HomeMy WebLinkAbout20211489 Ver 3_Northern Durham Parkway Phase 2_Buffer Auth Mod_Buffer Mitigation Table_202311215. Complete if Providing a Permittee Responsible Mitigation Plan
5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan,
including mitigation credits generated.
�lirk to nntar
5b. Attach mitigation plan/documentation.
6.
Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement
6a.
Will the project result in an impact within a protected riparian buffer
® Yes ❑ No
that requires buffer mitigation?
If yes, please complete this entire section — please contact DWR for more information.
6b.
If yes, identify the square feet of impact to each zone of the riparian buffer that requires
mitigation. Calculate the
amount of mitigation required in the table below.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
Road Crossing
9,297
3
27,891
Zone 2
Road Crossing
6,582
1.5
9,873
6f. Total buffer mitigation required
37,764
6g.
If buffer mitigation is required, is payment to a mitigation bank or
Fzyes El No
NC Division of Mitigation Services proposed?
6h.
If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services.
6i.
Comments:
See attached Statement of Availability from Wildlands
Page 14 of 20 PCN Form Version 4.3- April 20, 2022