Loading...
HomeMy WebLinkAboutNC0038377_Table D-3 Equipment Blank (Dissolved) Analytical Results_20150902TABLE D-3 EQUIPMENT BLANK (DISSOLVED) ANALYTICAL RESULTS MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Analytical Parameter Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Chromium Cobalt Copper Iron Lead Manganese Mercury Molybdenum Nickel Selenium Strontium Thallium Vanadium Zinc Reporting Units ug/I ug/l ug/I ug/I ug/I ug/I ug/I ug/I ug/I mg/I ug/1 g/I Lu ug/I ug/l ug/I ug/I ug/I mg/I ug/I ug/I mg/I Sample ID Sample Collection Date Analytical Results Filter Blank 03/11/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 Filter Blank 03/12/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.005 Filter Blank 03/17/2015 <5 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 Filter Blank 03/19/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 Filter Blank 05/13/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 NA <1 <1 <1 <0.005 <0.2 <0.3 <0.005 Filter Blank 06/17/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.011 Filter Blank 06/18/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 Filter Blank 06/19/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.008 Filter Blank 06/22/2015 <5 <1 I <1 <5 <1 <50 NA <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.011 Filter Blank 06/23/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 0.00605 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.005 Filter Blank 06/24/2015 <5 1.08 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 <0.005 Filter Blank 06/25/2015 <5 <1 <1 <5 <1 <50 <1 <1 <1 <0.001 <10 <1 <5 <0.05 <1 <1 <1 <0.005 <0.2 <0.3 0.027 Prepared by: BER/SRW Checked by: JAW Notes: mg/1 = milligrams per liter ug/I = microgram per liter NE = Not established < = concentration not detected at or above the reporting limit. P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\l.11 CSA Reporting\Appendices\Appendix D-3 Equipment Blank (Dissolved) Analytical Results.xlsx Page 1 of 1