Loading...
HomeMy WebLinkAboutNC0038377_Figure H-8 - T v. C - Bedrock - Thallium, TDS_201509020.4 0.35 O — 15 NCAC 02L Standard 0.3 BG-1 (Background) � 0.25 CW-4 E 0.2——— — — — — —— o CW-5 = 0.15 —4-- CW-6 H 0.1 {> CW-1D 0.05 t CW-2D 0 — 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date [78111 500 4— --- -- - 400 - • bA 300 cin O O �200 g ; ,, ® IV - - o 0" o O 8 0 O 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date 100 0 4 12/1/2010 Notes: Open symbols represent non detects 0 — — 15 NCAC 02L Standard --r— BG-1 (Background) CW-4 O CW-5 --#— CW-6 CW-1D t CW-2 D FIGURE H-8 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION - COMPARISON BETWEEN - GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com COMPLIANCE AND BACKGROUND WELLS BEDROCK THALLIUM, TDS DRAWN BY: J. GILMER DATE: JUNE 2015 PROJECT MANAGER J. WYLIE synTerra LAYOUT: MAYO STEAM ELECTRIC PLANT 10660 BOSTON ROAD ROXBORO, NORTH CAROLINA 27574 P:\Duke Energy Progress.1026\1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Figures\Statistics\Time-series