Loading...
HomeMy WebLinkAboutNC0038377_Table 10-5 Charge Balance Summary_20150902TABLE 10-5 CHARGE BALANCE SUMMARY MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Sample ID Anions Cations Percent Difference Alluvial MW-16S 0.70 1.38 32.7 M W-3 1.95 3.39 27.0 Ask Pore Water ABMW-01 7.59 12.1 23.0 ABMW-02 5.70 9.62 25.5 ABMW-03 3.88 5.16 14.1 ABM W-04 6.79 11.3 24.9 Bedrock - ABM W -02BR 4.76 6.43 14.9 ABM W -04BR 4.67 5.94 12.0 BG-1 0.44 1.51 54.5 CW-1D 2.07 3.67 27.9 CW-2D 2.45 3.36 15.6 CW-4 0.76 1.55 34.0 CW-5 2.82 4.11 18.7 CW-6 6.58 9.05 15.8 MW-03BR 8.60 x 10-5 5.40 x 10-2 99.7 M W-05BR 4.34 6.45 19.5 MW-07BR 3.47 4.81 16.2 MW-08BR 6.12 8.71 17.4 MW-09BR 1.19 2.18 29.5 MW-lOBR 4.13 5.03 9.8 MW-11BR 3.34 4.15 10.8 MW-13BR 4.70 6.16 13.5 MW-14BR 1.59 2.82 27.7 MW-16BR 2.06 2.53 10.3 M W-2 1.12 2.95 45.0 M W-4 1.57 2.91 29.8 Saprolite ABMW-03S 0.25 1.57 72.5 MW-12S 0.18 0.53 48.3 Transition ABMW-04D 6.38 15.5 41.6 BG-02 3.12 5.98 31.4 CW-01 0.94 1.72 29.7 CW-02 2.54 2.40 2.82 CW-03 4.45 6.07 15.4 M W-07D 3.96 6.56 24.7 MW-12D 0.51 1.37 46.2 MW-16D 1.50 2.20 19.0 Seep 5-01 2.79 4.44 22.8 5-02 2.92 4.25 18.6 S-02B 3.15 4.30 15.4 5-03 2.63 3.65 16.3 5-04 2.54 4.02 22.7 5-05* 3.41 4.16 9.92 5-06 1.10 1.75 22.8 5-08 3.86 4.77 10.6 Surface Water SW-CB1 1.96 3.14 23.1 S W -CB2 1.37 2.27 24.6 SW-REF1 0.63 1.00 22.9 Notes: * 5-05 is a wastewater sample collected from the east side of the ash basin, adjacent to the Forebay. Prepared by: bRW cnecked by: IM2 Revised by: EMB Rechecked by: JAW P:\Duke Energy Progress. 1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Table 10-5 Charge Balance Summary Page 1 of 1