Loading...
HomeMy WebLinkAbout20221576 Ver 1_updated correction information_20231130 (5)Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTALS*: *Rounded totals are sum of actual impacts NOTES: Station (From/To) 60+21 to 74+19 -L2AB- 91+43 to 92+51 -L2AB- 102+20 -L2AB- 102+20 -L2AB- 11+54 to 12+67 -SR1- 12+95 to 14+81 -SR1- 112+54 -L2AB- 112+54 -L2AB- 10+00 to 11+19 -L2NB-RT 20+00 to 23+54 -SR1- 24+90 to 26+00 -SR1- 11+53 -L2AB-SPB-LT 129+12 to 130+98 -L2AB- 133+70 to 134+56 -L2AB- 20+35 to 20+72 -L2AB-RPA-RT 17+39 to 19+43 -Y2-LT Structure Size / Type Roadway Fill - WBJ Roadway Fill - WCH Roadway Fill - WCD Roadway Fill - WCE Roadway Fill - WCF Roadway Fill - WCG Roadway Fill - WBK Bridge - SR Roadway Fill - PG XX RCP-IV - SO Roadway Fill - PF Roadway Fill - PE Roadway Fill - WAI RCBC - SL/SM Roadway Fill - SN Roadway Fill - WAA Roadway Fill - WZ Roadway Fill - WAB RCP/Roadway Fill - WT Roadway Fill - WAG RCP/Roadway Fill - WS Roadway Fill - WAH Roadway Fill - WAF Roadway Fill - WV ENTER DATA ON THIS TAB AND PRINT FROM THE PRINT PAGE TAB WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.134 0.051 0.003 0.033 0.0002 0.004 2.003 0.1919 0.1201 0.5477 0.019 0.0155 0.6794 0.1079 0.0327 0.0185 0.0931 4.054 Temp. Fill In Wetlands (ac) 0 Excavation in Wetlands (ac) 0 Mechanized Clearing in Wetlands (ac) 0 Hand Clearing in Wetlands (ac) 0 SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.2281 0.0055 0.4188 0.2491 0.0646 0.0084 0.9745 Temp. SW impacts (ac) 0 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS May 2023 Chatham County Project Blue - Phase 2B HE-0006 SHEET Existing Channel Impacts Permanent (ft) 121 942 122 1185 26 Existing Channel Impacts Temp. (ft) 0 OF Natural Stream Design (ft) 0 27 Site No. 1 Station (From/To) 60+21 to 74+19 -L2AB- Structure Size / Type Roadway Fill - WBJ Roadway Fill - WCH Roadway Fill - WCD Roadway Fill - WCE Roadway Fill - WCF Roadway Fill - WCG Roadway Fill - WBK Bridge - SR Total Site 1 Permanent Fill In Wetlands (ac) 0.134 0.051 0.003 0.033 0 0.004 2.003 2.228 Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTALS*: *Rounded totals are sum of actual impacts NOTES: Station (From/To) 60+21 to 74+19 -L2AB- 91+43 to 92+51 -L2AB- 102+20 -L2AB- 102+20 -L2AB- 11+54 to 12+67 -SR1- 12+95 to 14+81 -SR1- 112+54 -L2AB- 112+54 -L2AB- 10+00 to 11+19 -L2NB-RT 20+00 to 23+54 -SR1- 24+90 to 26+00 -SR1- 11+53 -L2AB-SPB-LT 129+12 to 130+98 -L2AB- 133+70 to 134+56 -L2AB- 20+35 to 20+72 -L2AB-RPA-RT 17+39 to 19+43 -Y2-LT Structure Size / Type Roadway Fill - WBJ Roadway Fill - WCH Roadway Fill - WCD Roadway Fill - WCE Roadway Fill - WCF Roadway Fill - WCG Roadway Fill - WBK Bridge - SR Roadway Fill - PG XX RCP-IV - SO Roadway Fill - PF Roadway Fill - PE Roadway Fill - WAI RCBC - SL/SM Roadway Fill - SN Roadway Fill - WAA Roadway Fill - WZ Roadway Fill - WAB RCP/Roadway Fill - WT Roadway Fill - WAG RCP/Roadway Fill - WS Roadway Fill - WAH Roadway Fill - WAF Roadway Fill - WV THIS SHEET IS AUTOMATICALLY POPULATED FROM THE DATA ENTRY PAGE TAB WORKSHEET PASSWORD = NCDOT WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.13 0.05 < 0.01 0.03 < 0.01 < 0.01 2 0.19 0.12 0.55 0.02 0.02 0.68 0.11 0.03 0.02 0.09 4.05 Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.23 < 0.01 0.42 0.25 0.06 < 0.01 0.97 Temp. SW impacts (ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS May 2023 Chatham County Project Blue - Phase 2B HE-0006 SHEET Existing Channel Impacts Permanent (ft) 121 942 122 1185 26 Existing Channel Impacts Temp. (ft) 0 OF Natural Stream Design (ft) 0 27 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ha) Temp. Fill In Wetlands (ha) Excavation in Wetlands (ha) Mechanized Clearing in Wetlands (ha) Hand Clearing in Wetlands (ha) SURFACE WATER IMPACTS Permanent SW impacts (ha) Temp. SW impacts (ha) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (m) Natural Stream Design (m) 11/30/2023 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) Temp. SW impacts (ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (ft) Natural Stream Design (ft) 11/30/2023