Loading...
HomeMy WebLinkAboutSWA000075_Supplement-EZ Form_20231130 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Pinnacle Cranes _ 2 Project Area(ac) 10 3 Coastal Wetland Area(ac) _ 0 4 Surface Water Area(ac) _ 0 , 5 Is this project High or Low Density? _ High 6 1Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 I Width of vegetated setbacks provided(feet) _- 40' __ 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 - 12 Bioretention Cell 0 _ 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 _ 16 Sand Filter 1 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 1 22 Dry Pond _ 0 23 StormFilter _ 0 _ 24 Silva Cell _ 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Brian Rossi,PE/Project Manager 28 Organization: _ EMH&T 29 Street address: 5500 New Albany Road 30 City,State.Zip: Columbus,Ohio 43054 31 Phone number(s): (704)353-9948 32 Email: brossi@emht.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer cr11 • Signature of Designer 045526 i• . f1,iS> R. kkv., �\ C�2/z4 262.3 ����ll Jf 11111Ul�SeaJ Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM - Sand Filter Treatment Swale 5 Total drainage area(sq ft) 451586.52 317029.68 134556.84 6 Onsite drainage area(sq ft) 360197.64 317029.68 43167.96 7 Offsite drainage area(sq ft) 91388.88 0 91388.88 8 Total BUA in project(sq ft) 328094 sf 242542 sf 85552 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 0 sf sf New BUA not on subdivided lots(subject to 10 permitting)_(sf) 0 sf sf 11 Offsite BUA(sq ft) 77667.48 sf 77667 sf 12 Breakdown of new BUA not on subdivided lots: 0 -Parking(sq ft) 224913.565 224914 sf sf -Sidewalk(sq ft) 0 sf sf -Roof(sq ft) 17628.515 17629 sf sf -Roadway(sq ft) 7884.36 sf _ 7884 sf -Future(sq ft) 0 __sf sf -Other,please specify in the comment box below(sq ft) 0 sf sf New infiltrating permeable pavement on 13 subdivided lots(sq ft) _ 0 sf sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) - 0 sf sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) 0 sf sf 16 Existing BUA that is already permitted(sq if) —_ 0 sf sf _ 17 Existing BUA that will be removed(sq ft) 0 sf sf 18 Percent BUA 73% 77% 64% 19 Design storm(inches) - 1 inch .8 in 20 Design volume of SCM(cu ft) - 19512 cf N/A 21 Calculation method for design volume - Rational Method Rational Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 'drainage area(s): 19-20 for Area 2:The drive entrances cannot physically drain to the Sand Filter onsite,so the drives and site frontage will drain to a treatment swale. This swale receives water from a portion of an existing industrial site.The treatment swale was designed for the 0.75-inch WQ event SAND FILTER 1lDrainage area number 1 21Minlmum required treatment volume(cu ft� - 19512 cf GENERAL MDC FROM 02H.1050 _ _ _ 3l Is the SCM sized to treat the SW from all surfaces at build-out? Yco 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 2:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? Are the inlets,outlets,and receiving stream protected from erosion 7 Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with I No General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17!Was the SCM designed by an NC licensed professional? Yes SAND FILTER MDC FROM 02H.1056 18 SHWT elevation(fmsl) -500.5 _ 19 Type of sand filter(open or closed) Open 20 If closed,will the filter will be pre-cast or pour-in-place? 21 If closed,top of grate elevation(fmsl) 22 Is this sand filter designed to attenuate peak flows? Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber(cubic feet) 8847 cf 24 Will there be a permanent pool in the sediment chamber? No 25 Bottom of the sediment chamber(fmsl) 510.00 - 26 Area of the sediment chamber(square feet) 6311 sf 27 Physical depth of the sediment chamber(inches) 24 in 28 Ponding depth in the sediment chamber,above any permanent pool 24 in (inches) 29 Elevation of top of weir between chambers(fmsl) 512 Sand Chamber 30':Volume that can be retained in the sand chamber(cubic feet) - 80417 cf 311Bottom of the sand chamber(fmsl) 509.00 32IArea of the sand chamber(square feet) 3120 sf 331 Physical depth of the sand chamber(inches) 24 in 34 Ponding depth in the sand chamber,above the sand surface 60 in (inches) 35 Elevation of the bypass device(fmsl) 510.76 36 Type of bypass device Window 37 Mechanism for distributing flow over the sand surface Forebay Berm 38 Sand specification for sand chamber ASTM C33 39 Depth above underdrain pipe(inches) 9 in 40 Will the media be maintained to drain at least two inches per hour at Yes the sand surface? 41 Is at least one clean-out pipe provided at the low point of each Yes underdrain line? 42 I W ill clean-out pipes be capped? Yes ADDITIONAL INFORMATION 43 Please use this space to provide any additional information about the sand filter(s): _ 18.Boring at sand filter did not find water at 10.5 feet down from existing grade(-511.00 feet) 39.Note the underdrain outlet comes out of the sand filter at 9 inches of depth,however the rest of the underdrain is-3 feet below the sand filter surface. Sand Filter 3 11:02 AM 1/12/2023 TREATMENT SWALE 1 Drainage area number 2 2 Design flow rate of SCM(cfs) 1.12 cfs GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? _ 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes _ 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with No General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? _ Yes 17 Was the SCM designed by an NC licensed professional? Yes TREATMENT SWALE MDC FROM 02H.1061 18 SHWT elevation(fmsl) [ —500.5 19 Bottom of the treatment swale(fmsl) 507.36 20 Depth of treatment swale(feet) _ 5 cf 21 Is the swale trapezoidal in shape? Yes 22 Width of bottom of swale(feet) r 5 ft 23 Side slopes of treatment swale(H:V) 3:1 24 Length of swale(feet) 310 ft 25 Flow depth during the 0.75 inch/hour storm(inches) 2 in 26 Flow velocity during the 0.75 inch/hour storm(feet per second) 2 cfs 27 Hydraulic retention time for swale(minutes) 18 min 28 Species of grass that will be used Bermuda or Fescue 29 Will the grass be maintained at an average height of 6 inches? Yes 30 Will the grass not be cut lower than 4 inches? Yes 31 Velocity during the 10-year storm(feet per second) 4 ft/s 32 Is the swale designed to non-erosively pass the 10-year storm? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about the 33 treatment swale(s): TrSwale 4 11:02 AM 1/12/2023