Loading...
HomeMy WebLinkAboutNC0038377_Table 11-1 Summary of Slug Test_20150902TABLE 11-1 SUMMARY OF SLUG TEST RESULTS MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Hydrogeologic Unit Hydraulic Conductivity Geometric Mean Highest Conductivity Lowest Conductivity cm/sec ft/day cm/sec ft/day cm/sec ft/day Ash Basin (4 wells) 1.3E-04 3.7E-01 1.5E-03 4.1E+00 1.7E-05 4.8E-02 Alluvium (1 well) 6.1E-06 1.7E-02 6.1E-06 1.7E-02 6.1E-06 1.7E-02 Saprolite (2 wells) 7.5E-05 2.1E-01 1.6E-04 4.6E-01 7.8E-06 2.2E-02 Transition Zone (3 wells) 5.3E-05 1.5E-01 1.1E-03 3.0E+00 6.8E-06 1.9E-02 Bedrock (14 wells) 7.9E-05 2.2E-01 2.0E-03 5.7E+00 1.1E-06 3.2E-03 Prepared by: EMB Checked by: JAW Notes: cm/sec = centimeter per second ft/day = feet per day P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Table 11-1 Summary of Slug Test.xlsx Page 1 of 1