HomeMy WebLinkAboutNC0038377_Figure H-1 - T v. C - Transition Zone - Barium, Boron, Cadmium_201509021000
^ O
- 100 p O p O 00 0 p 0
=L
00
O O O O p 00 O O p p O
�C 10
m
1 1
12/1/2010 1/5/2012
1000
2/8/2013 3/15/2014 4/19/2015
Sampling Date
800
_ _ _
tw 600
= 0 O
OL 400
O
m
200
0
0-0
O O O 00 O O O O O
12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015
Sampling Date
2.5
O O CT O
15 NCAC 02L Standard
O BG-2 (Background)
O Cw-1
O CW-2
O CW-3
15 NCAC 02L Standard
B— BG-2 (Background)
--9— Cw-1
O CW-2
O CW-3
15 NCAC 02L Standard
O BG-2 (Background)
O CW-1
O CW-2
O CW-3
0
12/1/2010 1/5/2012 2/8/2013 3/15/2014
4/19/2015
Sampling Date
Notes: Open symbols represent non detects
FIGURE H-1
148 RIVER STREET, SUITE 220
TIME VERSUS CONCENTRATION — COMPARISON BETWEEN
GREENVILLE, SOUTH CAROLINA 29601
COMPLIANCE AND BACKGROUND WELLS
VW
PHONE 864-421-9999
www.s nt.rracor .com
TRANSITION ZONE
DRAWN BY: J. GILMER DATE: JUNE 2015
BARIUM, BORON, CADMIUM
PROJECT MANAGER: J. WYLIE
Ter
�r/��,
LAYOUT:
LADuke
MAYO STEAM ELECTRIC PLANT
' r ■
�-7
Progress.
Energy Progress.10z6\105. Mayo Ash Basin Gw
10660 BOSTON ROAD
Assessmentrgy
CSA
Reporting\Figures\Statistics\Time-series
ROXBORO, NORTH CAROLINA 27574