
R
O
J
E
C
T
N
O
T
E
S
&
S
P
E
C
I
F
I
C
A
T
I
O
N
S
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
1.2
SCALE (34"X22"):
SCALE (17"X11"):
NTS
NTS
NOT TO SCALE
GENERAL PROJECT NOTES AND SPECIFICATIONS
1.DEFINITIONS:
1.1.CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE DRAWINGS, DETAILS, SPECIFICATIONS,
PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR
COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS OF THE MAY NOT
CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK.
1.2.ENGINEER: JENNINGS ENVIRONMENTAL PLLC
2.THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR
REGULATIONS:
2.1.NC DEMLR'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013)
2.2.NC DEMLR'S CONSTRUCTION GENERAL PERMIT NUMBER NCG01000
2.3.GENERAL, REGIONAL AND SPECIAL CONDITIONS OF USACE'S 404 NATIONWIDE PERMIT NUMBER 27
2.4.GENERAL AND SPECIAL CONDITIONS OF NCDWR'S 401 WATER QUALITY CERTIFICATION 4134
2.5.THE CONSTRUCTION DOCUMENTS
3.ALL EXISTING UTILITIES MAY NOT BE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. CONTRACTOR SHALL
NOTIFY 'NC811' (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING
CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY
LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF 'NC811'. REPORT ANY
DISCREPANCIES TO THE ENGINEER IMMEDIATELY. ANY UTILITIES SHOWN ON THE CONSTRUCTION
DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM
COORDINATING, VERIFYING, AND PROTECTING EXISTING UTILITIES.
4.ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR IS
RESPONSIBLE FOR COORDINATING CONSTRUCTION ACTIVITIES WITH THE APPROPRIATE UTILITY COMPANIES
FOR ANY REQUIRED RELOCATIONS (I.E. POWER POLES, METERS, FITTINGS, ETC.).
5.THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY
THE ENGINEER AND PROJECT OWNER. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING
EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION
ACCESS POINTS.
6.THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING
THIS WORK IS EXTREMELY IMPORTANT. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S
REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH
PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK ON THE SITE.
7.EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF
PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME THE OWNER OR ENGINEER DETERMINES THAT THE
CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE
CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE
CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS
AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE
PROJECT OWNER, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED
REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO
ENSURE THE SAFE CONDUCT OF ITS WORK.
8.THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER
PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY
RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES,
INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND
FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE
CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE.
CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS.
9.THE CONTRACTOR SHALL ONLY USE ACCESS PATHS AND STAGING AREAS SHOWN ON THE DRAWINGS. ANY
ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE ENGINEER AND PROJECT
OWNER PRIOR TO USE.
10.NO NON-PERMITTED FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STABILIZATION AND GRADING
WORK SHALL BE PLACED IN DESIGNATED AREAS ON THE SITE.
TOPOGRAPHIC NOTES AND SPECIFICATIONS
11.HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON
NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88.
12.THE DESIGN ELEVATIONS AND GRADES SHOWN IN THE DRAWINGS ARE BASED ON NORTH CAROLINA
QL2/QL1 LiDAR DIGITAL ELEVATION MODEL (DEM) FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE
BASED. DISCREPANCIES BETWEEN THE EXISTING GROUND SURFACE AND FIELD CONDITIONS AT THE TIME OF
CONSTRUCTION CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. THESE VARIATIONS SHALL
BE CONSIDERED INCIDENTAL TO CONSTRUCTION.
STREAM RESTORATION NOTES AND SPECIFICATIONS
13.FIELD CONDITIONS MAY REQUIRE ADAPTATION OF THE DESIGN AND/OR DETAILS PROVIDED IN THE
DRAWINGS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN IN THE DRAWINGS
AND DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. THE ENGINEER WILL WORK WITH THE
CONTRACTOR TO ADDRESS ANY FIELD CHANGES.
14.IN-STREAM ROCK STRUCTURES MAY BE SUBSTITUTED WITH WOOD STRUCTURES WITH WRITTEN APPROVAL
FROM THE ENGINEER.
15.THE CONTRACTOR SHALL MARK THE LOCATIONS OF BANK STABILIZATION STRUCTURES USING SURVEY GRADE
GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING.
16.CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO ADJACENT SIGNIFICANT
TREES.
17.CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL BANK STABILIZATION
STRUCTURES.
18.DESIGN ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL
WITHIN RANGES SHOWN IN THE DRAWINGS AND DETAILS.
19.IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT
NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION
DOCUMENTS.
20.BANK STABILIZATION STRUCTURES SHALL BE INSTALLED AS SHOWN IN THE DRAWINGS AND DETAILS. ALL
STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND
ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND GRADES SHALL
BE WITHIN 0.1' OF DESIGN ELEVATIONS.
21.AFTER THE STRUCTURE IS COMPLETE AND NORMAL FLOW IS RESTORED TO THE CHANNEL, SOME
ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE
THE DESIRED FUNCTION.
22.THE GRADED RIVER BANKS SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT
SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING AS SHOWN
IN THE DRAWINGS AND DETAILS. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL
SURFACE BY LOOSENING 3 - 6” OF SOIL OR APPLYING 3 - 6” OF TOPSOIL TO THE DESIGN ELEVATIONS AND
APPLY TEMPORARY AND PERMANENT SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY
OVER THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL
MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF. INSTALL
MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE DRAWINGS. MATTING USED FOR
STREAMBANK STABILIZATION MUST BE CERTIFIED WEED-FREE STRAW OR OTHER NATURAL WEED-FREE /
NON-PROPAGATING VEGETATIVE MATERIALS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION
OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL.
23.TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR TO EXCAVATION AND GRADING
AND RE-APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4” OF TOPSOIL SHALL BE PLACED ON
DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE DRAWINGS. EROSION AND
SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS.
24.ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NCDEMLR'S
NG01 CONSTRUCTION GENERAL PERMIT.
25.ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR
RELOCATION.
26.ALL WETLANDS AND STREAMS LOCATED WITHIN 50 FEET OF THE CONSTRUCTION AREA ON THE PROJECT SITE
SHALL BE CLEARLY MARKED (EXAMPLE- ORANGE FABRIC FENCING) PRIOR TO ANY LAND DISTURBING
ACTIVITIES AND MUST BE MAINTAINED ON THE PROPERTY UNTIL THE PROJECT PHASE IS COMPLETED [15A
NCAC 02H .0506 (B)(2)].
27.THE CONTRACTOR SHALL USED A STANDARD CONSTRUCTION ENTRANCE AT ALL SITE ACCESS POINTS TO
PREVENT SEDIMENT FROM BEING TRACKED ONTO PUBLIC ROADS.
28.THE CONTRACTOR SHALL USED TEMPORARY SILT FENCE ALONG THE DOWNSLOPE SIDE OF ALL STAGING
AREAS AND TEMPORARY STOCK PILE AREAS.
29.THE TURBIDITY IN THE RECEIVING WATERS SHALL NOT EXCEED 50 NEPHELOMETRIC TURBIDITY UNITS (NTU)
IN STREAMS NOT DESIGNATED AS TROUT WATERS AND 10 NTU IN STREAMS, LAKES, OR RESERVOIRS
DESIGNATED AS TROUT WATERS, AS DESCRIBED IN 15A NCAC 02B .0200. APPROPRIATE SEDIMENT AND
EROSION CONTROL PRACTICES MUST BE USED TO MEET THIS STANDARD. [15A NCAC 02B .0211 (21)].
30.EQUIPMENT SHALL BE WELL-MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR
LEAKS OF PETROLEUM PRODUCTS. FUELING, LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE
SHOULD NOT TAKE PLACE WITHIN 50 FEET OF A WATERBODY OR WETLANDS TO PREVENT CONTAMINATION
BY FUEL AND OILS. [15A NCAC 02H .0506 (B)(3) AND 15A NCAC 02B.0211(12)].
31.CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW.
32.THE DESIGNER OR HIS DESIGNEE SHALL SUPERVISE THE INSTALLATION OF IN-STREAM STRUCTURES. [15A
NCAC 02H .0506(B)(1) AND (2)].
33.A TEMPORARY DIVERSION AND/OR PUMP AROUND SYSTEM SHALL BE USED TO DURING ALL STREAM
RESTORATION AND STABILIZATION WORK AS SHOWN IN THE DETAILS. TEMPORARY PUMP AROUND SYSTEM
SHALL BE USED AT PROJECT SITES WHERE THE WATERSHED SIZE IS LESS THAN 2 SQUARE MILES.
34.THE STREAM BANKS, IN-STREAM STRUCTURES, AND WORK AREA MUST BE STABILIZED AT THE END OF EACH
DAY BEFORE THE TEMPORARY IN-STREAM DIVERSIONS AND/OR PUMP AROUND SYSTEM(S) ARE REMOVED
AND FLOW IS RETURNED THE FULL CHANNEL.
35.EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE
USED ALONG STREAMBANKS OR WITHIN WETLANDS. DISTURBED AREAS SHOULD BE SEEDED, MULCHED,
AND/OR MATTED AS SOON AS POSSIBLE, PREFERABLY AT THE END OF EACH WORKDAY. [15A NCAC 02B
.0201]
36.IF BORROW OR WASTE MATERIAL IS REQUIRED OR GENERATED DURING GRADING OPERATIONS, AN
APPROVED EROSION AND SEDIMENT CONTROL PERMIT MUST BE SECURED FOR THE BORROW OR WASTE
MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY. [15A NCAC 04B .0110].
QUANTITIES AND MATERIALS NOTES AND SPECIFICATIONS
37.THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS
OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER
ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS. MATERIAL QUANTITIES,
DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE
CONSTRUCTION DOCUMENTS. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO
CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE
CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS.
38.COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE
REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS SHALL BE THE EXPENSE OF THE CONTRACTOR.
QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR.
39.THE EROSION CONTROL MEASURES DEPICTED ON THE DRAWINGS SHALL BE INSTALLED AS NEEDED TO KEEP
ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES
(ABOVE THOSE SHOWN ON THE DRAWINGS) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE
AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE PROJECT
OWNER AND ENGINEER PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES.
40.ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL
FROM THE PROJECT OWNER AND ENGINEER.
41.THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE
QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT
BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS
OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT.
EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL
OF THE SPECIFIC PRODUCT IN WRITING.
42.THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR
CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY
WITH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT
THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR
BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE
PROJECT OWNER AND ENGINEER. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE PROJECT
OWNER. THE CONTRACTOR SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE
(1) YEAR FROM THE DATE OF ACCEPTANCE OF BY THE PROJECT OWNER AND SHALL REPLACE ANY PORTIONS
THAT FAIL DUE TO FAULTY MATERIALS OR WORKMANSHIP, AT NO ADDITIONAL COST TO THE PROJECT
OWNER. A SIX (6) MONTH AND ELEVEN (11) MONTH INSPECTION WILL BE PERFORMED DURING THE
WARRANTY PERIOD. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL ITEMS DETERMINED BY THE
PROJECT OWNER OR AUTHORIZED REPRESENTATIVE TO BE DEFECTIVE UPON NOTIFICATION. THE
CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE FAILED ITEMS UPON NOTIFICATION BY THE PROJECT
OWNER. SEASONALLY INSTALLED ITEMS SHALL BE REPAIRED OR REPLACED DURING THE NEXT AVAILABLE
INSTALLATION PERIOD. ITEMS REPAIRED OR REPLACED UNDER THIS PROVISION SHALL HAVE AN ADDITIONAL
ONE (1) YEAR WARRANTY PERIOD FROM THE NEW DATE OF ACCEPTANCE. AREAS AND/OR OTHER WORK
DISTURBED WHILE ACCESSING AND/OR REPAIRING/REPLACING WARRANTY COVERED ITEMS SHALL BE
STABILIZED.
NRCS PRACTICE CODES
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
P
L
A
N
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
4
9
:
4
6
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
2
:
4
4
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
RE
S
T
O
R
A
T
I
O
N
P
L
A
N
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
2.1
SCALE (34"X22"):
SCALE (17"X11"):
1" = 10'
1" = 20'
SCALE IN FEET
0 10 20
NOTES:
- STABILIZE LEFT STREAM BANK UPSTREAM
OF EXISTING BRIDGE CROSSING.
- PLACE ADDITIONAL ROCK MATERIAL ON
STREAMBANKS TO PROTECT BRIDGE
ABUTMENTS FROM SCOUR AND EROSION.
- ONSITE DEBRIS DISPOSAL SHALL BE
LOCATED IN AN AREA OUTSIDE THE
100-YEAR FLOODPLAIN WITH LOCATION
PROVIDED BY LANDOWNER AND
APPROVED BY PROJECT ENGINEER.
-RESTORE ACCESS PATHS AND STORAGE
AREA(S) TO ORIGINAL CONDITION UPON
COMPLETION OF THE PROJECT OR UPON
SUCH TIME AS DIRECTED BY THE PROJECT
OWNER AND ENGINEER.
-DISTURBANCE OF TREES AND/OR WOODY
VEGETATION SHALL BE KEPT TO THE
MINIMUM EXTENT PRACTICABLE TO
COMPLETE WORK.
PLAN VIEW LEGEND
580 - STREAMBANK
STABILIZATION
SEE DETAIL,
SHEETS 4.1 - 4.2
EXISTING STREAM
CENTERLINE
PROPERTY LINE
EX. CONTOUR (1 FT)
FLOW DIRECTION
580 - STREAMBANK STABILIZATION, 50 LF
SEE DETAIL, SHEET 4.1
580 - STREAMBANK STABILIZATION, 15 LF
SEE DETAIL, SHEET 4.2
A
A'
580 - STREAMBANK
STABILIZATION, 18 LF
SEE DETAIL, SHEET 4.2
580 - STREAMBANK STABILIZATION, 50 LF
SEE DETAIL, SHEET 4.1
MAX DEPTH AT CENTER OF
RIFFLE CROSS-SECTION
TIE TO EXISTING GROUND
PER PLAN (MAX 2:1)
DESIGN BANKFULL
STAGE
DESIGN GRADE
DESIGN CENTERLINE
ALIGNMENT
15.0' ±MIN.
3.0
2:1
2:12:
1
1.50' ±
BANKFULL
BENCH
GENERALLY MATCH EX. CHANNEL
SECTION BELOW BANKFULL BENCHES
MATCH EXISTING THALWEG INVERT
TypSection - SCALE: HOR 1" =10'; VERT 1"= 5'
2920
2925
2930
2935
2940
2920
2925
2930
2935
2940
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
X
S
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
7
:
1
1
:
1
5
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
2
:
5
5
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
DE
S
I
G
N
S
E
C
T
I
O
N
S
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
3.1
SCALE (34"X22"):
SCALE (17"X11"):
NTS
NTS
NOT TO SCALE
TYPICAL DESIGN SECTION
TYPICAL SECTION
DESIGN CHANNEL SECTION SPECIFICATIONS
MAINTAIN CHANNEL
DIMENSION & CAPACITYSTRUCTURAL STREAMBANK
STABILIZATION
SEE DETAIL, SHEET 4.1
MAX 2:1
1.INSTALL STREAMBANK STABILIZARION PRACTICES AS SHOWN ON
THE DRAWINGS AND DETAILS. CONTRACTOR SHALL NOT INCREASE
CAPACITY OF THE CHANNEL BEYOND THE PRE-DISASTER CAPACITY
AS DOCUMENTED.
2.FINISHED SURFACE OF STREAMBANKS AND STABILIZATION
PRACTICES SHALL MATCH PRE-DISASTER CHANNEL DIMENSION
AND CAPACITY. ELEVATIONS AND DEPTHS SHALL BE
CONSTRUCTED TO WITHIN 0.1' (VERTICAL). CHANNEL WIDTHS AND
OTHER HORIZONTAL (X,Y) DIMENSIONS SHALL BE WITHIN 0.2'.
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
D
E
T
L
-
B
A
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
4
9
:
4
8
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
2
:
5
8
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
ST
R
E
A
M
B
A
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
4.1
NOT TO SCALE
SCALE (34"X22"):
SCALE (17"X11"):
NTS
NTS
STREAMBANK STABILIZATION - STRUCTURAL
NOTES AND SPECIFICATIONS
1.ALL STREAMBANK STABILIZATION - STRUCTURAL WORK SHALL TAKE PLACE DURING DRY
WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMIZE THE EXPORT OF SEDIMENT TO
ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE BY USING ADDITIONAL
EROSION AND SEDIMENTATION CONTROL MEASURES AS NEEDED OR AS DIRECTED BY THE
ENGINEER ONSITE.
2.FOR IMPLEMENTATION, THE CONTRACTOR SHALL PREPARE THE EXISTING STREAMBANK AND
INSTALL 8 OZ. NON-WOVEN FILTER FABRIC, AS NEEDED. STABILIZATION MATERIAL SHALL BE
PLACED ON THE PREPARED SLOPE TO A MINIMUM DEPTH OF 2.0 FEET. LARGER MATERIAL IS
TO BE PLACED IN A TOE TRENCH AT THE EXISTING TOE OF SLOPE.
3.ROCK MATERIAL USED FOR STRUCTURAL STREAMBANK STABILIZATION SHALL CONSIST OF
100% NCDOT CLASS 2 RIPRAP. ALL MATERIALS ARE TO BE APPROVED BY THE ENGINEER.
RIPRAP SHALL BE INSTALLED IN LIFTS NOT TO EXCEED 2.0'. EACH LIFT SHALL BE COMPACTED
WITH THE EXCAVATOR BUCKET TO FORM A DENSE LAYER OF COMPACTED ROCK MATERIAL TO
LINES, ELEVATIONS AND GRADES IN THE DRAWINGS AND DETAILS.
4.KEY EROSION CONTROL MATTING IN AT INTERFACE WITH STRUCTURAL STREAMBANK
STABILIZATION AND INSTALL MATTING ON ALL DISTURBED RIVER BANKS.
5.TRANSPLANTS AVAILABLE ONSITE MAY BE INSTALLED IN THE TOPSOIL AS DIRECTED BY THE
ENGINEER ONSITE.
6.THE SURFACE OF THIS FEATURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN
ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON
THE DRAWINGS.
7.STABILIZATION OF THE WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND
MULCHING IS REQUIRED FOLLOWING GRADING OF THE STREAMBANK. INSTALL WOODY
PLANTING AND VEGETATION AS SHOWN ON THE APPROVED RE-VEGETATION PLAN.
FL
O
W
MIN.
3.0'
TIE TO EXISTING
TOP OF BANK
DETAILED SECTION A - A'
NOT TO SCALE
DETAILED PLAN
NOT TO SCALE
EX. TOP OF BANK
MIN. 2.0 FT
MIN. 2.0 FT
VARIES
(MAX. 2.0' ABOVE
BANKFULL)
COMPACTED BACKFILL
NON-WOVEN GEOTEXTILE OR
BEDDING MATERIAL, AS NEEDED
TIE TO EXISTING
GRADE
EX. STREAMBED
MATCH EX. GRADE
MAX. 1:1
INSTALL EROSION CONTROL MATTING OR LIVE
TRANSPLANTS AS DIRECTED BY THE ENGINEER
ON ALL DISTURBED STREAMBANKS.
STREAMBANK STABILIZATION - STRUCTURAL
MATERIAL, SEE NOTE 3.
ST
R
E
A
M
B
A
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
LE
N
G
T
H
V
A
R
I
E
S
P
E
R
P
L
A
N
A A'
VARIES
(EXTEND TO
TOP OF BANK)
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
D
E
T
L
-
B
A
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
4
9
:
4
8
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
2
:
5
9
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
ST
R
E
A
M
B
A
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
-
B
R
I
D
G
E
&
C
U
L
V
E
R
T
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
4.2
NOT TO SCALE
SCALE (34"X22"):
SCALE (17"X11"):
NTS
NTS
STREAMBANK STABILIZATION - STRUCTURAL, BRIDGE/CULVERT
NOTES AND SPECIFICATIONS
1.ALL STREAMBANK STABILIZATION - STRUCTURAL WORK SHALL TAKE PLACE DURING DRY
WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMIZE THE EXPORT OF SEDIMENT TO
ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE BY USING ADDITIONAL
EROSION AND SEDIMENTATION CONTROL MEASURES AS NEEDED OR AS DIRECTED BY THE
ENGINEER ONSITE.
2.FOR IMPLEMENTATION, THE CONTRACTOR SHALL PREPARE THE EXISTING STREAMBANK AND
INSTALL 8 OZ. NON-WOVEN FILTER FABRIC, AS NEEDED. STABILIZATION MATERIAL SHALL BE
PLACED ON THE PREPARED SLOPE TO A MINIMUM DEPTH OF 2.0 FEET. LARGER MATERIAL IS
TO BE PLACED IN A TOE TRENCH AT THE EXISTING TOE OF SLOPE.
3.ROCK MATERIAL USED FOR STRUCTURAL STREAMBANK STABILIZATION SHALL CONSIST OF
100% NCDOT CLASS 2 RIPRAP. ALL MATERIALS ARE TO BE APPROVED BY THE ENGINEER.
RIPRAP SHALL BE INSTALLED IN LIFTS NOT TO EXCEED 2.0'. EACH LIFT SHALL BE COMPACTED
WITH THE EXCAVATOR BUCKET TO FORM A DENSE LAYER OF COMPACTED ROCK MATERIAL TO
LINES, ELEVATIONS AND GRADES IN THE DRAWINGS AND DETAILS.
4.KEY EROSION CONTROL MATTING IN AT INTERFACE WITH STRUCTURAL STREAMBANK
STABILIZATION AND INSTALL MATTING ON ALL DISTURBED AREAS ABOVE TOP OF BANK.
5.TRANSPLANTS AVAILABLE ONSITE MAY BE INSTALLED IN THE TOPSOIL AS DIRECTED BY THE
ENGINEER ONSITE.
6.THE SURFACE OF THIS FEATURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN
ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON
THE DRAWINGS.
7.STABILIZATION OF THE WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND
MULCHING IS REQUIRED FOLLOWING GRADING OF THE STREAMBANK. INSTALL WOODY
PLANTING AND VEGETATION AS SHOWN ON THE APPROVED RE-VEGETATION PLAN.
FL
O
W
MIN.
3.0'
DETAILED SECTION A - A'
NOT TO SCALE
DETAILED PLAN
NOT TO SCALE
EX. TOP OF BANK
MIN. 2.0 FT
MIN. 2.0 FT
VARIES
(EXTEND TO EX.
TOP OF BANK)
NON-WOVEN GEOTEXTILE OR
BEDDING MATERIAL, AS NEEDED
TIE TO EXISTING GRADE
AT TOP OF BANK
EX. STREAMBED
MATCH EX. GRADE
MAX. 1:1
INSTALL EROSION CONTROL MATTING AS DIRECTED BY
THE ENGINEER ON ALL DISTURBED STREAMBANKS.
STREAMBANK STABILIZATION - STRUCTURAL
MATERIAL, SEE NOTE 3.
ST
R
E
A
M
B
A
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
MI
N
.
1
0
U
P
S
T
R
E
A
M
A
N
D
D
O
W
N
S
T
R
E
A
M
FR
O
M
A
L
L
B
R
I
D
G
E
S
&
C
U
L
V
E
R
T
S
A A'
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
FLO
W
FL
O
W
S
F
S
F
SF
SF
TD
TD
TD
EVERETTE JR HIGHTOWER &
MARY O HIGHTOWER HLTE
PIN: 8546-56-7461-000
BOBBY C OWEN &
CRYSTAL OWEN
PIN: 8546-56-4086-000
TD
TD
TD
TD
T
D
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
E
S
C
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
0
:
1
6
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
3
:
1
2
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
ES
C
P
L
A
N
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
5.1
SCALE (34"X22"):
SCALE (17"X11"):
1" = 20'
1" = 40'
SCALE IN FEET
0 20 40
SCALE IN FEET
0 20 40
TEMPORARY IN-STREAM
DIVERSION (TYP.)LIMITS OF
DISTURBANCE
(LOD) = 0.44 AC.
TEMPORARY
SILT FENCE
TEMPORARY STAGING
AND STORAGE AREA
STABILIZE ALL DISTURBED
STREAMBANKS WITH COIR
EROSION CONTROL MATTING (TYP.)
PROTECT EX. WATER INTAKE
PIPE AT ALL TIMES
TEMPORARY IN-STREAM
DIVERSION (TYP.)
UTILIZE EX. GRAVEL DRIVE
TO ACCESS SITE TEMP. ACCESS PATH
ALONG TOP OF BANK
(15' WIDE TYP.)
EROSION AND SEDIMENTATION CONTROL LEGEND
LOD LOD
SF SF
LIMITS OF DISTURBANCE
SILT FENCE
STAGING AND STORAGE AREA
STABILIZED CONSTRUCTION ENTRANCE
CONSTRUCTION ACCESS ROUTE
TD TD TEMPORARY DIVERSION
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
E
S
C
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
0
:
1
6
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
3
:
1
4
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
ES
C
N
O
T
E
S
,
S
P
E
C
I
F
I
C
A
T
I
O
N
S
,
&
SE
Q
U
E
N
C
E
O
F
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
5.2
SCALE (34"X22"):
SCALE (17"X11"):
NTS
NTS
EROSION AND SEDIMENTATION CONTROL
NOTES AND SPECIFICATIONS SEQUENCE OF CONSTRUCTION
1.ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE
CONDITIONS AND REQUIREMENTS OF NC DEMLR'S NG01
CONSTRUCTION GENERAL PERMIT.
2.ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE
PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION.
3.EQUIPMENT SHALL BE WELL-MAINTAINED, CLEANED PRIOR TO
MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM
PRODUCTS. FUELING OPERATIONS SHALL BE PERFORMED IN A
CONTAINED AREA AWAY FROM SURFACE WATER.
4.ALL WORK IN OR ADJACENT TO STREAMS AND RIVERS SHALL BE
CONDUCTED SUCH THAT THE FLOWING WATER DOES NOT COME
IN CONTACT WITH THE DISTURBED WORK AREA.
5.UTILIZE A TEMPORARY IN-STREAM DIVERSION AT ALL TIMES
WHEN WORKING IN THE ACTIVE STREAM CHANNEL. SEE DETAIL,
SHEET 5.3.
6.CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF
LOW FLOW.
7.CONSTRUCTION SCHEDULING AND STAGING SHALL BE TIMED TO
MINIMIZE THE AMOUNT OF TIME SPENT WORKING IN THE RIVER
CHANNEL.
8.THE RIVERBANKS, IN-STREAM STRUCTURES AND WORK AREA
MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE
TEMPORARY IN-STREAM DIVERSIONS ARE REMOVED AND FLOW
IS RETURNED THE FULL CHANNEL.
9.ALL WASTE SOIL SHALL STAY ONSITE AND WILL BE DISPOSED OF
IN AREAS DESIGNATED ON THE PLANS. THE WASTE SOIL FOR THE
FUTURE WALKING TRAIL SHALL BE ROUGH-GRADED AND
STABILIZED WITH TEMPORARY AND PERMANENT SEEDING AND
MULCH
1.OBTAIN AND REVIEW THE INDIAN CREEK RESTORATION PROJECT,
EROSION AND SEDIMENTATION CONTROL PLAN AND ALL OTHER
APPLICABLE PERMITS.
2.FLAG THE WORK LIMITS AND STAKE OUT THE LIMITS OF
DISTURBANCE (LOD) OF THE PROJECT. THE TOTAL PROJECT LOD IS
0.36 AC.
3.LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORK AREA.
4.INSTALL RAIN GAUGE AND PREPARE INSPECTION FORMS.
5.HOLD PRE-CONSTRUCTION MEETING WITH THE PERMITTEE,
ENGINEER AND CONTRACTOR PRIOR TO STARTING ANY LAND
DISTURBING ACTIVITIES.
6.INSTALL ALL EROSION AND SEDIMENTATION CONTROL BMPS AS
SHOWN IN THE DRAWINGS AND DETAILS.
7.INSPECT EROSION PREVENTION AND SEDIMENT CONTROL BMPS
DAILY AND AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED
REPAIRS IMMEDIATELY. KEEP ALL LOGS AND RECORDS
UP-TO-DATE.
8.ACQUIRE AND STORE MATERIALS FOR SITE (E.G. ROCK, LOGS,
EROSION CONTROL MATTING AND FILTER FABRICS) IN THE
TEMPORARY STAGING AREAS.
9.CLEAR EXISTING VEGETATION REQUIRED TO COMPLETE THE
WORK TAKING CARE NOT TO DISTURB DESIRABLE VEGETATION
TO REMAIN INTACT.
10.GRADE THE RIVER BANKS AND INSTALL BANK STABILIZATION
STRUCTURES ACCORDING TO THE PLANS AND DETAILS. WHEN
POSSIBLE, PERFORM WORK FROM THE RIVER BANKS TO
MINIMIZE TIME SPENT WORKING IN THE CHANNEL.
11.WHEN WORKING IN THE CHANNEL, UTILIZE A TEMPORARY
IN-STREAM DIVERSION.
12.INSTALL TEMPORARY SEEDING, PERMANENT SEEDING, AND
EROSION CONTROL MATTING ON ALL DISTURBED RIVER BANKS
AND GRADED SLOPES AS SHOWN ON SHEET 2.1.
13.INSTALL TEMPORARY AND PERMANENT SEEDING AND MULCH TO
ALL AREAS DISTURBED FOR CONSTRUCTION ACCESS AND
STAGING AS SHOWN ON SHEET 5.1.
14.ONCE THE WORK AREA IS STABILIZED AND CONSTRUCTION
ACTIVITIES ARE COMPLETED, REMOVE AND DISPOSE OF ALL
NON-BIODEGRADABLE EROSION AND SEDIMENTATION CONTROL
BMPS.
15.NOTIFY THE PERMITEE AND THE ENGINEER FOR A FINAL
INSPECTION AND WALK THROUGH TO VERIFY FINAL
STABILIZATION OF THE SITE.
16.WHEN SEASONALLY APPROPRIATE, INSTALL PERMANENT
PLANTINGS ON RIVER BANKS AND WITHIN THE RIPARIAN ZONES
AS SHOWN ON SHEETS 6.1 THROUGH 6.2.
NOT TO SCALE
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
E
S
C
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
0
:
1
6
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
3
:
1
6
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
ES
C
D
E
T
A
I
L
S
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
5.3
SCALE (34"X22"):
SCALE (17"X11"):
WORK AREA
(LENGTH NOT TO EXCEED THAT WHICH
CAN BE COMPLETED IN ONE DAY)
FLOW
RIVER BA
N
K
FLOW
WORK AREA
TEMPORARY GRAVEL/COBBLE
BERM
RIVER BANK
DETAILED PLAN
NOT TO SCALE
TEMPORARY IN-STREAM DIVERSION
NOTES AND SPECIFICATIONS
1.EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED
STREAM BANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE
BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK
PROTECTION.
2.STREAM BANK EROSION CONTROL MATTING MATERIAL SPECIFICATIONS:
2.1.MACHINE DIRECTION TENSILE STRENGTH: 77 LB/IN
2.2.CROSS MATCH DIRECTION TENSILE STRENGTH: 86 LB/IN
2.3.APPARENT OPENING SIZE: 0.59” x 0.67”
2.4.PERCENT OPENING: 49%
2.5.MASS: 700 G/M2
3.BEFORE INSTALLING EROSION CONTROL MATTING, RAKE SOIL LEVEL, ADD
TEMPORARY AND PERMANENT SEED, SOIL PREPARATION AND MULCH.
4.EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW
CHANNEL FROM THE TOE OF SLOPE AT THE INNER BERM TO THE BANKFULL STAGE.
5.SECURE MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A
SHINGLE-TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME
DIRECTION AS THE STREAM FLOW AS SHOWN IN THE DETAIL. ADDITIONAL STAKING
SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING
SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL.
6.EROSION CONTROL MATTING USED ON ALL STREAM BANKS SHALL BE MADE OF 100%
NATURAL FIBERS AND MATERIALS AND BE BIODEGRADABLE UNDER NORMAL
CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR
PLASTIC BASED MATERIALS SHALL NOT BE USED.
EROSION CONTROL MATTING
NOTES AND SPECIFICATIONS
2'
EROSION CONTROL MATTING FROM TOE OF
SLOPE TO 3.0' BEYOND BANKFULL STAGE
BANKFULL
EROSION CONTROL
MATTING
ECO-STAKE MIN.
12" LENGTH
EDGE OVERLAP
MIN. 4" WITH DOUBLE
ECO-STAKES AT 2' O.C.EROSION CONTROL
MATTING
TOE OF
SLOPE
SECURE MATTING WITH 4" OVERLAP
AND DOUBLED ECO-STAKES
VERTICAL OVERLAP MIN. 12"
WITH DOUBLE ECO-STAKES
TURN DOWN
MATTING MIN. 6"
SINGLE 12"
ECO-STAKES OFFSET
ROWS AT 2'-3' O.C.
BANKFULL STAGE
A A'
BANKFULL STAGE
EXISTING
GROUND
DETAILED SECTION A - A'
NOT TO SCALE
DETAILED STAKING PLAN
NOT TO SCALE
TEMPORARY IN-STREAM DIVERSION
EROSION CONTROL MATTING
DETAILED PLAN
NOT TO SCALE
NTS
NTS
NOT TO SCALE
1.ALL WORK IN OR ADJACENT TO THE RIVER SHALL BE CONDUCTED SUCH THAT FLOW
DOES NOT COME IN CONTACT WITH THE DISTURBED WORK AREA.
2.CONSTRUCT A TEMPORARY IN-STREAM THAT DIRECTS FLOW AROUND THE WORK
AREA SUCH THAT FLOW DOES NOT INTERACT WITH DISTURBED EARTH AND
CONSTRUCTION MATERIALS.
3.IN-STREAM DIVERSION MAY BE CONSTRUCTED OF SANDBAGS, RIPRAP (NCDOT CLASS
B, OR EQUIVALENT), AND/OR EXISTING BED AND BANK MATERIAL APPROVED BY THE
ENGINEER.
4.CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW.
5.CONSTRUCTION SCHEDULING AND STAGING SHALL BE TIMED TO MINIMIZE THE
AMOUNT OF TIME SPENT WORKING IN THE RIVER CHANNEL.
6.THE RIVERBANKS, IN-STREAM STRUCTURES AND WORK AREA MUST BE STABILIZED
AT THE END OF EACH DAY BEFORE THE TEMPORARY DIVERSION IS REMOVED AND
FLOW IS RETURNED TO THE FULL CHANNEL.
7.AFTER THE WORK AREA IS STABILIZED, REMOVE THE MATERIAL USED TO CONSTRUCT
THE TEMPORARY DIVERSION AND RETURN THE RIVERBED TO THE
PRE-CONSTRUCTION CONDITION.
8.IN-STREAM DIVERSION SHALL BE INSPECTED WEEKLY OR AFTER EVERY RAIN EVENT.
ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY.
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
EVERETTE JR HIGHTOWER &
MARY O HIGHTOWER HLTE
PIN: 8546-56-7461-000
BOBBY C OWEN &
CRYSTAL OWEN
PIN: 8546-56-4086-000
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
V
E
G
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
4
9
:
5
2
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
3
:
2
4
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
RE
-
V
E
G
E
T
A
T
I
O
N
P
L
A
N
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
6.1
SCALE (34"X22"):
SCALE (17"X11"):
1" = 20'
1" = 40'
SCALE IN FEET
0 20 40
SCALE IN FEET
0 20 40
RE-VEGETATION PLAN LEGEND
ZONE 2 - RIPARIAN BUFFER
ZONE 1 - STREAMBANKS
ZONE 3 - SEED MIX ONLY
ZONE 1: STREAMBANKS
ZONE 2: RIPARIAN BUFFER
ZONE 3: SEED MIX ONLY
ZONE 2: RIPARIAN BUFFER
ZONE 1: STREAMBANKS
G:
\
S
H
A
R
E
D
D
R
I
V
E
S
\
C
A
D
\
1
9
T
R
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
\
1
9
0
3
E
W
P
I
N
D
I
A
N
C
R
J
E
S
S
E
H
I
G
H
T
O
W
E
R
(
4
0
6
)
\
D
W
G
\
1
9
0
3
_
S
H
T
_
V
E
G
.
D
W
G
|
MI
K
E
|
S
A
V
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
4
9
:
5
2
P
M
|
JE
_
G
R
A
Y
S
C
A
L
E
.
C
T
B
|
|
P
L
O
T
T
E
D
:
Mo
n
d
a
y
,
D
e
c
e
m
b
e
r
4
,
2
0
2
3
8
:
5
3
:
2
5
P
M
----------------
----------------
----------------
AP
P
R
V
DE
S
C
R
I
P
T
I
O
N
RE
V
7 SAMUEL ASHE DRIVE
ASHEVILLE, NC 28805
SHEET NUMBER
DATE:
DR
A
W
N
B
Y
:
CH
E
C
K
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
XX
MJ
H
MJ
H
PE
R
M
I
T
D
R
A
W
I
N
G
RE
-
V
E
G
E
T
A
T
I
O
N
N
O
T
E
S
&
P
L
A
N
T
I
N
G
S
C
H
E
D
U
L
E
S
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
E
W
P
IN
D
I
A
N
C
R
E
E
K
R
E
S
T
O
R
A
T
I
O
N
HI
G
H
T
O
W
E
R
TR
A
N
S
Y
L
V
A
N
I
A
C
O
U
N
T
Y
,
NO
R
T
H
C
A
R
O
L
I
N
A
12/4/2023
6.2
SCALE (34"X22"):
SCALE (17"X11"):
GENERAL RE-VEGETATION AND PLANTING NOTES
1. FINAL VEGETATION SPECIES SELECTION MAY CHANGE DUE TO
REFINEMENT OR SPECIES AVAILABILITY AT THE TIME OF PLANTING.
SPECIES SUBSTITUTIONS WILL BE COORDINATED BETWEEN THE BANK
MANAGER, ENGINEER AND PLANTING CONTRACTOR PRIOR TO THE
PROCUREMENT OF PLANT/SEED STOCK.
2. LARGER NATIVE TREE SPECIES TO BE PRESERVED WILL BE FLAGGED BY
THE ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES. ANY TREES
HARVESTED FOR WOODY MATERIAL WILL BE UTILIZED TO PROVIDE BED
AND BANK STABILIZATION AND COVER OR NESTING HABITAT ON THE
FLOODPLAIN. ANY EXCESS WOODY MATERIALS MAY USED TO BACKFILL
OLD CHANNELS.
3. ALL DISTURBED AREAS WILL BE STABILIZED USING TEMPRORY AND
PERMERMANET SEEDING AS DEFINED IN THE SEEDING SCHEDULE AND
THE APPROVED E&SC PLANS.
4. SUPPLEMENTAL PLANTING ACTIVITIES MAY BE REQUIRED WITHIN
THE CONSERVATION EASEMENT.
TEMPORARY SEEDING AND MULCHING NOTES
5. TEMPORARY SEEDING SHALL BE APPLIED TO DENUDED AREAS THAT
WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN
21 CALENDAR DAYS.
6. TEMPORARY SEEDING AND MULCHING SHALL BE APPLIED TO ALL
AREAS AND ACCESS ROUTES DISTURBED DURING CONSTRUCTION.
7. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND
FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES.
8. ALL DISTURBED AREAS WILL BE SEEDED WITH TEMPORARY SEED AND
MULCHED WITH WHEAT STRAW. SEEDING WILL BE
PERFORMED USING A BROADCAST SPREADER. OTHER METHODS MAY
BE USED BUT MUST BE APPROVED BY ENGINEER IN ADVANCE OF
INSTALLATION.
9. MAINTENANCE OF SEEDED AREAS SHALL CONSIST OF WATERING,
WEED AND PEST CONTROL, FERTILIZATION, EROSION REPAIR,
RESEEDING, AND INCIDENTAL OPERATIONS AS NECESSARY TO
ESTABLISH A HEALTHY, VIGOROUS, WEED FREE AND DISEASE FEE
UNIFORM STAND OF GRASS. ALL AREAS WHICH FAIL TO SHOW A
UNIFORM STAND OF GRASS FOR ANY REASON SHALL BE TREATED
REPEATEDLY UNTIL A UNIFORM STAND OF AT LEAST 90% COVERAGE IS
ATTAINED WITH NO BARE AREA GREATER THAN FIVE (5) SQUARE FEET.
PERMANENT SEEDING NOTES
10. AREAS TO BE STABILIZED WITH PERMANENT VEGETATION MUST BE
SEEDED OR PLANTED WITHIN 15 WORKING DAYS OR 90 CALENDAR
DAYS AFTER FINAL GRADE IS REACHED, UNLESS TEMPORARY
STABILIZATION IS APPLIED. PERMANENT SEEDING MAY ALSO BE USED
ON ROUGH-GRADED AREAS THAT WILL NOT BE BROUGHT TO FINAL
GRADE FOR A YEAR OR MORE.
11. PERMANENT SEEDING SHALL OCCUR IN CONJUNCTION WITH
TEMPORARY SEEDING WHERE APPLICABLE. IDEALLY, PERMANENT
SEEDING SHALL OCCUR DURING THE PLANTING SEASON FOR EACH SEED
TYPE. AREAS FERTILIZED FOR TEMPORARY SEEDING SHALL BE
SUFFICIENTLY FERTILIZED FOR PERMANENT SEEDING; ADDITIONAL
FERTILIZER IS NOT REQUIRED FOR PERMANENT SEEDING.
12. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND
FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES.
13. THE CONTRACTOR SHALL LOOSEN THE SOIL TO A MINIMUM DEPTH
OF 4-INCHES AND GRADE TO A SMOOTH, EVEN SURFACE WITH A LOOSE,
UNIFORMLY FINE TEXTURE. THE AREAS TO BE SEEDED ARE THEN TO BE
ROLLED AND RAKED TO REMOVE RIDGES AND FILL DEPRESSIONS TO
MEET FINISH GRADES. THE CONTRACTOR IS TO LIMIT SUB GRADE AND
FINISH GRADE PREPARATION TO AREAS THAT WILL BE PLANTED
IMMEDIATELY. PREPARED AREAS ARE TO BE RESTORED IF ERODED OR
OTHERWISE DISTURBED AFTER FINE GRADING AND BEFORE PLANTING.
14. SEED SHALL BE SOWN WITH A SPREADER OR A SEEDING MACHINE.
SEED IS NOT TO BE BROADCAST OR DROPPED WHEN WIND VELOCITY
EXCEEDS 5 MPH. SEED SHALL BE EVENLY DISTRIBUTED BY SOWING IN
TWO DIRECTIONS AT RIGHT ANGLES TO EACH OTHER. WET SEED OR
SEED THAT IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR
STORAGE IS NOT TO BE USED. AFTER BEGIN SOWN, THE SEED SHALL BE
RAKED INTO THE TOP 1/4 INCH OF THE TOPSOIL, LIGHTLY ROLLED, AND
WATERED WITH FINE SPRAY. SEEDED AREAS ON STREAM BANKS SHALL
BE PROTECTED WITH COIR FIBER MATTING.
ZONE 1: STREAMBANK
15. LIVESTAKES AND HERBACEOUS PLUGS LISTED IN THE PLANTING
SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 4,840
STEMS PER ACRE (3.0' O.C.) FROM TOE OF THE RESTORED CHANNEL TO
2.0' OUTSIDE THE BANKFULL STAGE. HERBACEOUS PLUGS SHALL BE
PLANTED ALONG THE TOE OF THE CHANNEL IN THE OUTSIDE OF THE
POOL MEANDER BENDS.
ZONE 2: RIPARIAN BUFFER
16. WOODY SPECIES LISTED IN THE PLANTING SCHEDULE SHALL BE
PLANTED IN OFFSET ROWS AT A DENSITY OF 440 STEMS PER ACRE (10.0'
O.C.) FROM 2.0' OUTSIDE THE BANKFULL STAGE TO THE GRADING
LIMITS. EXACT PLACEMENT OF THE SPECIES SHALL BE DETERMINED BY
THE CONTRACTOR’S VEGETATION SPECIALIST PRIOR TO SITE PLANTING
AND BASED ON THE WETNESS CONDITIONS OF PLANTING LOCATIONS.
TEMPORARY SEEDING SCHEDULEPERMANENT SEEDING SCHEDULE
NTS
NTS
NOT TO SCALE
ZONE 1: STREAMBANKS ZONE 2: RIPARIAN BUFFER