Loading...
HomeMy WebLinkAboutNC0038377_Table 8-5 Whole Rock Metal Oxide Analysis of Core_20150902TABLE 8-5 WHOLE ROCK METAL OXIDE ANALYSIS OF CORE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Sample ID AIz03 BaO CaO Cr203 Fe203 K20 Mg0 MnO Na20 P201 S'02 SrO Ti02 V201 LOI ABMW-02BR (97-100) 17.75 0.07 2.81 0.05 4.64 1.72 1.31 0.06 1.67 0.10 70.82 0.07 0.40 <0.01 1.51 ABMW-04BR (105-107) 17.12 0.07 2.77 0.03 4.24 1.87 0.98 0.13 1.64 0.08 68.39 0.07 0.34 <0.01 1.71 MW-05BR (61-63) 14.34 0.09 3.04 0.02 3.32 1.52 0.68 0.09 1.41 0.14 39.12 0.04 0.31 <0.01 2.21 MW-07BR (22-24) 15.92 0.10 1.92 <0.01 2.45 2.27 0.57 0.10 2.19 0.13 75.28 0.05 0.42 <0.01 0.95 MW-10BR (51.5-53.5) 13.30 0.08 1.07 0.02 2.81 1.52 0.18 0.06 1.53 0.09 37.39 0.01 0.27 <0.01 0.99 MW-11BR (43-44) 13.98 0.04 11.43 <0.01 15.24 0.82 6.79 0.15 1.06 0.24 47.26 0.08 1.05 0.10 1.68 MW-12BR (88.5-90) 12.74 0.10 0.79 0.06 9.54 2.58 4.89 0.27 0.57 0.08 63.23 0.02 0.63 0.04 3.88 MW-13BR (52-54) 13.37 0.14 1.44 <0.01 5.34 1.44 1.13 0.11 1.50 0.21 67.54 0.03 1.10 0.01 1.87 MW-14BR (40-41.5) 13.91 0.08 3.18 0.03 3.19 1.52 0.70 0.05 1.46 0.14 37.39 0.04 0.33 <0.01 1.52 MW-15BR (58-63) 19.03 j 0.08 3.64 j <0.01 j 5.05 1.51 j 1.23 0.07 j 1.64 0.12 j 67.68 j 0.08 0.42 <0.01 0.80 MW-16 (54-55) 17.45 0.05 3.89 <0.01 5.97 1.45 2.04 0.11 1.69 0.22 60.19 0.05 0.50 <0.01 2.36 Prepared by: DMY Checked by: KDF Notes: %= percent < = concentration not detected at or above the reporting limit P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Repo rting\Tables\Report Tables\Table 8-5 Whole Rock Metal Oxide Analysis of Core.xlsx 1 of 1