Loading...
HomeMy WebLinkAbout20221576 Ver 1_Request to correct 401_20231122 (2)NCDOT Transportation Improvements STIP Project HE-0006 5/18/2023 Phase 1B Streams Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Total Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Total Phase 1C Streams Site 1 Site 2 Site 3 Site 4 Site 5 Total Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Total Phase 1D Wetlands Site 1 Site 2 Site 3 Site 4 Total Phase 1E Wetlands Site 1 Site 2 Total Phase 2A Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Total Phase 2B Streams Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 Site 17 Site 18 Site 19 Site 20 Site 21 Total Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 Site 17 Site 18 Site 19 Site 20 Site 21 Total Notes: Excavation and mechanical clearing are added to the other permanent wetland impacts. Additional decimal places are shown to address rounding Error in the calculation totaling impacts on the permit drawing table has been corrected for Phase 2B Permanent - - - 272 297 82 53 - - - 11 89 66 870 0.2 1.86 0.02 0.11 0.64 0.03 0.11 - - - 0.05 3.02 - - - 275 25 - - - - - - 300 1.08 - - - - - - 0.01 - - - 1.08 0.29 0.36 0.03 0.03 0.71 0 0.01 0.01 2.497 0.078 0.21 0.059 2.186 0.012 5.042 - - - - - - 121 - - - - - - 1064 - - - - - - - - - - - - - - - - - - - - - 829 - - - - - - 119 - - - - - - - - - - - - 2133 2.227 - - - - - - - - - 0.192 - - - 0.12 0.548 0.019 0.695 0.141 0.019 0.093 1.927 0.028 0.074 - - - 0.715 0.417 0.188 - - - 7.403 Temporary - - - 24 56 24 - - - 121 10 95 330 0.02 0.06 0.01 0.02 0.04 0.01 0.01 - - - - - - 0.17 - - - 52 10 - - - - - - 62 - - - - - - - - - - - - - - - 0 0 0 0 0 0 0 0 0 - - - - - - - - - - - - - - - - - - 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 NCDOT Transportation Improvements STIP Project HE-0006 8/4/2023 Phase 1B Streams Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Total Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Total Phase 1C Streams Site 1 Site 2 Site 3 Site 4 Site 5 Total Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Total Phase 1D Wetlands Site 1 Site 2 Site 3 Site 4 Total Permanent - - - 272 297 82 - - - - - - 31 89 63 834 0.214 1.884 0.014 0.105 0.64 0.019 0.11 - - - 0.05 3.036 - - - 275 - - - - - - - - - 275 1.08 - - - - - - 0.004 - - - 1.084 0.076 0.361 0.027 0.03 0.494 Temporary - - - 112 0 56 - - - - - - 151 25 36 380 0.02 0.1 - - - 0.02 0.04 0.001 0.004 - - - - - - 0.185 - - - 71 - - - - - - - - - 71 - - - - - - - - - - - - - - - 0 - - - - - - - - - - - - 0 DEQ 8/30/2023 Phase 1B Streams Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Total Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Total Phase 1C Streams Site 1 Site 2 Site 3 Site 4 Site 5 Total Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Total Phase 1D Wetlands Site 1 Site 2 Site 3 Site 4 Total Phase 1E Wetlands Site 1 Site 2 Total Phase 2A Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Total Phase 2B Streams Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 Site 17 Site 18 Site 19 Site 20 Site 21 Total Wetlands Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 Site 17 Site 18 Site 19 Site 20 Site 21 Total Permanent - - - 272 297 82 - - - - - - 31 89 63 834 0.19 1.65 0.01 0.06 0.56 0.01 0.04 - - - 0.02 2.54 - - - 275 25 - - - - - - 300 0.96 - - - - - - - - - - - - 0.96 0.08 0.36 0.03 0.03 0.5 - - - 0.01 0.01 2.5 0.08 0.21 0.06 2.19 0.01 5.05 - - - - - - 121 - - - - - - 1064 - - - - - - - - - - - - - - - - - - - - - 829 - - - - - - 119 - - - - - - - - - - - - 2133 2.24 0.19 - - - - - - - - - - - - 0.12 0.55 0.02 0.7 0.14 0.02 0.09 1.93 0.03 0.07 - - - 0.72 0.42 0.19 - - - 7.43 Temporary - - - 112 - - - 56 - - - - - - 151 25 36 380 0.04 0.33 0.01 0.06 0.12 0.01 0.08 - - - 0.03 0.68 - - - 71 10 - - - - - - 81 0.12 - - - - - - 0.01 - - - 0.13 - - - - - - - - - - - - 0 - - - - - - 0 - - - - - - 0.01 - - - - - - - - - 0.01 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 USACE 11/20/2023 Phase 1B Streams Total Wetlands Total Phase 1C Streams Total Wetlands Total Phase 1D Wetlands Total Phase 1E Wetlands Total Phase 2A Wetlands Total Phase 2B Streams Total Wetlands Total Permanent 834 3.04 275 1.08 0.49 0.01 5.05 3081 10.75 Temporary 381 0.19 71 - - - 0 0 0 0 0 0 Open Waters Permanent 0.82 0.001 0.74 1.23 0.045 0.235 0.23 0.42 0.25 0.39 NCDOT Transportation Improvements STIP Project HE-0006 8/4/2023 - TOTALS BY PHASES Phase 1 Streams Phase 1 Wetlands Phase 2 Streams Phase 2 Wetlands Cells N75+N76+N77+N78 = 1.29 Permanent 1109 4.624 2133 12.445 Temporary 451 0.185 - - - - - - Credits noted in the 401 Water Quality Certification VinFast NCDOT Sanford Wetlands 0.033 2.54 0.96 0.5 0.01 5.05 7.43 16.49 0.66 0.66 Streams 677 722 300 2133 3155 229 66 295 TOTAL Phase 1B Phase 1C Phase 1D Phase 1E Phase 2A Phase 2B TOTAL Phase 1 Phase 2 TOTAL Subtotal 1B+1C 3.5 Subtotal all of Phase 1 4.01 Subtotal all of Phase 2 12.48 - DETAILED TABLE 1022 1022 2133 ? ? ? Credits noted in the 401 Water Quality Certification VinFast NCDOT Sanford Wetlands 0.02 0.013 6.52 15.86 0.46 Streams 364 313 1634 1589 229 66 Phase 1 Phase 3 Phase 1 Phase 2 Phase 1 Phase 2 - SUMMARY TABLE and the COMPENSATORY MITIGATION RESPONSIBILITY TRANSFER FORMS Credit Summary from the Proferred Permit Cover Letter compared to the the 401 Certification Page 9 (pdf #16) - Special Condition 28 continued: Project Blue (VinFast facility) HE-0006 Utilities Phase 1B Phase 2 Phase 3 Phases 1B and 1C Phases 1D, 1E, 2A, and 2B Phases 1 and 2 Wetland Credits 0.04 None 0.026 8.24 Later 8.09 Stream Credits 728 None 626 2218 Later 670 Credits noted in the 401 Water Quality Certification VinFast NCDOT Sanford Wetlands 0.02 0.013 6.52 15.86 0.46 Streams 364 313 1634 1589 229 66 Phase 1 Phase 3 Phase 1 Phase 2 Phase 1 Phase 2 - SUMMARY TABLE