Loading...
HomeMy WebLinkAboutNC0038377_Table 8-4 Whole Rock Elemental Analysis of Core_20150902TABLE 8-4 WHOLE ROCK ELEMENTAL ANALYSIS OF CORE MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC As Cd Ce Co Cu Ga La Mo Ni Pb Sb Se Sn W Zn Zr Sample ID ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ABMW-02BR (97-100) 2 <0.2 66 12 67 17 30 2 5 11 2 1 42 1 42 15 ABMW-04BR (105-107) 2 0.5 58 6 4 15 26 1 4 14 2 2 35 <1 201 18 MW-05BR (61-63) <1 <0.2 14 10 102 14 7 1 4 8 1 1 <1 1 52 17 MW-07BR (22-24) 101 <0.2 113 5 9 15 41 4 14 7 <1 1 1 <1 48 33 MW-lOBR (51.5-53.5) <1 <0.2 6 4 3 12 3 <1 2 9 <1 <1 9 <1 34 23 MW-11BR (43-44) 3 0.2 45 52 366 11 13 6 69 6 5 1 1 <1 120 15 MW-12BR (88.5-90) 96 0.4 56 34 22 13 15 6 153 11 <1 <1 1 <1 328 54 MW-13BR (52-54) 2 <0.2 53 12 50 13 25 2 20 8 <1 2 1 <1 52 16 MW-14BR (40-41.5) <1 <0.2 14 8 75 12 7 3 6 7 <1 <1 <1 <1 17 20 MW-15BR (58-63) 5 <0.2 94 9 13 12 28 1 7 12 <1 <1 <1 <1 35 17 MW-16 (54-55) 2 <0.2 88 13 25 12 27 4 29 12 1 <1 <1 <1 71 18 Prepared by: DMY Checked by: KDF Notes: ppm = parts per million < = concentration not detected at or above the reporting limit. P:\Duke Energy Progress. 1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Table 8-4 Whole Rock Elemental Analysis of Core.xlsx 1 of 1