HomeMy WebLinkAboutNC0038377_Figure H-7 - T v. C - Bedrock - Manganese, Nickel, Sulfate_2015090210000
1000 O O O O O O O O O O O O —@9 �♦
� g o00 00 000 000 0
a 100
d�iD 00
10 ° o -0�
1
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
120
100
� 80
wo
60
a�
Y
Z 40
20
0
12/1/2010
1/5/2012
O O 0 O
2/8/2013 3/15/2014 4/19/2015
Sampling Date
— — 15 NCAC 02L Standard
— 0 BG-1 (Background)
CW-4
O CW-5
CW-6
— 0 CW-1D
tCW-2D
— — 15 NCAC 02L Standard
O— BG-1 (Background)
—+— CW-4
O CW-5
0 CW-6
v CW-ID
— s— CW-2D
1000
— — 15 NCAC 02L Standard
100
— 4 BG-1 (Background)
d\io
g
g
g
=7�
CW-4
10
0
0 0 o e
o Cw-5
0
--*— CW-6
cn
1
—+�—CW-1D
00
O
O
O
O
O
--4— CW-2 D
0.1
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
Notes: Open symbols represent non detects
FIGURE H-7
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION — COMPARISON BETWEEN
-
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
COMPLIANCE AND BACKGROUND WELLS
BEDROCK
MANGANESE, NICKEL, SULFATE
DRAWN BY: J. GILMER DATE: JUNE 2015
PROJECT MANAGER: J. WYLIE
■Y
Te ■
LAYOUT:
MAYO STEAM ELECTRIC PLANT
10660 BOSTON ROAD
ROXBORO, NORTH CAROLINA 27574
P:\Duke Energy Pm9ress.1026\105. Mayo Ash Basin GW
Assessment Plan\1.11 CSA
Reporting\Figures\Statistics\Time-series