HomeMy WebLinkAboutNC0038377_Figure H-5 - T v. C - Bedrock - Barium, Boron, Cadmium_201509021000 L----------------
J
100 0 00 O O 0--o— 0 0 0 0 0 0 0
=L O<>O O
3
� 10 0
°D
—
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
1000
800
tw 600
C
0 400
O
OD
200
o 0 O O--a-0-01 a O O O as-0--1 O
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
2.5
J
2 — — — — — — — — — — — — — — — —
dA
1.5
3
ca
u 0.5
0
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
Notes: Open symbols represent non detects
— — 15 NCAC 02L Standard
t BG-1 (Background)
—I CW-4
O CW-5
—+— CW-6
—� MAD
t CW-2D
— — 15 NCAC 02L Standard
BG-1 (Background)
—4— CW-4
O CW-5
CW-6
—� MAD
—�— CW-2 D
15 NCAC 02L Standard
—� BG-1 (Background)
CW-4
O CW-5
CW-6
4 CW-1D
* CW-2D
FIGURE H-5
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION - COMPARISON BETWEEN
-
GREENVILLE, SOUTH CAROLINA 29601
COMPLIANCE AND BACKGROUND WELLS
PHONE 864-421-9999
www.synterracorp.com
BEDROCK
DRAWN BY: J. GILMER DATE: JUNE 2015
BARIUM, BORON, CADMIUM
PROJECT MANAGER: J. WYLIE
LAYOUT:
Te
MAYO STEAM ELECTRIC PLANT
■Y
■
P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW
10660 BOSTON ROAD
Assessment Plan\1.11 CSA
Reporting\Figures\Statistics\Time-series
ROXBORO, NORTH CAROLINA 27574