Loading...
HomeMy WebLinkAbout20221576 Ver 1_Request to correct 401_20231122 (10)Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 1 2 3 4 5 6 TOTALS*: *Rounded totals are sum of actual impacts NOTES: Station (From/To) 16+00 to 25+00 -L2AB- 15+00 -Y1RPB-RT 18+00 to 18+90 -Y1RPB-RT 44+80 -L2AB- 44+80 to 46+00 -L2AB-LT 90+50 -Y1-RT 63+00 to 75+50 -Y1- 108+75 -Y1-RT Structure Size / Type Roadway Fill - WBR Roadway Fill - WBV Bridge - ST Roadway Fill - WBE Roadway Fill - PM Roadway Fill - WBF Roadway Fill - PO Roadway Fill - WBS Roadway Fill - WAZ Bridge - SR Roadway Fill - WBU ENTER DATA ON THIS TAB AND PRINT FROM THE PRINT PAGE TAB WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.1196 2.377 0.0784 0.2055 0.0585 2.1863 0.0117 5.037 Temp. Fill In Wetlands (ac) 0 Excavation in Wetlands (ac) 0.0037 0.0037 Mechanized Clearing in Wetlands (ac) 0 Hand Clearing in Wetlands (ac) 0 SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.0452 0.235 0.2802 Temp. SW impacts (ac) 0 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS May 2023 Chatham County Project Blue - Phase 2A HE-0006 SHEET Existing Channel Impacts Permanent (ft) 0 12 Existing Channel Impacts Temp. (ft) 0 OF Natural Stream Design (ft) 0 12 Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. 1 2 3 4 5 6 TOTALS*: *Rounded totals are sum of actual impacts NOTES: Station (From/To) 16+00 to 25+00 -L2AB- 15+00 -Y1RPB-RT 18+00 to 18+90 -Y1RPB-RT 44+80 -L2AB- 44+80 to 46+00 -L2AB-LT 90+50 -Y1-RT 63+00 to 75+50 -Y1- 108+75 -Y1-RT Structure Size / Type Roadway Fill - WBR Roadway Fill - WBV Bridge - ST Roadway Fill - WBE Roadway Fill - PM Roadway Fill - WBF Roadway Fill - PO Roadway Fill - WBS Roadway Fill - WAZ Bridge - SR Roadway Fill - WBU THIS SHEET IS AUTOMATICALLY POPULATED FROM THE DATA ENTRY PAGE TAB WORKSHEET PASSWORD = NCDOT WETLAND IMPACTS Permanent Fill In Wetlands (ac) 0.12 2.38 0.08 0.21 0.06 2.19 0.01 5.04 Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) < 0.01 < 0.01 Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) 0.05 0.24 0.28 Temp. SW impacts (ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS May 2023 Chatham County Project Blue - Phase 2A HE-0006 SHEET Existing Channel Impacts Permanent (ft) 0 12 Existing Channel Impacts Temp. (ft) 0 OF Natural Stream Design (ft) 0 12 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ha) Temp. Fill In Wetlands (ha) Excavation in Wetlands (ha) Mechanized Clearing in Wetlands (ha) Hand Clearing in Wetlands (ha) SURFACE WATER IMPACTS Permanent SW impacts (ha) Temp. SW impacts (ha) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (m) Natural Stream Design (m) 11/30/2023 JMD Revised 2/03/05 WETLAND PERMIT IMPACT SUMMARY Site No. TOTALS: Station (From/To) Structure Size / Type WETLAND IMPACTS Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) SURFACE WATER IMPACTS Permanent SW impacts (ac) Temp. SW impacts (ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY WBS - XXXXX.1.1 (R-XXXX) SHEET Existing Channel Impacts Permanent (ft) Natural Stream Design (ft) 11/30/2023