Loading...
HomeMy WebLinkAboutNC0038377_Table 8-9 Whole Rock Elemental Analysis of Soil_20150902TABLE 8-9 WHOLE ROCK ELEMENTAL ANALYSIS OF SOIL MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC As Cd Ce Co Cu Ga La Mo Ni Pb Sb Se Sn W Zn Zr Sample ID ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ABMW-02BR(57-59) 2 0.3 23 40 86 13 5 <1 44 13 3 <1 32 <1 101 5 MW-09BR(44-46) 2 0.5 28 69 48 14 12 3 597 10 2 <1 <1 <1 369 17 MW-11BR (30-32) <1 <0.2 38 7 18 12 18 1 6 7 3 <1 <1 <1 39 12 MW-12BR (50-51.5) 95 <0.2 79 6 64 15 50 6 18 13 1 <1 4 <1 79 159 MW-13BR (17-27) 4 0 42 64 477 13 12 3 39 7 2 <1 <1 <1 125 11 SB-7 (4.5-7.5) JI4 <0.2 67 6 10 8 15 2 9 15 <1 <1 <1 1 26 12 Prepared by: DMY Checked by: EMB Notes: ppm = parts per million < = concentration not detected at or above the reporting limit. P:\Duke Energy Progress. 1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Table 8-9 Whole Rock Elemental Analysis of Soil.xlsx Page 1 of 1