Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0038377_Table 16-2 Recommended Groundwater Monitoring Locations_20150902
TABLE 16-2 RECOMMENDED GROUNDWATER MONITORING LOCATIONS MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Monitoring Installation ID Geologic Unit Monitored Position Relative to Ash Basin BG-1 Bedrock Upgradient/Background (south) BG-2 Transition Zone Upgradient/Background (south) CW-1 Transition Zone Sidegradient (east) CW-ID Bedrock Sidegradient (east) CW-2 Transition Zone Downgradient of ash basin dam/Crutchfield Branch area (north) CW-2D Bedrock Downgradient of ash basin dam/Crutchfield Branch area (north) CW-3 Transition Zone Downgradient (north) CW-4 Bedrock Downgradient (northwest) CW-5 Bedrock Upgradient (west) CW-6 Bedrock Downgradient (northeast) MW-2 unknown Downgradient (north) MW-3 unknown Downgradient of ash basin dam/Crutchfield Branch area MW-4 unknown Upgradient (east) MW-3BR Bedrock Downgradient (north) MW-5BR Bedrock Upgradient (west) MW-6BR Bedrock Piezometer/Water level only (northeast) MW-7D Transition Zone Mayo Lake flow regime (northeast) MW-7BR Bedrock Mayo Lake flow regime (northeast) MW-8S Saprolite Piezometer/Water level only (northeast) MW-8D Transition Zone Piezometer/Water level only (northeast) MW-8BR Bedrock Mayo Lake flow regime (northeast) MW-9BR Bedrock Mayo Lake flow regime (northeast) MW-10BR Bedrock Upgradient/Background (southeast) MW-11BR Bedrock Upgradient/Background (southwest) MW-12S Saprolite Upgradient/Background (south) MW-12D Transition Zone Upgradient/Background (south) MW-13BR Bedrock Upgradient (west) MW-14BR Bedrock Upgradient/Background (west) MW-15BR Bedrock Piezometer/Water level only (north) MW-16S Alluvium Downgradient of ash basin dam/Crutchfield Branch area (north) MW-16D Transition Zone Downgradient of ash basin dam/Crutchfield Branch area (north) MW-16BR Bedrock Downgradient of ash basin dam/Crutchfield Branch area (north) DEP-1 Bedrock Upgradient of ash basin; Mayo Lake flow regime DEP-2 Bedrock Upgradient of ash basin DEP-3 Bedrock Upgradient of ash basin P-1 Ash Basin Dam Piezometer/Water level only P-1A Ash Basin Dam Piezometer/Water level only P-2 Ash Basin Dam Piezometer/Water level only P-2A Ash Basin Dam Piezometer/Water level only P-3 Ash Basin Dam Piezometer/Water level only P-3A Ash Basin Dam Piezometer/Water level only P-4 Ash Basin Dam Piezometer/Water level only P-4A Ash Basin Dam Piezometer/Water level only Prepared by: JAW Checked by: EMB File: P:\Duke Energy Progress. 1 026\1 05. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\ReportTables\Table 16-2 Recommended Groundwater Monitoring Locations.xlsx Page 1 of 1