Loading...
HomeMy WebLinkAbout20221576 Ver 1_Request to correct 401_20231122 (5)Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 1 2 3 4 5 6 7 8 9 TOTALS*: *Rounded totals are sum of actual impacts NOTES: ** Site 6 Roadway Fill - PCA is total pond take. Site 7 Wetland WBB is total take. *** Tributary to waters of the U.S. No linear impacts required. Station (From/To) 16+00 to 16+88 -L1BC- 20+39 to 30+60 -L1BC- 30+04 to 33+76 -L1BC- 54+32 to 56+28 -L1BC- 184+50 -Y1- 58+63 to 68+60 -L1BC-LT 71+50 -L1BC- 168+78 to 169+82 -Y1-LT 198+00 -Y1-RT 209+00 -Y1-RT Structure Size / Type 72" RCP-III - WL 2@8'x8' RCBC - SCB Bank Stabilization - SCB Roadway Fill - WM 72" RCP-IV - SCA Roadway Fill - WO 60" WSP - WN 2@60" WSP, 60" WSP - SCA *** Roadway Fill - WJ/TE Roadway Fill - WCA **Roadway Fill - PCA 54" WSP - SBD Bank Stabilization - SBD 60" WSP - WBB Roadway Fill - WBD Roadway Fill - WBB 2@48" WSP - SCB 42" WSP- SBB *** Bank Stabilization - TG Roadway Fill - WK Bank Stabilization - SBB ENTER DATA ON THIS TAB AND PRINT FROM THE PRINT PAGE TAB WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.19 1.65 0.0003 0.06 0.56 0.01 0.04 0.02 2.5303 Temp. Fill In Wetlands (ac) 0.02 0.1 0.02 0.04 0.0013 0.004 0.1853 Excavation in Wetlands (ac) 0.0054 0.05 0.0554 Mechanized Clearing in Wetlands (ac) 0.024 0.234 0.014 0.04 0.08 0.0085 0.02 0.03 0.4505 Hand Clearing in Wetlands (ac) 0 SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.0243 0.0071 0.0208 0.0069 0.0022 0.8214 0.0005 0.0012 0.0065 0.0013 0.0006 0.0036 0.8964 Temp. SW impacts (ac) 0.013 0.0081 0.0014 0.0054 0.0101 0.0016 0.001 0.0025 0.0431 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS August 2023 Chatham County Project Blue - Phase 1B HE-0006 SHEET Existing Channel Impacts Permanent (ft) 209.5914 61.8489 296.7731 82.4605 62.31 10.7794 20.1009 89.1195 12.9148 49.5611 895.4596 33 Existing Channel Impacts Temp. (ft) 112.052 56.3299 39.2 111 40.0401 25 36.2357 419.8577 OF Natural Stream Design (ft) 0 33 Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 1 2 3 4 5 6 7 8 9 TOTALS*: *Rounded totals are sum of actual impacts NOTES: ** Site 6 Roadway Fill - PCA is total pond take. Site 7 Wetland WBB is total take. *** Tributary to waters of the U.S. No linear impacts required. Station (From/To) 16+00 to 16+88 -L1BC- 20+39 to 30+60 -L1BC- 30+04 to 33+76 -L1BC- 54+32 to 56+28 -L1BC- 184+50 -Y1- 58+63 to 68+60 -L1BC-LT 71+50 -L1BC- 168+78 to 169+82 -Y1-LT 198+00 -Y1-RT 209+00 -Y1-RT Structure Size / Type 72" RCP-III - WL 2@8'x8' RCBC - SCB Bank Stabilization - SCB Roadway Fill - WM 72" RCP-IV - SCA Roadway Fill - WO 60" WSP - WN 2@60" WSP, 60" WSP - SCA *** Roadway Fill - WJ/TE Roadway Fill - WCA **Roadway Fill - PCA 54" WSP - SBD Bank Stabilization - SBD 60" WSP - WBB Roadway Fill - WBD Roadway Fill - WBB 2@48" WSP - SCB 42" WSP- SBB *** Bank Stabilization - TG Roadway Fill - WK Bank Stabilization - SBB THIS SHEET IS AUTOMATICALLY POPULATED FROM THE DATA ENTRY PAGE TAB WORKSHEET PASSWORD = NCDOT WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.19 1.65 < 0.01 0.06 0.56 0.01 0.04 0.02 2.53 Temp. Fill In Wetlands (ac) 0.02 0.1 0.02 0.04 < 0.01 < 0.01 0.19 Excavation in Wetlands (ac) < 0.01 0.05 0.06 Mechanized Clearing in Wetlands (ac) 0.02 0.23 0.01 0.04 0.08 < 0.01 0.02 0.03 0.45 Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.02 < 0.01 0.02 < 0.01 < 0.01 0.82 < 0.01 < 0.01 < 0.01 < 0.01 < 0.01 < 0.01 0.9 Temp. SW impacts (ac) 0.01 < 0.01 < 0.01 < 0.01 0.01 < 0.01 < 0.01 < 0.01 0.04 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS August 2023 Chatham County Project Blue - Phase 1B HE-0006 SHEET Existing Channel Impacts Permanent (ft) 209.5914 61.8489 296.7731 82.4605 62.31 10.7794 20.1009 89.1195 12.9148 49.5611 895.4596 33 Existing Channel Impacts Temp. (ft) 112.052 56.3299 39.2 111 40.0401 25 36.2357 419.8577 OF Natural Stream Design (ft) 0 33 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ha) Temp. Fill In Wetlands (ha) Excavation in Wetlands (ha) Mechanized Clearing in Wetlands (ha) Hand Clearing in Wetlands (ha) SURFACE WATER IMPACTS Permanent SW impacts (ha) Temp. SW impacts (ha) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (m) Natural Stream Design (m) 11/30/2023 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) Temp. SW impacts (ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (ft) Natural Stream Design (ft) 11/30/2023