Loading...
HomeMy WebLinkAboutWQ0003468_More Information Received_20231122Initial Review Reviewer nathaniel.thorn burg Is this submittal an application? (Excluding additional information.) * Yes No If not an application what is the submittal type?* Annual Report Residual Annual Report Additional Information Other Permit Number (IR) * W00003468 Applicant/Permittee West Fraser, Inc. Email Notifications Does this need review by the hydrogeologist? * Yes No Regional Office CO Reviewer Admin Reviewer Submittal Form Project Contact Information Please provide information on the person to be contacted by NDB Staff regarding electronic submittal, confirmation of receipt, and other correspondence. Name* Lenore R Popinchalk Email Address* lenore.popinchalk@wesffraser.com Project Information ......................... Application/Document Type* New (Fee Required) Modification - Major (Fee Required) Renewal with Major Modification (Fee Required) Annual Report Additional Information Other Phone Number* 19106554106 ext. 211 Modification - Minor Renewal GW-59, NDMR, NDMLR, NDAR-1, N DAR-2 Residual Annual Report Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https://edoes.deq.nc.gov/Forms/NonDischarge_Monitoring_Report Permit Type:* Wastewater Irrigation High -Rate Infiltration Other Wastewater Reclaimed Water Closed -Loop Recycle Residuals Single -Family Residence Wastewater Other Irrigation Permit Number:* WQ0003468 Has Current Existing permit number Applicant/Permittee Address* 361 Federal Rd, Riegelwood, NC, 28456 Facility Name* Armour Lumber Mill CLRS Please provide comments/notes on your current submittal below. ATTENTION - LEAH PARENTE At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here. (Application Form, Engineering Plans, Specifications, Calculations, Etc.) RESPONSE FOR ADD. INFO NO.2.pdf 244.57KB CFord 11.13.2023DivisionofWater. pdf 16.57KB Upload only 1 PDF document (less than 250 MB). Multiple documents must be combined into one PDF file unless file is larger than upload limit. * By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non -Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature Submission Date 11/22/2023 Armour Lumber Mill 361 Federal Rd L*J Riegetwood, NC 28456 WestFraser westFraser.com November 21, 2023 SENT VIA ELECTRONIC MAIL ATTENTION: LEAH PARENTE Subject: Application No. WQ0003468 Additional Request # 2 Armour Lumber Mill CLRS Closed Loop Recycle System Columbus County Response to NCDEQ Comments :VCDEQ Comment No. 1: Per the submitted cover letter, two of the minor modifications already performed at the jkility are described as the removal of the centrifuge system and the addition of a new oillwater separator. Please confirm that the centrifuge system was replaced by the new oillwater separator. If the centrifuge system was replaced by the new oillwater separator, please provide an attestation verging the new oil removal system is equal to or more efficient than the previous centrifuge system. West Fraser Response: As documented in the Permit Renewal and Minor Modifications Submittal Package Attachment K2 (List of Minor Modifications to the CLRS), the Swaco 414 centrifuge dewatering system was installed in 2005 adjacent to the bailer and scrubber to aid in the separation of ash and water exiting the scrubber. At the time of installation, both ash ponds (Ash Pond 1 and Ash Pond 2) were planned to be closed. However, both ash ponds have remained in operation at the Site eliminating the need for the centrifuge. The centrifuge was therefore decommissioned and removed from the Site in 2019, to reduce operations and maintenance costs at the Site. The model 6V Oil Skimmers Inc, oil water separation (OWS) was installed in August 2021 in the vehicle washdown area. The OWS was a replacement to the previous OWS, a Sandpiper PN S30BIANNANS700. The new OWS is more efficient and involves easier operations than the previous OWS. NCDEQ Comment No. 2: Per the submitted cover letter, the recirculation pump is being replaced as part of the minor rodi f cation. The operating rate of the previous recirculation pump was listed as 500 gallons per minute (GPM. Based on the performance curve submitted in the current application, the new ModeI T3A6OS- B.Self=Priming C'entrifugaI Pump eannot operate at a rate. of 500 GPM. Please provide the correct rate at which the new pump. will be operating and plot this point on tile. performance curve. West Fraser Response: The purpose. of the recirculation pump is to supply water from Ash Pond .2 to the scrubber system. Typically, the pump is operated at its maximum operating flow rate of 450 gallons per nninute (gpm) and is in operation. continuously to Deep the makeup water tank full. The p6inary source of water to the ash ponds is scrubber blowdown. The flow rate of the. scrubber blow down is typically 40 to 60 gpm and the; loss of waterevaporated in the scrubber is. around 'Ogpm. The pump has an operational.. capacity much greater than the combined scrubber blowdownlevaporation rate. Given the. much higher capacity of the pump as compared to the makeup flowrate needed, the. excess water is circulated back to the ponds from the makeup. tank. Even though the previous puanp was rated for ]OO gpm, the replacement pump is functionally a like -for -like replacement given the large. excess pumping capacity that is available in comparison to the scrubber usage. NCDEQ Comment No. 3: Per the submitted comer letter, modifieations to the Ash Pond 2 outlet pipe have been made. However, it is unclear what mod0eations were made. It appears that a rip rap pad for erosion control was adcled which involved excavation iizto the clay liner. This excavation could potentially compromise the clay liner integrity. Please provide a thorough explanation of the modifications made to the outlet pipe and comment on the clay liner integrity. West Fraser.Response.: The Ash Pond 2 outlet referred to here: is the suction end of the recirculation pump that draws. water from the ash pond to. maintain water. level. As documented in the. Perm it Renei.ml and Minor- .Modifications Submittal Package Attachment I (List of Minor Modifications to the. CLRS), anew inlet to the recirculation pump was installed at Ash Pond 2 in December 2021 to replace the old, damaged pipe. The elevation of the pipe. was anodified during the installation of the new .recirculation pump. Previously, the intake was located near the bottom of Ash :Pond 2 which resulted in elevated. solids content. being. introduced to the. recirculation pump. The. new intake pipe is submerged.just below the surface of the pond to reduce solids and is held in.place by an attached. buoy. West Fraser notes.that no excavations were performed as part of this modification and is. not aware of any additional activities that could have potentially compromised liner integrity. Based on information and belief formed after reasonable inquiry, I certify under penalty of law that all information and statements provided in these attachments are true, accurate, and com e. lf, L D.J ssel[ - General Manager Date uloo•aaseJj;som azo3.aalsag3:11 utg 8£i8£ :d!Z alulS `�Ia.�aout5 0601-I99 i06 :xaqurnu ouo-{dalay umolueuu31 :XI!D 1## 'P'd -'alax3 006I :ssarpft Sutiteut.alaldwoD suojjialo p .mquun'I -S'Cl luapisaxd aorA :allll laod 131so lD :(luud osaajd) aumu.Ju-Bogddd]aallluuod uinnolly :.au}:lu auz laFluoa aseald `suotasanh eiuu aAiaq. noA jj 89mOOoM liassn-d fQ .ra euey�l julQuag. .tagtunK .Itui.iad ao a yam uoylsoa. ur. y�uaxanj uosaad unytsad :sxaqumu Ituuad aoIpuV (uopuotidde puel `Xexds `lomoa) sadf4 linuod Siumollad. oql jod ijuis SuTmolloj aql. of sluauinoop pn)vp .11uuod..io lio xo wodaa `suoiluaaldde Inuaad IuXjivaa pue n is of �flraou#ne a e alap �gaza�{ I `90IO' LZ DVDAI VS I Aq -paluuBisap se II W. aaquzri7 znouuV `aasea_;sapj�`:ioj luraUjv BuTugis alupdoxddt uu. sV aupouoD. AuYII II wou� a;L uo!juui?isaQ AluoglnV p miruStS :loatgnS LI9I-669LZ entloreO WON `01011RU. 101ua0 aaitizaS [;FLIT L 19.1 liur.] 2ululuuad 391e1qosiQ-uox saoanasa-a 121eA�Jo uoisinrQ £ZO.Z18011i