WETLAND AND SURACE WATER IMPACTS SUMMARY
Site
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
TOTALS*:
*Rounded totals are sum of actual impacts
NOTES:
Station
(From/To)
60+21 to 74+19 -L2AB-
91+43 to 92+51 -L2AB-
102+20 -L2AB-
102+20 -L2AB-
11+54 to 12+67 -SR1-
12+95 to 14+81 -SR1-
112+54 -L2AB-
112+54 -L2AB-
10+00 to 11+19 -L2NB-RT
20+00 to 23+54 -SR1-
24+90 to 26+00 -SR1-
11+53 -L2AB-SPB-LT
129+12 to 130+98 -L2AB-
133+70 to 134+56 -L2AB-
20+35 to 20+72 -L2AB-RPA-RT
17+39 to 19+43 -Y2-LT
Structure
Size / Type
Roadway Fill - WBJ
Roadway Fill - WCH
Roadway Fill - WCD
Roadway Fill - WCE
Roadway Fill - WCF
Roadway Fill - WCG
Roadway Fill - WBK
Bridge - SR
Roadway Fill - PG
XX RCP-IV - SO
Roadway Fill - PF
Roadway Fill - PE
Roadway Fill - WAI
RCBC - SL/SM
Roadway Fill - SN
Roadway Fill - WAA
Roadway Fill - WZ
Roadway Fill - WAB
RCP/Roadway Fill - WT
Roadway Fill - WAG
RCP/Roadway Fill - WS
Roadway Fill - WAH
Roadway Fill - WAF
Roadway Fill - WV
ENTER DATA ON THIS TAB AND PRINT FROM THE PRINT PAGE TAB
WETLAND IMPACTS
Permanent
Fill In
Wetlands
(ac)
0.134
0.0513
0.0033
0.0332
0.0002
0.0043
2.0024
0.1919
0.1201
0.5477
0.019
0.0155
0.6794
0.1079
0.0327
0.0185
0.0929
4.0543
Temp.
Fill In
Wetlands
(ac)
0
Excavation
in
Wetlands
(ac)
0
Mechanized
Clearing
in Wetlands
(ac)
0
Hand
Clearing
in
Wetlands
(ac)
0
SURFACE WATER IMPACTS
Permanent
SW
impacts
(ac)
0.2281
0.0055
0.4188
0.2491
0.0646
0.0084
0.9745
Temp.
SW
impacts
(ac)
0
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
May 2023
Chatham County
Project Blue - Phase 2B
HE-0006
SHEET
Existing
Channel
Impacts
Permanent
(ft)
121
942
122
1185
26
Existing
Channel
Impacts
Temp.
(ft)
0
OF
Natural
Stream
Design
(ft)
0
27
Revised 2018 Feb
WETLAND AND SURACE WATER IMPACTS SUMMARY
Site
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
TOTALS*:
*Rounded totals are sum of actual impacts
NOTES:
Station
(From/To)
60+21 to 74+19 -L2AB-
91+43 to 92+51 -L2AB-
102+20 -L2AB-
102+20 -L2AB-
11+54 to 12+67 -SR1-
12+95 to 14+81 -SR1-
112+54 -L2AB-
112+54 -L2AB-
10+00 to 11+19 -L2NB-RT
20+00 to 23+54 -SR1-
24+90 to 26+00 -SR1-
11+53 -L2AB-SPB-LT
129+12 to 130+98 -L2AB-
133+70 to 134+56 -L2AB-
20+35 to 20+72 -L2AB-RPA-RT
17+39 to 19+43 -Y2-LT
Structure
Size / Type
Roadway Fill - WBJ
Roadway Fill - WCH
Roadway Fill - WCD
Roadway Fill - WCE
Roadway Fill - WCF
Roadway Fill - WCG
Roadway Fill - WBK
Bridge - SR
Roadway Fill - PG
XX RCP-IV - SO
Roadway Fill - PF
Roadway Fill - PE
Roadway Fill - WAI
RCBC - SL/SM
Roadway Fill - SN
Roadway Fill - WAA
Roadway Fill - WZ
Roadway Fill - WAB
RCP/Roadway Fill - WT
Roadway Fill - WAG
RCP/Roadway Fill - WS
Roadway Fill - WAH
Roadway Fill - WAF
Roadway Fill - WV
THIS SHEET IS AUTOMATICALLY POPULATED FROM THE DATA ENTRY PAGE TAB
WORKSHEET PASSWORD = NCDOT
WETLAND IMPACTS
Permanent
Fill In
Wetlands
(ac)
0.13
0.05
< 0.01
0.03
< 0.01
< 0.01
2
0.19
0.12
0.55
0.02
0.02
0.68
0.11
0.03
0.02
0.09
4.05
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
SURFACE WATER IMPACTS
Permanent
SW
impacts
(ac)
0.23
< 0.01
0.42
0.25
0.06
< 0.01
0.97
Temp.
SW
impacts
(ac)
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
May 2023
Chatham County
Project Blue - Phase 2B
HE-0006
SHEET
Existing
Channel
Impacts
Permanent
(ft)
121
942
122
1185
26
Existing
Channel
Impacts
Temp.
(ft)
0
OF
Natural
Stream
Design
(ft)
0
27
JMD Revised 2/03/05
WETLAND PERMIT IMPACT SUMMARY
Site
No.
TOTALS:
Station
(From/To)
Structure
Size / Type
WETLAND IMPACTS
Permanent
Fill In
Wetlands
(ha)
Temp.
Fill In
Wetlands
(ha)
Excavation
in
Wetlands
(ha)
Mechanized
Clearing
in Wetlands
(ha)
Hand
Clearing
in
Wetlands
(ha)
SURFACE WATER IMPACTS
Permanent
SW
impacts
(ha)
Temp.
SW
impacts
(ha)
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
COUNTY
WBS - XXXXX.1.1 (R-XXXX)
SHEET
Existing
Channel
Impacts
Permanent
(m)
Natural
Stream
Design
(m)
11/30/2023
JMD Revised 2/03/05
WETLAND PERMIT IMPACT SUMMARY
Site
No.
TOTALS:
Station
(From/To)
Structure
Size / Type
WETLAND IMPACTS
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
SURFACE WATER IMPACTS
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
COUNTY
WBS - XXXXX.1.1 (R-XXXX)
SHEET
Existing
Channel
Impacts
Permanent
(ft)
Natural
Stream
Design
(ft)
11/30/2023