HomeMy WebLinkAboutNC0038377_Figure H-4 - T v. C - Transition Zone - Thallium, TDS_201509020.4
0.35
0.3
0.25
E 0.2 — — — — — — — — — O O
= 0.15
H 0.1 O O—O-0 O O O
0.05
0
12/1/2010 1/5/2012 2/8/2013 3/15/2014
Sampling Date
;.ok
alit,
400
tuD
E 300
200
4/19/2015
0 1 1
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
Notes: Open symbols represent non detects
— — 15 NCAC 02L Standard
0 >BG-2 (Background)
CW-1
f CW-2
—CW-3
— —15 NCAC 02L Standard
0 BG-2 (Background)
O Cw-1
CW-2
CW-3
FIGURE H-4
148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON BETWEEN
GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS
PHONE 864-421-9999
VW www.synterracorp.com
TRANSITION ZONE
DRAWN BY: J. GILMER DATE: JUNE 2015 THALLIUM, TOTAL DISSOLVED SOLIDS
Ter
�r/��, PROJECT MANAGER: J. WYLIE
' r ■ LAYOUT:
�-7 LADuke Energy Progress. 10z6\105. Mayo Ash Basin Gw MAYO STEAM ELECTRIC PLANT
Assessment Plan\1.11 CSA 10660 BOSTON ROAD
Reporting\Figures\Statistics\Time-series ROXBORO, NORTH CAROLINA 27574