HomeMy WebLinkAboutNC0038377_Figure H-8 - T v. C - Bedrock - Thallium, TDS_201509020.4
0.35 O
— 15 NCAC 02L Standard
0.3 BG-1 (Background)
� 0.25 CW-4
E 0.2——— — — — — —— o CW-5
= 0.15 —4-- CW-6
H 0.1 {> CW-1D
0.05 t CW-2D
0 —
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
[78111
500 4— --- --
- 400 - •
bA
300
cin O O
�200 g ; ,, ® IV - -
o 0" o O 8
0
O
1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
100
0 4
12/1/2010
Notes: Open symbols represent non detects
0
— — 15 NCAC 02L Standard
--r— BG-1 (Background)
CW-4
O CW-5
--#— CW-6
CW-1D
t CW-2 D
FIGURE H-8
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION - COMPARISON BETWEEN
-
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
COMPLIANCE AND BACKGROUND WELLS
BEDROCK
THALLIUM, TDS
DRAWN BY: J. GILMER DATE: JUNE 2015
PROJECT MANAGER J. WYLIE
synTerra
LAYOUT:
MAYO STEAM ELECTRIC PLANT
10660 BOSTON ROAD
ROXBORO, NORTH CAROLINA 27574
P:\Duke Energy Progress.1026\1026\105. Mayo Ash Basin GW
Assessment Plan\1.11 CSA
Reporting\Figures\Statistics\Time-series