HomeMy WebLinkAboutNCC216805_Annual Fee Invoice Email_20231201Holloman, Tevye L
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Friday, December 1, 2023 4:16 AM
To: And rew.Norton@fredsmithcom pany.net
Cc: Andrew.Norton@fredsmithcompany.net; Scott.Bradsher@fredsmithcompany.net;
Georgoulias, Bethany; Holloman, Tevye L
Subject: [External] Construction Stormwater Permit Annual Fee - NCC216805
Attachments: NCC216805-Annual Fee Invoice_20231201.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Attached is the 2023 annual fee invoice for your Construction Stormwater NPDES permit, COC no. NCC216805. When
using the ePayment website (https://www.deq.nc.gov/sw-epayments), be sure to enter ONLY the COC permit number
(not the invoice number with "-2023" after it). Please contact Tev Holloman at tev.holloman@deq.nc.gov.gov with any
questions.
If this project has been closed out, you must submit a Notice of Termination (NOT) request here:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination
Permittee: FSC II,LLC
Project Name: FSC Goldsboro Asphalt Plant
Project Location: Fork Township
County: Wayne
Please note that effective October 3, 2023, the annual fee for this general permit has increased to $120.
Sincerely,
The DEMLR Stormwater Program
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.