Loading...
HomeMy WebLinkAbout20150394 Ver 1_Inspection Report for 17BP 7 R 63-253 - 9 8 2015_20150909 Carpenter,Kristi From:Harrington, Barry W Sent:Wednesday, September 09, 2015 9:31 AM To:Chapman, Amy; Wanucha, Dave; Gantt, Matt; Rodgers, Ashley Cc:Harrington, Barry W; Marion, Johnie E Subject:Inspection Report for 17BP.7.R.63-253 - 9/8/2015 Attachments:InspectionReport_17BP.7.R.63-253_9-08-2015.pdf Attached is the Inspection Report for the following Project: InspectionReport_17BP.7.R.63-253_9-08-2015.pdf County: Alamance Project Location Bridge on SR 2178(Rumley Rd.) Description: over Brick House Creek.(DB) This email was generated by the NCDOT ErCon (Erosion Control Management) system. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 North Carolina Department of Transportation Roadside Environmental Unit Erosion & Sedimentation / Stormwater Report Proiect Information Inspection Date: 09/08/2015 Evaluator: Barry Harrington Project #: 17BP.7.R.63-253 TIP #: Division #: 7 County: Alamance Project Type: Contract Engineer: Graham Resident Project Length: 0.10 Disturbed Acres: 1 River Basin: Cape Fear HQW Zone: NO Trout Zone: NO Location Bridge on SR 2178(Rumley Rd.) over Brick House Creek.(DB) Description: Proiect Evaluation Report Type: ❑✓ Routine ❑PCN Length Section 0.1 The Entire Project OF NORiH �qR � `" �`ti 9 * * o = 0 9�r��NrOF iRANSQ��P ❑ICA ❑ICA Ex 1st ❑ICA Ex 2nd ❑CICA- SWO ❑ ECPAR Installation Maintenance Effectiveness Plan Overall Project of BMPs of BMPs of BMPs Implementation Evaluation 8 8 8 8 8 Grading Scale: 0- 6= Immediate Corrective Action Required, 7= Fair, 8= Good, 9= Very Good, 10 = Excellent Remarks and Recommendations: The "ICA" status on this project has been lifted. A follow-up review was conducted on Sept. 8, 2015 with Chris Kirkman, Chris Fine, Jody Andrews, w/DOT, and contractor personnel that indicated corrective actions have been taken to bring the project back into compliance. Please note the following comments and recommendations: The contractor has installed erosion control measures, as per plans. TRSC's/SSCF have been installed in four corners at wingwalls of culvert and silt fence around the headwall area. Off-site sediment in stream has been removed by hand, as per Jerry Parker, DEO/agencies. Approx. sta.12+50 Lt.- need to stabilize small area of slope above rock, as discussed. General comments: Contractor has stabilized roadbed at this time. Once shoulders/ditches are final graded, ensure e. c. measures are re-installed and disturbed areas are permanent seeded/matted. Please be reminded that the contractor is responsible for taking all reasonable measures to prevent off-site sediment. This includes surveying the project at end of each workday to ensure e. c. measures are installed, as per plans and that additional measures are installed, as needed. 9/09/2015 9:27 AM Page 1 of 1