Loading...
HomeMy WebLinkAboutNCC204596_NOT Closeout Documents_20231127 /��q k pU7jf ��J Oho GUILFORD COUNTY PLANNING AND DEVELOPMENT EROSION CONTROL SECTION Project Closure Notice 20-09-JACP-06531 11-27-23 Maryfield INC. Attn: Rich Newman 109 Penny Rd High Point, NC 27604 Re: Pennybyrn Dear Rich Newman, Our office is finalizing the above referenced grading permit.The finance department has been notified to return the erosion control surety, a check for$4,500.00 to you. Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self- inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Sincerely, attoei Curtis J. Moore Guilford County Planning and Development I'' II • • Don't forget to seed and fertilize once a year to maintain healthy groundcover! Earl Davis,Soil Erosion Control Section Chief.0.37,;/0-71-3.Y03 James Ta dtff.Erosion Contra!Specialist,l3361641-2259 Curtis:Lfnore.Erosion Contra!Specious t.13361641,5471 Yost Office Box 2427•Greensboro,Norrli Carolina 27402