Loading...
HomeMy WebLinkAbout20230801 Ver 1_Initial Evaluation of the South Fork Catawba UMB and South Fork Mitigation Site /Lincoln CountyCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Michael, Please see the attached Initial Evaluation Letter for the Lower Catawba UMB and South Fork Mitigation Site. After careful review of the information submitted in the final prospectus, our field review of the site, and the comments provided by the IRT, we have continued concerns about a number of issues we had previously identified. Because of this, we have concluded that the site as currently proposed is not suitable to provide compensatory mitigation for activities authorized by DA permits. The letter provides more information on these specific concerns, and I am also availalbe to discuss our decision in more detail if you would like. If you choose to revise the proposed plans, you can resubmit your prospectus for review; however, please note that this will restart our review process and will require additional coordination with the IRT and possibly reissuance of a public notice, depending on the extent of the changes. Also, if you choose to do this, please be aware that the modification must fully address the concerns that we and the IRT have regarding the site. Thank you and please let me know if you have any questions. Todd Tugwell Chief, Mitigation Branch Regulatory Division Wilmington District, USACE (919) 210-6265 From: Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil> Sent: Tuesday, September 19, 2023 6:23 PM Subject: Notice of Final Prospectus Review/ South Fork Catawba UMB- South Fork / SAW-2023-00927/ Lincoln County Hello IRT, Eco Terra, LLC, on behalf of South Fork Mitigation, LLC, has submitted a FINAL Prospectus for the South Fork Catawba UMB- South Fork Mitigation Site. The Final Prospectus has been uploaded to RIBITS (link below). Per section 332.8(d)(4), we are initiating the IRT 30-day review of the Final Prospectus with this email. The Public Notice was posted on Tuesday September 19, 2023 (link below), with the public notice comment deadline of October 19, 2023. IRT Comment Start Date: September 20, 2023 IRT Comment Deadline: October 20, 2023 Initial Evaluation Deadline: November 18, 2023 Bank Information: Umbrella Bank Name: South Fork Catawba UMB Site Name: South Fork Mitigation Site Sponsor: South Fork Mitigation, LLC Sponsor POC: Eco Terra, LLC, Michael Beinenson, mitigation@ecoterra.com <mailto:mitigation@ecoterra.com> USACE Action ID: SAW-2023-00927 Cataloging Unit: 03050102, Catawba River Basin County: Lincoln Coordinates: 35.484031, -81.274811 Conservation Easement: 35 acres RIBITS “Eco Terra – South Fork Catawba UMB – South Fork” Bank Site Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:408802593689:::RP,278:P278_BANK_ID:6608 <https://ribits.op s.usace.army.mil/ords/f?p=107:278:408802593689:::RP,278:P278_BANK_ID:6608> Please note that you must be logged in to access documents in the cyber repository. RIBITS Public Notice Link: https://ribits.ops.usace.army.mil/ords/f?p=107:622:408802593689::NO <https://ribits.ops.usace.army.mil/ords/f?p=107:622:408802593689::NO> USACE Bank Project Manager: Steve Kichefski, Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> USACE Mitigation Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> Please reach out if you have questions. Thank you, Erin Erin B. Davis Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 930-1887 work cell Eco Terra, LLC, on behalf of South Fork Mitigation, LLC, has submitted a FINAL Prospectus for the South Fork Catawba UMB- South Fork Mitigation Site. The Final Prospectus has been uploaded to RIBITS (link below). Per section 332.8(d)(4), we are initiating the IRT 30-day review of the Final Prospectus with this email. The Public Notice was posted on Tuesday September 19, 2023 (link below), with the public notice comment deadline of October 19, 2023. IRT Comment Start Date: September 20, 2023 IRT Comment Deadline: October 20, 2023 Initial Evaluation Deadline: November 18, 2023 Bank Information: Umbrella Bank Name: South Fork Catawba UMB Site Name: South Fork Mitigation Site Sponsor: South Fork Mitigation, LLC Sponsor POC: Eco Terra, LLC, Michael Beinenson, mitigation@ecoterra.com USACE Action ID: SAW-2023-00927 Cataloging Unit: 03050102, Catawba River Basin County: Lincoln Coordinates: 35.484031, -81.274811 Conservation Easement: 35 acres RIBITS “Eco Terra – South Fork Catawba UMB – South Fork” Bank Site Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:408802593689:::RP,278:P278_BANK_ID:6608 Please note that you must be logged in to access documents in the cyber repository. RIBITS Public Notice Link: https://ribits.ops.usace.army.mil/ords/f?p=107:622:408802593689::NO USACE Bank Project Manager: Steve Kichefski, Steven.L.Kichefski@usace.army.mil USACE Mitigation Specialist: Erin Davis, Erin.B.Davis@usace.army.mil Please reach out if you have questions. Thank you, Erin Erin B. Davis Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 930-1887 work cell 2