Loading...
HomeMy WebLinkAbout20221576 Ver 1_Request to correct 401_20231122 (11)Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 14 15 16 17 18 19 20 21 GRAND TOTALS*: *Rounded totals are sum of actual impacts NOTES: Station (From/To) 18+00 -L2AB-RPC- 18+00 to 22+42 -L2AB-RPB-LT 18+00 to 22+42 -L2AB-RPC-RT 18+75 to 23+27 -L2AB-RPC-RT 19+07 to 19+40 -L2AB-RPD-LT 77+12 to 81+95 -Y2-RT 81+49 -Y2- 16+50 to 23+45 -Y3- 21+00 to 24+46 -Y4- 22+70 to 25+73 -Y3 27+00 to 29+00 -Y3-LT Total from Sheet 1 Total from Sheet 2 Structure Size / Type RCBC - SK Roadway Fill - WU Roadway Fill - WX Roadway Fill - SU Roadway Fill - WAC Roadway Fill - WAE RCBC - SR Roadway Fill - WAN Roadway Fill - WAP Roadway Fill - WAO Roadway Fill - PI ENTER DATA ON THIS TAB AND PRINT FROM THE PRINT PAGE TAB WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.306 1.6206 0.028 0.0738 0.7154 0.4167 0.1883 4.054 3.3488 7.4028 Temp. Fill In Wetlands (ac) 0 Excavation in Wetlands (ac) 0 Mechanized Clearing in Wetlands (ac) 0 Hand Clearing in Wetlands (ac) 0 SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.071 0.0322 0.0645 0.3891 0.975 0.5568 1.5318 Temp. SW impacts (ac) 0 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS May 2023 Chatham County Project Blue - Phase 2B HE-0006 SHEET Existing Channel Impacts Permanent (ft) 363.8 465 119 1185 947.8 2132.8 27 Existing Channel Impacts Temp. (ft) 0 OF Natural Stream Design (ft) 0 27 Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 14 15 16 17 18 19 20 21 TOTALS*: *Rounded totals are sum of actual impacts NOTES: Station (From/To) 18+00 -L2AB-RPC- 18+00 to 22+42 -L2AB-RPB-LT 18+00 to 22+42 -L2AB-RPC-RT 18+75 to 23+27 -L2AB-RPC-RT 19+07 to 19+40 -L2AB-RPD-LT 77+12 to 81+95 -Y2-RT 81+49 -Y2- 16+50 to 23+45 -Y3- 21+00 to 24+46 -Y4- 22+70 to 25+73 -Y3 27+00 to 29+00 -Y3-LT Total from Sheet 1 Total from Sheet 2 Structure Size / Type RCBC - SK Roadway Fill - WU Roadway Fill - WX Roadway Fill - SU Roadway Fill - WAC Roadway Fill - WAE RCBC - SR Roadway Fill - WAN Roadway Fill - WAP Roadway Fill - WAO Roadway Fill - PI THIS SHEET IS AUTOMATICALLY POPULATED FROM THE DATA ENTRY PAGE TAB WORKSHEET PASSWORD = NCDOT WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.31 1.62 0.03 0.07 0.72 0.42 0.19 4.05 3.35 7.4 Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.07 0.03 0.06 0.39 0.98 0.56 1.54 Temp. SW impacts (ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS May 2023 Chatham County Project Blue - Phase 2B HE-0006 SHEET Existing Channel Impacts Permanent (ft) 363.8 465 119 1185 947.8 2132.8 27 Existing Channel Impacts Temp. (ft) 0 OF Natural Stream Design (ft) 0 27 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ha) Temp. Fill In Wetlands (ha) Excavation in Wetlands (ha) Mechanized Clearing in Wetlands (ha) Hand Clearing in Wetlands (ha) SURFACE WATER IMPACTS Permanent SW impacts (ha) Temp. SW impacts (ha) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (m) Natural Stream Design (m) 11/30/2023 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) Temp. SW impacts (ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (ft) Natural Stream Design (ft) 11/30/2023