HomeMy WebLinkAbout20221576 Ver 1_Request to correct 401_20231122 (11)Revised 2018 Feb
WETLAND AND SURACE WATER IMPACTS SUMMARY
Site
No.
14
15
16
17
18
19
20
21
GRAND TOTALS*:
*Rounded totals are sum of actual impacts
NOTES:
Station
(From/To)
18+00 -L2AB-RPC-
18+00 to 22+42 -L2AB-RPB-LT
18+00 to 22+42 -L2AB-RPC-RT
18+75 to 23+27 -L2AB-RPC-RT
19+07 to 19+40 -L2AB-RPD-LT
77+12 to 81+95 -Y2-RT
81+49 -Y2-
16+50 to 23+45 -Y3-
21+00 to 24+46 -Y4-
22+70 to 25+73 -Y3
27+00 to 29+00 -Y3-LT
Total from Sheet 1
Total from Sheet 2
Structure
Size / Type
RCBC - SK
Roadway Fill - WU
Roadway Fill - WX
Roadway Fill - SU
Roadway Fill - WAC
Roadway Fill - WAE
RCBC - SR
Roadway Fill - WAN
Roadway Fill - WAP
Roadway Fill - WAO
Roadway Fill - PI
ENTER DATA ON THIS TAB AND PRINT FROM THE PRINT PAGE TAB
WETLAND IMPACTS
Permanent
Fill In
Wetlands
(ac)
0.306
1.6206
0.028
0.0738
0.7154
0.4167
0.1883
4.054
3.3488
7.4028
Temp.
Fill In
Wetlands
(ac)
0
Excavation
in
Wetlands
(ac)
0
Mechanized
Clearing
in Wetlands
(ac)
0
Hand
Clearing
in
Wetlands
(ac)
0
SURFACE WATER IMPACTS
Permanent
SW
impacts
(ac)
0.071
0.0322
0.0645
0.3891
0.975
0.5568
1.5318
Temp.
SW
impacts
(ac)
0
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
May 2023
Chatham County
Project Blue - Phase 2B
HE-0006
SHEET
Existing
Channel
Impacts
Permanent
(ft)
363.8
465
119
1185
947.8
2132.8
27
Existing
Channel
Impacts
Temp.
(ft)
0
OF
Natural
Stream
Design
(ft)
0
27
Revised 2018 Feb
WETLAND AND SURACE WATER IMPACTS SUMMARY
Site
No.
14
15
16
17
18
19
20
21
TOTALS*:
*Rounded totals are sum of actual impacts
NOTES:
Station
(From/To)
18+00 -L2AB-RPC-
18+00 to 22+42 -L2AB-RPB-LT
18+00 to 22+42 -L2AB-RPC-RT
18+75 to 23+27 -L2AB-RPC-RT
19+07 to 19+40 -L2AB-RPD-LT
77+12 to 81+95 -Y2-RT
81+49 -Y2-
16+50 to 23+45 -Y3-
21+00 to 24+46 -Y4-
22+70 to 25+73 -Y3
27+00 to 29+00 -Y3-LT
Total from Sheet 1
Total from Sheet 2
Structure
Size / Type
RCBC - SK
Roadway Fill - WU
Roadway Fill - WX
Roadway Fill - SU
Roadway Fill - WAC
Roadway Fill - WAE
RCBC - SR
Roadway Fill - WAN
Roadway Fill - WAP
Roadway Fill - WAO
Roadway Fill - PI
THIS SHEET IS AUTOMATICALLY POPULATED FROM THE DATA ENTRY PAGE TAB
WORKSHEET PASSWORD = NCDOT
WETLAND IMPACTS
Permanent
Fill In
Wetlands
(ac)
0.31
1.62
0.03
0.07
0.72
0.42
0.19
4.05
3.35
7.4
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
SURFACE WATER IMPACTS
Permanent
SW
impacts
(ac)
0.07
0.03
0.06
0.39
0.98
0.56
1.54
Temp.
SW
impacts
(ac)
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
May 2023
Chatham County
Project Blue - Phase 2B
HE-0006
SHEET
Existing
Channel
Impacts
Permanent
(ft)
363.8
465
119
1185
947.8
2132.8
27
Existing
Channel
Impacts
Temp.
(ft)
0
OF
Natural
Stream
Design
(ft)
0
27
JMD Revised 2/03/05
WETLAND PERMIT IMPACT SUMMARY
Site
No.
TOTALS:
Station
(From/To)
Structure
Size / Type
WETLAND IMPACTS
Permanent
Fill In
Wetlands
(ha)
Temp.
Fill In
Wetlands
(ha)
Excavation
in
Wetlands
(ha)
Mechanized
Clearing
in Wetlands
(ha)
Hand
Clearing
in
Wetlands
(ha)
SURFACE WATER IMPACTS
Permanent
SW
impacts
(ha)
Temp.
SW
impacts
(ha)
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
COUNTY
WBS - XXXXX.1.1 (R-XXXX)
SHEET
Existing
Channel
Impacts
Permanent
(m)
Natural
Stream
Design
(m)
11/30/2023
JMD Revised 2/03/05
WETLAND PERMIT IMPACT SUMMARY
Site
No.
TOTALS:
Station
(From/To)
Structure
Size / Type
WETLAND IMPACTS
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
SURFACE WATER IMPACTS
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
COUNTY
WBS - XXXXX.1.1 (R-XXXX)
SHEET
Existing
Channel
Impacts
Permanent
(ft)
Natural
Stream
Design
(ft)
11/30/2023