Loading...
HomeMy WebLinkAboutNC0038377_Figure H-4 - T v. C - Transition Zone - Thallium, TDS_201509020.4 0.35 0.3 0.25 E 0.2 — — — — — — — — — O O = 0.15 H 0.1 O O—O-0 O O O 0.05 0 12/1/2010 1/5/2012 2/8/2013 3/15/2014 Sampling Date ;.ok alit, 400 tuD E 300 200 4/19/2015 0 1 1 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date Notes: Open symbols represent non detects — — 15 NCAC 02L Standard 0 >BG-2 (Background) CW-1 f CW-2 —CW-3 — —15 NCAC 02L Standard 0 BG-2 (Background) O Cw-1 CW-2 CW-3 FIGURE H-4 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON BETWEEN GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS PHONE 864-421-9999 VW www.synterracorp.com TRANSITION ZONE DRAWN BY: J. GILMER DATE: JUNE 2015 THALLIUM, TOTAL DISSOLVED SOLIDS Ter �r/��, PROJECT MANAGER: J. WYLIE ' r ■ LAYOUT: �-7 LADuke Energy Progress. 10z6\105. Mayo Ash Basin Gw MAYO STEAM ELECTRIC PLANT Assessment Plan\1.11 CSA 10660 BOSTON ROAD Reporting\Figures\Statistics\Time-series ROXBORO, NORTH CAROLINA 27574