Loading...
HomeMy WebLinkAboutNC0038377_Figure H-2 - T v. C - Transition Zone - Chloride, Chromium, Iron_20150902300 250 — — — — — — — — — — — — — — — — — J tO 200 E �1500 00 O 0 0 0 O O 0 100 O 0 t 0 O U 50 O O O 0 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date — — 15 NCAC 02L Standard —9— BG-2 (Background) —� Cw-1 O CW-2 O CW-3 45 40 - 35 � 30 15 NCAC 02L Standard E 25 O BG-2 (Background) 20 0 CW 1 0 15 O CW-2 L U10———————————— — ——,— O CW3 5 O O O O 0 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date 10000 1000 J 100 a 0 10 1 - 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date Notes: Open symbols represent non detects 15 NCAC 02L Standard BG-2 (Background) 0 Cw-1 O CW-2 O CW-3 FIGURE H-2 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON BETWEEN VW GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.s nterracor .com COMPLIANCE AND BACKGROUND WELLS TRANSITION ZONE CHLORIDE, CHROMIUM, IRON DRAWN BY: J. GILMER DATE: JUNE 2015 PROJECT MANAGER: J. WYLIE �r/��, ///�■■/Ter .i� ■ ' r ■ �-7 LAYOUT: LADuke MAYO STEAM ELECTRIC PLANT 10660 BOSTON ROAD ROXBORO, NORTH CAROLINA 27574 Energy Progress.10z6\105. Mayo Ash Basin Gw Assessmentr,y Progress. CSA Reporting\Figures\Statistics\Time-series