Loading...
HomeMy WebLinkAboutNC0038377_Figure H-5 - T v. C - Bedrock - Barium, Boron, Cadmium_201509021000 L---------------- J 100 0 00 O O 0--o— 0 0 0 0 0 0 0 =L O<>O O 3 � 10 0 °D — 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date 1000 800 tw 600 C 0 400 O OD 200 o 0 O O--a-0-01 a O O O as-0--1 O 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date 2.5 J 2 — — — — — — — — — — — — — — — — dA 1.5 3 ca u 0.5 0 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date Notes: Open symbols represent non detects — — 15 NCAC 02L Standard t BG-1 (Background) —I CW-4 O CW-5 —+— CW-6 —� MAD t CW-2D — — 15 NCAC 02L Standard BG-1 (Background) —4— CW-4 O CW-5 CW-6 —� MAD —�— CW-2 D 15 NCAC 02L Standard —� BG-1 (Background) CW-4 O CW-5 CW-6 4 CW-1D * CW-2D FIGURE H-5 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION - COMPARISON BETWEEN - GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS PHONE 864-421-9999 www.synterracorp.com BEDROCK DRAWN BY: J. GILMER DATE: JUNE 2015 BARIUM, BORON, CADMIUM PROJECT MANAGER: J. WYLIE LAYOUT: Te MAYO STEAM ELECTRIC PLANT ■Y ■ P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW 10660 BOSTON ROAD Assessment Plan\1.11 CSA Reporting\Figures\Statistics\Time-series ROXBORO, NORTH CAROLINA 27574