Loading...
HomeMy WebLinkAboutNC0038377_Figure H-6 - T v. C - Bedrock - Chloride, Chromium, Iron_20150902300 250 — — — — — — — — — — — — — — — — J CIA 200 E v 150 .0 100 0 p 0 O 0 0 t p 0 0 p 0 U 50 O 00 O O 08.80 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date 45 40 35 =L 30 E 25 .2 20 p 15 u 10 5 0 12/1/2010 10000 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date 111 ♦• ♦ v ♦ +! e ♦ ♦ ♦ ♦ r i � ♦ 100 1 1 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date Notes: Open symbols represent non detects 15 NCAC 02L Standard —♦— BG-1 (Background) CW-4 O CW-5 —� CW-6 --4-- CW-11) tCW-2D — — 15 NCAC 02L Standard O— BG-1 (Background) —� CW-4 O CW-5 CW-6 d CW-ID — s— CW-2D — — 15 NCAC 02L Standard — 4 BG-1 (Background) CW-4 O CW-5 �— CW-6 {> CW-ID CW-2 D FIGURE H-6 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION - COMPARISON BETWEEN - GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS PHONE 864-421-9999 www.synterracorp.com BEDROCK DRAWN BY: J. GILMER DATE: JUNE 2015 CHLORIDE, CHROMIUM, IRON PROJECT MANAGER: J. WYLIE LAYOUT: Te MAYO STEAM ELECTRIC PLANT ■Y ■ P:\Duke Energy Pm9ress.1026\105. Mayo Ash Basin GW 10660 BOSTON ROAD Assessment Plan\1.11 CSA Reporting\Figures\Statistics\Time-series ROXBORO, NORTH CAROLINA 27574