HomeMy WebLinkAboutNC0038377_Horizontal Velocity Calc_20150902Duke Energy Progress, LLC - Mayo Steam Electric Plant
Water
Well ID
Elevation
(MSL)
MW-12S
556.60
ABMW-03S
483.04
MSL - Feet Above Mean Sea Level
Depth measurements in feet
MW-12S to ABMW-03S
DISTANCE CHANGE IN LEVEL GRADIENT
4,388 73.56 0.01676
HORIZONTAL GRADIENT (i): 0.0168
Average Groundwater Velocity (V)* Phase I
*Based on the Darcy Equation where velocity equals (K x i) / n
Hvdraulic Conductivitv values (units of ft/dav) from Table 6-9
Well ID
Slug Test
Slug Test
Hydraulic Conductivity ft/da
Measured
Geomeric Mean
Number
MW-12S
Slu Out
Test 1
2.21E-02
2.21E-02
ABMW-03S
Slu Out
Slu Out
Test 1
Test 2
4.54E-01
4.55E-01
4.55E-01
Slu Out
Test 3
4.56E-01
Hydraulic Conductivity (K) 0.1003 foot/day
(Geometric Mean of K for MW-12S and ABMW-03S)
Average Horizontal Gradient (i) 0.0168 foot/foot
Porosity (n) 35.4 percent
Velocity = 0.00475 foot/day 1.73 foot/year
ASSUMPTIONS:
Monitoring Event: June 2015
1. K of 0.1003 ft/day based on in -situ slug tests
2. Porosity is based on average value of saprolitic soils as determined by BLE (Appendix F).
Prepared by: RAG Date:
Checked: EMB Date:
8/15/2015
8/16/2015
P:\Duke Energy Progress. 1 026\1 05. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\FINAL\APPENDICES\Appendix G\Mayo_Hydraulic_Velocities
Duke Energy Progress, LLC - Mayo Steam Electric Plant
Water
Well ID
Elevation
(MSL)
ABMW-03S
483.04
MW-16S
366.92
MSL - Feet Above Mean Sea Level
Depth measurements in feet
ABMW-03S to MW-16S
DISTANCE CHANGE IN LEVEL GRADIENT
3,450 116.12 0.03366
HORIZONTAL GRADIENT (i): 0.0337
Average Groundwater Velocity (V)* Phase I
*Based on the Darcy Equation where velocity equals (K x i) / n
Hvdraulic Conductivity values (units of ft/dav) from Table 6-9
Well ID
Slug Test
Slug Test
Number
Hydraulic Conductivity ft/da
Measured
Geomeric Mean
ABMW-03S
Slug Out
I Test 1
4.54E-01
4.55E-01
Slu Out
Test 2
4.55E-01
Slu Out
Test 3
4.56E-01
MW-16S
Slu -Out
Test 1
1.73E-02
1.73E-02
Hydraulic Conductivity (K) 0.0886 foot/day
(Geometric Mean of K for ABMW-03S and MW-16S)
Average Horizontal Gradient (i) 0.0337 foot/foot
Porosity (n) 22.7 percent
Velocity = 0.01314 foot/day 4.80 foot/year
to
Porosity (n) 28.4 percent
Velocity = 0.01050 foot/day 3.83 foot/year
ASSUMPTIONS:
Monitoring Event: June 2015
1. K of 0.0886 ft/day based on in -situ slug tests
2. Porosity is based on average value of alluvium and saprolite soils as determined by BLE (Appendix F).
Prepared by: RAG Date: 8/15/2015
Checked: EMB Date: 8/16/2015
P:\Duke Energy Progress. 1 026\1 05. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\FINAL\APPENDICES\Appendix G\Mayo_Hydraulic_Velocities
Duke Energy Progress, LLC - Mayo Steam Electric Plant
Water
Well ID
Elevation
(MSL)
MW-12D
556.90
ABMW-04D
485.06
MSL - Feet Above Mean Sea Level
Depth measurements in feet
MW-12D to ABMW-04D
DISTANCE CHANGE IN LEVEL GRADIENT
3,910 71.84 0.01837
HORIZONTAL GRADIENT (i): 0.0184
Average Groundwater Velocity (V)* Phase I
*Based on the Darcy Equation where velocity equals (K x i) / n
Hvdrai lic Conductivity values (units of ft/dav) frnm Tahle 6-9
Well ID
Slug Test
Slug Test
Number
Hydraulic Conductivity ft/da
Measured
Geomeric Mean
MW-12D
I Slug Out
I Test 1
3.02E+00
3.02E+00
ABMW 04D
Slu Out
Test 1
5.88E-02
5.88E-02
Hydraulic Conductivity (K) 0.4210 foot/day
(Geometric Mean of K for MW-12D and ABMW-04D)
Average Horizontal Gradient (i) 0.0184 foot/foot
Porosity (n) 34.3 percent
Velocity = 0.02255 foot/day 8.23 foot/year
to
Porosity (n) 56.6 percent
Velocity = 0.01367 foot/day 4.99 foot/year
ASSUMPTIONS:
Monitoring Event: June 2015
1. K of 0.421 ft/day based on in -situ slug tests
2. Porosity based on values from Morris and Johnson (1967), Summary of
hydrologic and physical properties of rock and soil materials, as analyzed by
the hydrologic laboratory of the US Geological Survey, 1948-1960 (No. 1839-D).
3. Porosity values of 34.3 to 56.6 were based on site geologic conditions.
Prepared by: RAG Date:
Checked: EMB Date:
8/15/2015
015
P:\Duke Energy Progress. 1 026\1 05. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\FINAL\APPENDICESWppendix G\Mayo_Hydraulic_Velocities
Duke Energy Progress, LLC - Mayo Steam Electric Plant
Water
Well ID
Elevation
(MSL)
ABMW-04D
485.06
MW-16D
365.52
MSL - Feet Above Mean Sea Level
Depth measurements in feet
ABMW-04D to MW-16D
DISTANCE CHANGE IN LEVEL GRADIENT
3,965 119.54 0.03015
HORIZONTAL GRADIENT (i): 0.0301
Average Groundwater Velocity (V)* Phase I
*Based on the Darcy Equation where velocity equals (K x i) / n
Hydraulic Conductivity values (units of ft/day) from Table 6-9
SNumbert
Hydrauic ivity /day)
iConGeotmeric
Well ID
Slug Test
Measured
Mean
ABMW-04D
I Slug Out
I Test 1
5.88E-02
5.88E-02
Test 1
1.57E+00
EEEE����
1.33E+00
Hydraulic Conductivity (K) 0.2791 foot/day
(Geometric Mean of K for ABMW-04D and MW-16D)
Average Horizontal Gradient (i) 0.0301 foot/foot
Porosity (n) 34.3 percent
Velocity = 0.02453 foot/day 8.95 foot/year
to
Porosity (n) 56.6 percent
Velocity = 0.01487 foot/day 5.43 foot/year
ASSUMPTIONS:
Monitoring Event: June 2015
1. K of 0.2791 ft/day based on in -situ slug tests
2. Porosity based on values from Morris and Johnson (1967), Summary of
hydrologic and physical properties of rock and soil materials, as analyzed by
the hydrologic laboratory of the US Geological Survey, 1948-1960 (No. 1839-D).
3. Porosity values of 34.3 to 56.6 were based on site geologic conditions.
Prepared by: RAG Date: 8/15/2015
Checked: EMB Date: 8/16/2015
P:\Duke Energy Progress. 1 026\1 05. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\FINAL\APPENDICES\Appendix G\Mayo_Hydraulic_Velocities
Duke Energy Progress, LLC - Mayo Steam Electric Plant
Water
Well ID
Elevation
(MSL)
ABMW-04BR
483.42
MW-16BR
365.41
MSL - Feet Above Mean Sea Level
Depth measurements in feet
ABMW-04BR to MW-16BR
DISTANCE CHANGE IN LEVEL GRADIENT
3,965 118.01 0.02976
HORIZONTAL GRADIENT (i): 0.0298
Average Groundwater Velocity (V)* Phase I
*Based on the Darcy Equation where velocity equals (K x i) / n
Hydraulic Conductivity values (units of ft/day) from Table 6-9
Well ID
Slug Test
Slug Test
Number
Hydraulic Conductivit ft/da
Measured
Geomeric Mean
ABMW 04BR
Slug Out
Test 1
9.46E-03
9.46E-03
MW 16BR
Slu Out
Test 1
3.17E 03
3.17E-03
Hydraulic Conductivity (K) 0.0055 foot/day
(Geometric Mean of K for ABMW-04BR and MW-16BR)
Average Horizontal Gradient (i) 0.0298 foot/foot
Porosity (n) 4.4 percent
Velocity = 0.00370 foot/day 1.35 foot/year
to
Porosity (n) 56.6 percent
Velocity = 0.00029 foot/day 0.11 foot/year
ASSUMPTIONS:
Monitoring Event: June 2015
1. K of 0.0055 ft/day based on in -situ slug and packer tests
2. Porosity based on values from Morris and Johnson (1967), Summary of
hydrologic and physical properties of rock and soil materials, as analyzed by
the hydrologic laboratory of the US Geological Survey, 1948-1960 (No. 1839-D).
3. Porosity values of 4.4 to 56.6 were based on site geologic conditions.
Prepared by: RAG Date: 8/15/2015
Checked: EMB Date: 8/16/2015
P:\Duke Energy Progress. 1 026\1 05. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\FINAL\APPENDICES\Appendix G\Mayo_Hydraulic_Velocities