Loading...
HomeMy WebLinkAbout20221576 Ver 1_Request to correct 401_20231122 (9)Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 1 2 3 4 5 TOTALS*: *Rounded totals are sum of actual impacts NOTES: ** Site 5 Roadway Fill - PA is total pond take. *** Tributary to waters of the U.S. No linear impacts required. Station (From/To) 14+66 to 19+50 -Y2LPA- 17+82 -Y2RPB-Y2LPA- 35+00 -Y2- 17+94 -Y2_RPB- 53+25 -Y2-LT 12+31-DR1-RT 28+00 -Y2-LT Structure Size / Type Roadway Fill - WG 48" RCP-V - SG 60" RCP-III - SG 66" RCP-IV - SG ***18" RCP-III - TC Roadway Fill - WI **Roadway Fill - PA ENTER DATA ON THIS TAB AND PRINT FROM THE PRINT PAGE TAB WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.96 0.96 Temp. Fill In Wetlands (ac) 0 Excavation in Wetlands (ac) 0.08 0.08 Mechanized Clearing in Wetlands (ac) 0.04 0.0036 0.0436 Hand Clearing in Wetlands (ac) 0 SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.0029 0.002 0.013 0.0013 0.7403 0.7595 Temp. SW impacts (ac) 0.0003 0.0041 0.0016 0.0006 0.0066 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS August 2023 Chatham County Project Blue - Phase 1C HE-0006 SHEET Existing Channel Impacts Permanent (ft) 91 23.343 161 275.343 13 Existing Channel Impacts Temp. (ft) 8 39 24 71 OF Natural Stream Design (ft) 0 13 Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 1 2 3 4 5 TOTALS*: *Rounded totals are sum of actual impacts NOTES: ** Site 5 Roadway Fill - PA is total pond take. *** Tributary to waters of the U.S. No linear impacts required. Station (From/To) 14+66 to 19+50 -Y2LPA- 17+82 -Y2RPB-Y2LPA- 35+00 -Y2- 17+94 -Y2_RPB- 53+25 -Y2-LT 12+31-DR1-RT 28+00 -Y2-LT Structure Size / Type Roadway Fill - WG 48" RCP-V - SG 60" RCP-III - SG 66" RCP-IV - SG ***18" RCP-III - TC Roadway Fill - WI **Roadway Fill - PA THIS SHEET IS AUTOMATICALLY POPULATED FROM THE DATA ENTRY PAGE TAB WORKSHEET PASSWORD = NCDOT WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.96 0.96 Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) 0.08 0.08 Mechanized Clearing in Wetlands (ac) 0.04 < 0.01 0.04 Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) < 0.01 < 0.01 0.01 < 0.01 0.74 0.76 Temp. SW impacts (ac) < 0.01 < 0.01 < 0.01 < 0.01 < 0.01 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS August 2023 Chatham County Project Blue - Phase 1C HE-0006 SHEET Existing Channel Impacts Permanent (ft) 91 23.343 161 275.343 13 Existing Channel Impacts Temp. (ft) 8 39 24 71 OF Natural Stream Design (ft) 0 13 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ha) Temp. Fill In Wetlands (ha) Excavation in Wetlands (ha) Mechanized Clearing in Wetlands (ha) Hand Clearing in Wetlands (ha) SURFACE WATER IMPACTS Permanent SW impacts (ha) Temp. SW impacts (ha) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (m) Natural Stream Design (m) 11/30/2023 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) Temp. SW impacts (ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (ft) Natural Stream Design (ft) 11/30/2023