HomeMy WebLinkAbout20230801 Ver 1_Initial Evaluation of the South Fork Catawba UMB and South Fork Mitigation Site /Lincoln CountyCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home
tab.
Michael,
Please see the attached Initial Evaluation Letter for the Lower Catawba UMB and South Fork Mitigation Site. After careful review of the information submitted in the final prospectus,
our field review of the site, and the comments provided by the IRT, we have continued concerns about a number of issues we had previously identified. Because of this, we have concluded
that the site as currently proposed is not suitable to provide compensatory mitigation for activities authorized by DA permits. The letter provides more information on these specific
concerns, and I am also availalbe to discuss our decision in more detail if you would like.
If you choose to revise the proposed plans, you can resubmit your prospectus for review; however, please note that this will restart our review process and will require additional coordination
with the IRT and possibly reissuance of a public notice, depending on the extent of the changes. Also, if you choose to do this, please be aware that the modification must fully address
the concerns that we and the IRT have regarding the site.
Thank you and please let me know if you have any questions.
Todd Tugwell
Chief, Mitigation Branch
Regulatory Division
Wilmington District, USACE
(919) 210-6265
From: Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>
Sent: Tuesday, September 19, 2023 6:23 PM
Subject: Notice of Final Prospectus Review/ South Fork Catawba UMB- South Fork / SAW-2023-00927/ Lincoln County
Hello IRT,
Eco Terra, LLC, on behalf of South Fork Mitigation, LLC, has submitted a FINAL Prospectus for the South Fork Catawba UMB- South Fork Mitigation Site. The Final Prospectus has been uploaded
to RIBITS (link below). Per section 332.8(d)(4), we are initiating the IRT 30-day review of the Final Prospectus with this email. The Public Notice was posted on Tuesday September
19, 2023 (link below), with the public notice comment deadline of October 19, 2023.
IRT Comment Start Date: September 20, 2023
IRT Comment Deadline: October 20, 2023
Initial Evaluation Deadline: November 18, 2023
Bank Information:
Umbrella Bank Name: South Fork Catawba UMB
Site Name: South Fork Mitigation Site
Sponsor: South Fork Mitigation, LLC
Sponsor POC: Eco Terra, LLC, Michael Beinenson, mitigation@ecoterra.com <mailto:mitigation@ecoterra.com>
USACE Action ID: SAW-2023-00927
Cataloging Unit: 03050102, Catawba River Basin
County: Lincoln
Coordinates: 35.484031, -81.274811
Conservation Easement: 35 acres
RIBITS “Eco Terra – South Fork Catawba UMB – South Fork” Bank Site Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:408802593689:::RP,278:P278_BANK_ID:6608 <https://ribits.op
s.usace.army.mil/ords/f?p=107:278:408802593689:::RP,278:P278_BANK_ID:6608>
Please note that you must be logged in to access documents in the cyber repository.
RIBITS Public Notice Link: https://ribits.ops.usace.army.mil/ords/f?p=107:622:408802593689::NO <https://ribits.ops.usace.army.mil/ords/f?p=107:622:408802593689::NO>
USACE Bank Project Manager: Steve Kichefski, Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil>
USACE Mitigation Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil>
Please reach out if you have questions.
Thank you,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 930-1887 work cell
Eco Terra, LLC, on behalf of South Fork Mitigation, LLC, has submitted a FINAL Prospectus for the South Fork Catawba
UMB- South Fork Mitigation Site. The Final Prospectus has been uploaded to RIBITS (link below). Per section 332.8(d)(4),
we are initiating the IRT 30-day review of the Final Prospectus with this email. The Public Notice was posted on Tuesday
September 19, 2023 (link below), with the public notice comment deadline of October 19, 2023.
IRT Comment Start Date: September 20, 2023
IRT Comment Deadline: October 20, 2023
Initial Evaluation Deadline: November 18, 2023
Bank Information:
Umbrella Bank Name: South Fork Catawba UMB
Site Name: South Fork Mitigation Site
Sponsor: South Fork Mitigation, LLC
Sponsor POC: Eco Terra, LLC, Michael Beinenson, mitigation@ecoterra.com
USACE Action ID: SAW-2023-00927
Cataloging Unit: 03050102, Catawba River Basin
County: Lincoln
Coordinates: 35.484031, -81.274811
Conservation Easement: 35 acres
RIBITS “Eco Terra – South Fork Catawba UMB – South Fork” Bank Site Cyber Repository Link:
https://ribits.ops.usace.army.mil/ords/f?p=107:278:408802593689:::RP,278:P278_BANK_ID:6608
Please note that you must be logged in to access documents in the cyber repository.
RIBITS Public Notice Link: https://ribits.ops.usace.army.mil/ords/f?p=107:622:408802593689::NO
USACE Bank Project Manager: Steve Kichefski, Steven.L.Kichefski@usace.army.mil
USACE Mitigation Specialist: Erin Davis, Erin.B.Davis@usace.army.mil
Please reach out if you have questions.
Thank you,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 930-1887 work cell
2