HomeMy WebLinkAboutNC0038377_Figure H-6 - T v. C - Bedrock - Chloride, Chromium, Iron_20150902300
250 — — — — — — — — — — — — — — — —
J
CIA 200
E
v 150
.0 100 0 p 0 O 0 0
t p 0 0 p 0
U
50 O 00 O O
08.80
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
45
40
35
=L 30
E 25
.2 20
p 15
u 10
5
0
12/1/2010
10000
1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
111 ♦• ♦ v ♦ +! e ♦ ♦ ♦ ♦ r
i � ♦
100
1
1
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
Notes: Open symbols represent non detects
15 NCAC 02L Standard
—♦— BG-1 (Background)
CW-4
O CW-5
—� CW-6
--4-- CW-11)
tCW-2D
— — 15 NCAC 02L Standard
O— BG-1 (Background)
—� CW-4
O CW-5
CW-6
d CW-ID
— s— CW-2D
— — 15 NCAC 02L Standard
— 4 BG-1 (Background)
CW-4
O CW-5
�— CW-6
{> CW-ID
CW-2 D
FIGURE H-6
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION - COMPARISON BETWEEN
-
GREENVILLE, SOUTH CAROLINA 29601
COMPLIANCE AND BACKGROUND WELLS
PHONE 864-421-9999
www.synterracorp.com
BEDROCK
DRAWN BY: J. GILMER DATE: JUNE 2015
CHLORIDE, CHROMIUM, IRON
PROJECT MANAGER: J. WYLIE
LAYOUT:
Te
MAYO STEAM ELECTRIC PLANT
■Y
■
P:\Duke Energy Pm9ress.1026\105. Mayo Ash Basin GW
10660 BOSTON ROAD
Assessment Plan\1.11 CSA
Reporting\Figures\Statistics\Time-series
ROXBORO, NORTH CAROLINA 27574