Loading...
HomeMy WebLinkAboutWQ0014391_Monitoring - 10-2023_20231128Monitoring Report Submittal .................................................. Permit Number#* WQ0014391 Name of Facility:* Month: * October Builders First Source Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: * Name of Submitter: * Signature: Date of submittal: Initial Review biowater@aol.com Randall Jarrell Reviewer: Wanda.Gerald Year:* 2023 Upload Document* BFS NDMR2 10-23.pdf PDF Only 5.88MB Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). 11 /28/2023 This will be filled in automatically Is the project number correct?* W00014391 Is the monitoring report accepted?* Yes NO Regional Office* Raleigh Reviewer: _anonymous Review Date: 11/29/2023 FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page I of R Permit No.: WQ0014391 Facility Name: Builders FirstSource -Apex Yard WWTF County: Chatham Month: October Year: 2023 PPI: 002 Flow Measuring Point: ❑ Influent ❑ Effluent ❑ No flow generated Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑ Groundwater Lowering ❑ Surface water Parameter Code -0 50050 00310 31616 00610 00625 00620 00600 00400 00665 00530 0 ; U 0 c O m F uJ O LL LO m E ti o v E ¢ r v Y o Z F y ,, z c 0 o Z a L O N 0 a m F y a o rn v� 24-hr hrs GPD mg/L #/100 mL mg/L mg/L mg/L mg/L su mg/L mg/L 1 829 2 12:35 0.42 829 6.61 3 793 4 793 5 793 6 793 7 793 8 793 9 07:50 0.5 793 6.69 10 957 11 957 121 957 13 957 14 957 15 957 16 15:45 0.42 957 6.47 17 1,300 181 1,300 19 1,300 20 1,300 21 1,300 22 1,300 23 12:25 0.67 1,300 6.61 241 1,216 25 1,216 26 1,216 27 1,216 28 1,216 29 1,216 301 12:25 0.75 1,216 7.78 311 1 927 Average: 1,047 Daily Maximum: 1,300 7.78 Daily Minimum: 793 6.47 Sampling Type: Estimate Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: 3,750 30 200 15 30 Daily Limit: Sample Frequency: 1 Monthly 3 X Year 3 X Year 3 X Year 3 X Year 1 3 X Year 1 3 X Year I Weekly 3 X Year 3 X Year FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page )�_ of 8 Sampling Person(s) Name: Randall Jarrell Name: Certified Laboratories Name: Eurofins Name: Wastewater Management, L.L.C. Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 21 compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification ORC: Randall Jarrell Certification No.: 23925 Grade: Phone Number: 919-210-2500 Has the ORC changed since the previous NDMR? ❑ Yes 0 No A,/,vU� Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. Permittee Certification Permittee: Goldston - Apex Properties, L.L.C. Signing Official: Randall Jarrell Signing Official's Title: ORC Phone Number: Permit Expiration: Signature Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page b of 9 Permit No.: VV00014391 Facility Name: Builders• - Apex Yard VVVVTF County:• October 1 •irrigationoccur Field 1 • 1 C • 1 • 1 C this facility? Area (acres):/ • 1 • 1 • at Cover Crop: Cover Crnn- NO �in�- Hourly Rate Hourly Rate -I . HourlyRate Annual Rate Annual Rate (in): Annual Rate Ciny, .•. •2M re 1 ria •. Me hu Field •. • 0 •Field Irrigatei• • • •. -• • Monthly•.•• 12 Month Floating Total (in): FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page `i of S� •.: W00014391 Facility Name: Builders• - Apex Yard WWTF County:. October 1 •irrigationoccur Field Name: Field 1 • • 1 this facility? Area (acres): 1 • 1 • 1 • / at so Cover Crop: YES NO - 1 Hourly - - HourlyRate EWffMTrF11= Annual Rate (in): Annual Rate (in): .•. • R. I In .. R. • . •. •• • • Irr lateck0a FielI Irrigated?Q • ®_____ • 1 ��� ' 1 ��� ���� ��� Monthly•.••jjj/����jjjj�j��j//����jj/�jj��jj/��/�jj/®' -Total 777724 12 Month Floating (in): FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page S of v •- • - Apex • County: . October 1 •irrigationoccur this facility? Area (acres):1 1 1 ; 1 at P-1 YES F-1 NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): A nnual Rate (in): Annual Rate (in): A nnual Rate �in). .•. .Field Irrigated? 0 • • •. •• • • •. . 1 •Field Irrigated?• • IRON IN mmml MMMI Monthly Loading:'�jjj/�� 1 11 j���j/�j%jjj/ • 11 j�jjjjj/�jjjjjj/ 1 11j�jj/�jjjj�ji / 11 12 Month Floating Total (in): /jjjjj/?jjjjjjj/jjjjjj/®jj��/%jjjj�jjjjjjj/�jj��ji.'•jjjjjjj FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page � of ij PermitNo.: WQ0014391 Facility Name: Builders First Source County: Chatham Month: October • irrigation occur re 10 Fri eVW Field Name: I this facility? Area (acres):• • at Cover Crop: YES NO Hourly Rate (in):; Annual Rate (in): ....Field Irrigated?■ p • .. ■ p • .. ■ p • .. ■ p • m =M= �� -_-- ---- -_-- ---- FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Z of a Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? Compliant ❑ Non -Compliant El Compliant ❑ Non -Compliant El Compliant ❑ Non -Compliant El Compliant ❑ Non -Compliant 0 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Randall Jarrell Permittee: Goldston -Apex Properties, L.L.C. Certification No.: 23925 Signing official: Randall Jarrell Grade: Phone Number: 919-210-2500 Signing Official's Title: ORC Has the ORC changed since the previous NDAR-1? ❑ ❑ Yes � No Phone Number: 919-201-0347 Permit Ex p•: Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 ..4 U Builders First Source 12 Month Rolling Total Application In Inches 2023 2023 2023 2023 2023 2023 2023 2023 2023 2023 2022 2022 2023 Field Jan Feb March April May June Jul August Sept Oct Nov Dec Total 1 0 0 0 3.88 0 0 0 0 0 2.8 0 0 6.68 2 0 0 0 3.88 0 0 0 0 0 2.8 0 0 6.68 3 0 0 0 3.93 0 0 0 0 0 2.88 0 0 6.81 4 0 0 0 3.88 0 0 0 0 0 3.9 0 0 6.75 5 0 0 0 3.97 0 0 0 0 0 2.8 0 0 6.77 6 0 0 0 3.97 0 0 0 0 0 2.8 0 0 6.77 7 0 0 0 3.97 0 0 0 0 0 2.87 0 0 6.76 8 0 0 0 3.88 0 0 0 0 0 2.87 0 0 6.75 9 3.99 0 0 0 0 0 4.78 0 0 0 0 0 8.77 10 3.26 0 0 0 0 0 3.91 0 0 0 0 0 7.17 11 2.55 0 0 0 0 0 3.07 0 0 0 0 0 5.62 12 3.23 0 0 0 0 0 3.74 0 0 0 0 0 6.97 13 2.26 0 0 0 0 0 2.69 0 0 0 0 0 4.95 14 3 0 0 0 0 0 3.44 0 0 0 0 0 6.44 15 2.55 0 0 0 0 0 3.07 0 0 0 0 0 5.62 16 2.19 0 0 0 0 0 2.69 0 0 0 0 0 4.88