Loading...
HomeMy WebLinkAbout20221576 Ver 1_Request to correct 401_20231122 (6)Baker, Caroline D From: Kristina Miller <kmiller@rkk.com> Sent: Wednesday, November 22, 2023 2:46 PM To: Homewood, Sue; Mellor, Colin; Bailey, David E CIV USARMY CESAW (USA) Cc: Hartshorn, Jason; Teague, Jeff L; Scott Blevins; Chris Rivenbark; John Olinger; Matthew Cook Subject: RE: [External] AMENDED Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014-00610 Attachments: impact comparison.xlsx; PRELIMINARY -Phase 1 E_WetlandandSurfaceWaterlmpactsSummary_Update.xlsx; PRELIMINARY_ Phase 2A_WetlandandSurfaceWaterlmpactsSummary_Update.xlsx; PRELIMINARY -Phase 2B_WetlandandSurfaceWaterlmpactsSummary_page1_Update.xlsx; PRELIMINARY -Phase 2B_WetlandandSurfaceWaterlmpactsSummary_page2 _Update.xlsx; Phase 1 B_WetlandandSurfaceWaterlmpactsSummary_Update.xlsx; Phase 1C_WetlandandSurfaceWaterlmpactsSummary_Update.xlsx; PRELIMINARY -Phase 1 D_WetlandandSurfaceWaterlmpactsSummary_Update.xlsx Importance: High Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon. Attached is the updated comparison table (please refer to the green shaded cells in columns B, C, E, F, and N to Q) along with the permit drawing tables/spreadsheets which include a "data entry page" tab (showing details to the thousandths) and the "print page" tab. Thank you again for all your time working on this project! Sincerely, Kristina KRISTINA MILLER, PE Senior Project Delivery Leader Ilia, 8601 Six Forks Road Forum 1, Suite 700 Raleigh, NC 27615 919.878.9560 P 1919.653.7384 D 1919.225.8298 C www.rkk.com Responsive People I Creative Solutions From: Kristina Miller Sent: Wednesday, November 22, 2023 8:56 AM To: Homewood, Sue <sue.homewood@deq.nc.gov>; Mellor, Colin <cmellor@ncdot.gov>; Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Cc: Hartshorn, Jason <jason.hartshorn@kimley-horn.com>; Teague, Jeff L <jlteague@ncdot.gov>; Scott Blevins <sblevins@rkk.com>; Chris Rivenbark <crivenbark@rkk.com>; John Olinger <jolinger@rkk.com>; Matthew Cook <mcook@rkk.com> Subject: RE: [External] AMENDED Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014- 00610 Importance: High Good morning. Thank you for meeting with us at 11:30am today. We would like to discuss the attached comparison table to explain the differences in impact summaries. Sincerely, Kristina KRISTINA MILLER, PE Senior Project Delivery Leader 8601 Six Forks Road Forum 1, Suite 700 Raleigh, NC 27615 919.878.9560 P 1919.653.7384 D 1919.225.8298 C www rkk rom Responsive People I Creative Solutions From: Kristina Miller Sent: Tuesday, November 21, 2023 12:54 PM To: Homewood, Sue <sue.homewood@deg.nc.gov>; Mellor, Colin <cmellor@ncdot.gov>; Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Cc: Hartshorn, Jason <jason.hartshorn@kimley-horn.com>; Teague, Jeff L <jlteague@ncdot.gov>; Scott Blevins <sblevins@rkk.com>; Chris Rivenbark <crivenbark@rkk.com> Subject: RE: [External] AMENDED Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014- 00610 Good afternoon! I'll have a table/spreadsheet ready for our 11:30am meeting tomorrow that compares the HE-0006 impact values from the 5/18/23 submittal, 8/4/23 submittal, DWR table, and USACE table. Sincerely, Kristina KRISTINA MILLER, PE Senior Project Delivery Leader 8601 Six Forks Road Forum 1, Suite 700 Raleigh, NC 27615 919.878.9560 P 1919.653.7384 D 1919.225.8298 C www.rkk.com Responsive People I Creative Solutions From: Homewood, Sue <sue.homewood@deg.nc.gov> Sent: Tuesday, November 21, 2023 11:07 AM To: Mellor, Colin <cmellor@ncdot.gov>; Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Kristina Miller <kmiller@rkk.com> Cc: Hartshorn, Jason <jason.hartshorn@kimley-horn.com>; Teague, Jeff L <jlteague@ncdot.gov> Subject: RE: [External] AMENDED Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014- 00610 EXTERNAL EMAIL: Do not click links or open attachments unless you trust the 'Sender' and know the content is safe. MR I tried to review both the 401 and the USACE impact tables and I'm still unclear as to why we have different numbers. That is going to be essential to figuring out a resolution. As I said in my first response last week, I sent my impact tables to the applicants and asked that they review that I had everything accurate and was told that they were. If changes occurred to the design as it progressed since then and David just had more updated numbers then that would cause our tables to be inconsistent. I'm going to need someone from the team to figure out why David and I have different numbers and explain that tomorrow at the meeting. I suggest we focus on impact numbers, if we get those straight then the mitigation numbers should fall into place. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Mellor, Colin <cmellor@ncdot.gov> Sent: Monday, November 20, 2023 9:05 AM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@deg.nc.gov>; Kristina Miller <kmiller@rkk.com> Cc: Hartshorn, Jason <jason.hartshorn@kimley-horn.com>; Teague, Jeff L <jlteague@ncdot.gov> Subject: RE: [External] AMENDED Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014- 00610 Dave and Sue, Needless to say, we'd like to get this sorted ASAP. While I'm sure getting the FTO sent again this week is impossible, is there a time this afternoon, tomorrow, or Wednesday that we could Teams meet and work out the numbers and how the FTO gets corrected. @Kristina Miller could you please help coordinate this meeting if its possible this week? If not, first thing next week. Thanks Colin Colin Mellor Senior Project Manager Project Management Unit North Carolina Department of Transportation 919-707-6139 office 919-559-0481 mobile cmellor ncdot.gov 1000 Birch Ridge Drive Raleigh, NC, 27610 1582 Mail Service Center Raleigh, NC 27699-1582 rie STAT'p o,. 8 -1 p t Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Sent: Friday, November 17, 2023 4:50 PM To: Mellor, Colin <cmellor@ncdot.gov> Subject: RE: [External] AMENDED Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014- 00610 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Colin, and my apologies for the delay. I spoke to Monte about this issue and more specifically our discussion yesterday. He advises against signing the 15Y time out/permit until the number are rectified. The main reason is that our Reg Chief and/or District commander may not feel comfortable counter -signing if we know about a discrepancy. I floated the idea of the 401 being more forgiving in terms of impact allowances than the 404, but the overall idea of a known discrepancy indicates that this should get figured out first. I'm around (though my schedule is very full) on Monday and Tuesday of next week if you'd like to discuss prior to hearing from Sue. -Dave Bailey David E. Bailey, PWS Chief, Raleigh Regulatory Field Office US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Mellor, Colin <cmellor@ncdot.gov> Sent: Monday, November 13, 2023 4:17 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue. homewood @deg. nc.gov> Cc: Kristina Miller <kmiller@rkk.com>; Teague, Jeff L <jlteague@ncdot.gov> Subject: [Non-DoD Source] RE: [External] AMENDED Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014-00610 Dave and Sue, There's a discrepancy in impact and mitigation numbers between the 401 detailed impact numbers (pdf page 58 and 59), and the 401 summary table mitigation numbers (pdf page 64) and subsequent 401 mitigation responsibility transfer form (pdf page 81). The 404 mitigation responsibility transfer forms (pdf pages 29 and 31) have a different set of impact numbers. The detailed 401 impact numbers and the 404 impact numbers are +/- the same. The 401 summary table and transfer forms are significantly higher. What's the best way to address this? Colin Colin Mellor Senior Project Manager Project Management Unit North Carolina Department of Transportation 919-707-6139 office 919-559-0481 mobile cmellor ncdot.gov 1000 Birch Ridge Drive Raleigh, NC, 27610 1582 Mail Service Center Raleigh, NC 27699-1582 St�Yt . A 1 I Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Sent: Thursday, November 9, 2023 1:37 PM To: anh.nguyen@vinfastauto.com; Teague, Jeff L <jlteague@ncdot.gov> Cc: Hartshorn, Jason <jason.hartshorn@kimley-horn.com>; Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue.homewood@deg.nc.gov>; Fennel, Tommy E CIV USARMY CESAW (USA)<Tommy.E.Fennel@usace.army.mil>; Mellor, Colin <cmellor@ncdot.gov>; Jason Steele <Jason.Steele@freese.com> Subject: [External] AMENDED Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014-00610 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Ms. Nguyen and Mr. Teague, Please reference the initial proffered permit (i.e. first time out letter and attachments) for this project submitted to you yesterday. Subsequently, NCDOT requested to amend their compensatory mitigation requirement to procure stream credits from a private mitigation bank rather than NCDMS. This requested change has been determined to be consistent with the Corps Mitigation Rule pursuant to 33 CFR part 332. The amended initial proffered permit reflecting this change is attached to this email. As described in my email yesterday, due to the file size of the permitted project plans, I have provided a DoD SAFE link email containing the permitted plansheets for the Project Blue, HE-0006, and utilities project components as well as the HDD contingency plan (referenced in Permit Special Conditions 1, 19, and 20); the above - referenced amendment does not alter these documents, and they are still part of this initial proffered permit. Note that hard copies of these documents will not be distributed unless specifically requested. Please read over all of these documents carefully, and, if all appears acceptable, sign and date above the respective "(Permittee)" lines on p. 6 of the pdf package, and send back (via email is preferred; reply all) as directed. Also note the required payment (per 33 CFR part 325.1(f)) and associated instructions on pages 1 and 2 of the pdf package. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Chief, Raleigh Regulatory Field Office US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Bailey, David E CIV USARMY CESAW (USA) Sent: Wednesday, November 8, 2023 3:01 PM To: anh.nguyen@vinfastauto.com; Teague, Jeff L <jlteague@ncdot.gov> Cc: Hartshorn, Jason <jason.hartshorn@kimley-horn.com>; Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue.homewood@deg.nc.gov>; Fennel, Tommy E CIV USARMY CESAW (USA)<Tommy.E.Fennel @usace.army.mil>; cmellor@ncdot.gov; Jason Steele <Jason.Steele@freese.com> Subject: Initial Proffered Permit: Vinfast EV manufacturing complex (Project Blue) and associated infrastructure (NCDOT STIP No. HE-0006 and utility improvements), Chatham and Lee Counties; SAW-2014-00610 Ms. Nguyen and Mr. Teague, The initial proffered permit (i.e. first time out letter and attachments) for this project is attached to this email. Due to the file size of the permitted project plans, I will follow-up momentarily with a DoD SAFE link via email containing the permitted plansheets for the Project Blue, HE-0006, and utilities project components as well as the HDD contingency plan (referenced in Permit Special Conditions 1, 19, and 20) that are part of this initial proffered permit. Note that hard copies of these documents will not be distributed unless specifically requested. Please read over all of these documents carefully, and, if all appears acceptable, sign and date above the respective "(Permittee)" lines on p. 6 of the pdf package, and send back (via email is preferred; reply all) as directed. Also note the required payment (per 33 CFR part 325.1(f)) and associated instructions on pages 1 and 2 of the pdf package. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Chief, Raleigh Regulatory Field Office US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. "RK&K" and "RK&K Engineers" are registered trade names of Rummel, Klepper & Kahl, LLP, a Maryland limited liability partnership. This message contains confidential information intended only for the person or persons named above. If you have received this message in error, please immediately notify the sender by return email and delete the message. Thank you. Rummel, Klepper and Kahl, LLP ensures nondiscrimination in all programs and activities in accordance with Title VI of the Civil Rights Act of 1964. RK&K does not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors. We also note that RK&K will ensure minorities will be afforded full opportunity to submit proposals and not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Rummel, Klepper and Kahl, LLP is an equal opportunity employer that values diversity at all levels. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact our Human Resources office at (410) 728-2900 for further assistance.