Loading...
HomeMy WebLinkAboutNC0038377_Figure H-1 - T v. C - Transition Zone - Barium, Boron, Cadmium_201509021000 ^ O - 100 p O p O 00 0 p 0 =L 00 O O O O p 00 O O p p O �C 10 m 1 1 12/1/2010 1/5/2012 1000 2/8/2013 3/15/2014 4/19/2015 Sampling Date 800 _ _ _ tw 600 = 0 O OL 400 O m 200 0 0-0 O O O 00 O O O O O 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date 2.5 O O CT O 15 NCAC 02L Standard O BG-2 (Background) O Cw-1 O CW-2 O CW-3 15 NCAC 02L Standard B— BG-2 (Background) --9— Cw-1 O CW-2 O CW-3 15 NCAC 02L Standard O BG-2 (Background) O CW-1 O CW-2 O CW-3 0 12/1/2010 1/5/2012 2/8/2013 3/15/2014 4/19/2015 Sampling Date Notes: Open symbols represent non detects FIGURE H-1 148 RIVER STREET, SUITE 220 TIME VERSUS CONCENTRATION — COMPARISON BETWEEN GREENVILLE, SOUTH CAROLINA 29601 COMPLIANCE AND BACKGROUND WELLS VW PHONE 864-421-9999 www.s nt.rracor .com TRANSITION ZONE DRAWN BY: J. GILMER DATE: JUNE 2015 BARIUM, BORON, CADMIUM PROJECT MANAGER: J. WYLIE Ter �r/��, LAYOUT: LADuke MAYO STEAM ELECTRIC PLANT ' r ■ �-7 Progress. Energy Progress.10z6\105. Mayo Ash Basin Gw 10660 BOSTON ROAD Assessmentrgy CSA Reporting\Figures\Statistics\Time-series ROXBORO, NORTH CAROLINA 27574