Loading...
HomeMy WebLinkAboutLine 479 Impacts Table_2023.05.11Wetland Impacts Wetland Impact type Amount Reason for impacts Impacts (acre) Permanent Conversion 23.153 Clearing trees within the proposed Pipeline easement. Permanent easement will be routinely maintained, and trees not allowed to regenerate. A 20-ft wide corridor through the HDD area will be permanently maintained for line of site and pipeline maintenance. There will be no net loss to these wetlands Permanent Fill 0.101 Permanent access will impact an emergent wetland that is within an existing maintained easement. Temporary Clearing 25.167 Temporary workspace needed for project construction. vegetation/Timber Trees and other vegetation will not be maintained and mats allowed to regenerate upon project construction completion. There will be no loss or conversion of these wetlands. Stream Impacts (Intermittent and Perennial) Stream Impact type Amount Reason for impacts Impacts (LF) Temporary Open Trench/ 1,496 Open cut the stream for pipe placement. Bottom Pipe Placement sediments will be returned to stream bed upon construction completion and streams/ditches returned to pre -construction conditions. Temporary Workspace 196 Stream will be bridged with matting to cross for access and temporary workspace. Matting will be removed upon project completion and streams/ditches returned to pre -construction condition. Open Water (Ditch and ephemeral) Impacts Stream Impact type Amount Reason for impacts Impacts (LF) Temporary Open Trench/ 7,463 Open cut the stream for pipe placement. Bottom Pipe Placement sediments will be returned to stream bed upon construction completion and streams/ditches returned to pre -construction conditions. Temporary Workspace 1,034 Stream will be bridged with matting to cross for access and temporary workspace. Matting will be removed upon project completion and streams/ditches returned to pre -construction condition.