HomeMy WebLinkAboutNC0038377_Figure H-2 - T v. C - Transition Zone - Chloride, Chromium, Iron_20150902300
250 — — — — — — — — — — — — — — — — —
J
tO 200
E
�1500 00 O 0 0 0
O O
0 100 O 0
t 0 O
U
50 O O O
0
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
— — 15 NCAC 02L Standard
—9— BG-2 (Background)
—� Cw-1
O CW-2
O CW-3
45
40
- 35
�
30 15 NCAC 02L Standard
E 25 O BG-2 (Background)
20 0 CW 1
0 15 O CW-2
L
U10———————————— — ——,— O CW3
5 O O O O
0
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
10000
1000
J
100
a
0
10
1 -
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
Notes: Open symbols represent non detects
15 NCAC 02L Standard
BG-2 (Background)
0 Cw-1
O CW-2
O CW-3
FIGURE H-2
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION — COMPARISON BETWEEN
VW
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.s nterracor .com
COMPLIANCE AND BACKGROUND WELLS
TRANSITION ZONE
CHLORIDE, CHROMIUM, IRON
DRAWN BY: J. GILMER DATE: JUNE 2015
PROJECT MANAGER: J. WYLIE
�r/��,
///�■■/Ter
.i� ■ ' r ■
�-7
LAYOUT:
LADuke
MAYO STEAM ELECTRIC PLANT
10660 BOSTON ROAD
ROXBORO, NORTH CAROLINA 27574
Energy Progress.10z6\105. Mayo Ash Basin Gw
Assessmentr,y Progress.
CSA
Reporting\Figures\Statistics\Time-series