Loading...
HomeMy WebLinkAboutNC0038377_Table 6-5 Well Construction Data_20150902TABLE 6-5 WELL CONSTRUCTION DATA MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC IDENTIFICATION DATE INSTALLED MONITORING ZONE MATERIAL DIAMETER (INCHES) NORTHING (FEET) EASTING (FEET) MEASURING POINT TOC ELEVATION (Feet- MSL) GROUND SURFACE ELEVATION (FEET- MSL) DTW FROM TOC'(FEET BGS) WATER LEVEL ELEVATION (FEET- MSL) BORING D(FEET3 (FEET BGS) SURFACE CASING DEPTHS (FEET BGS) TOTAL WELL z3 DEPTH' (FEET BGS) MEASURED WELL DEPTH i (FEET TOC) SCREENED INTERVAL s (FEET BGS) TOP OF SCREEN ELEVATION (FEET- MSL) BOTTOM OF SCREEN ELEVATION (FEET- MSL) Ash Basin ABMW-01 6/2/2015 Ash PVC 2.00 1012988.38 2029253.96 483.81 481.11 5.88 477.93 13.30 NA 13.30 15.65 2.80 13.30 478.31 467.81 ABMW-02 5/31/2015 Ash PVC 2.00 1012778.26 2030477.81 493.90 490.68 12.34 481.56 41.50 NA 39.20 NM 34.00 39.20 456.68 451.48 ABMW-02BR 6/3/2015 Bedrock PVC 2.00 1012781.97 2030476.42 493.85 490.65 11.10 482.75 130.00 0-41.0 106.00 NM 94.00 104.00 396.65 386.65 ABMW-03 5/20/2015 Ash PVC 2.00 1012714.21 2030856.72 500.17 497.34 17.15 483.02 40.50 NA 40.50 NM 35.30 40.50 462.04 456.84 ABMW-03S 5/27/2015 Saprolite PVC 2.00 1012718.52 2030858.24 500.30 497.33 17.26 483.04 68.00 0-43.0 61.00 NM 50.00 60.00 447.33 437.33 ABMW-04 5/31/2015 Ash PVC 2.00 1012345.36 2030478.85 491.44 488.76 6.33 485.11 60.00 NA 53.20 56.20 48.00 53.20 440.76 435.56 ABMW-04D 5/31/2015 Transition Zone PVC 2.00 1012350.06 2030467.97 491.50 488.68 6.44 485.06 64.50 0-54.5 64.50 63.80 55.80 61.00 432.88 427.68 ABMW-04BR 6/4/2015 Bedrock PVC 2.00 1012348.07 2030473.02 491.61 488.62 8.19 483.42 108.50 0-60.0 108.50 RM 98.70 108.20 389.92 380.42 GAP Wells MW-03BR 2/10/2015 Bedrock PVC 2.00 1015654.79 2031277.75 438.24 435.53 16.41 421.83 77.00 NA 75.10 76.35 68.77 74.00 366.76 361.53 MW-05BR 1/30/2015 Bedrock PVC 2.00 1015146.30 2029179.66 511.40 508.74 9.46 501.94 67.00 NA 65.00 RM 58.00 63.00 450.74 445.74 MW-06BR (piezometer) 4/13/2015 Bedrock PVC 2.00 1014756.09 2033040.31 463.99 461.70 56.84* 407.146* 100.00 NA 100.00 RM 90.00 100.00 371.70 361.70 MW-07D 4/25/2015 Transition Zone PVC 2.00 1014307.45 2034169.17 453.94 451.17 9.48 444.46 32.50 NA 32.50 32.70 19.50 30.40 431.67 420.67 MW-07BR 4/24/2015 Bedrock PVC 2.00 1014311.86 2034175.46 453.50 451.21 7.56 445.94 77.50 NA 77.50 79.60 66.80 77.50 384.46 373.71 MW-08S (piezometer) 2/16/2015 Saprolite PVC 2.00 1014446.92 2034603.67 466.87 466.94 29.85 437.02 30.08 NA 30.08 30.20 25.10 30.10 441.90 436.90 MW-08D (piezometer) 2/16/2015 Transition Zone PVC 2.00 1014443.85 2034599.43 466.89 467.04 33.36 433.53 41.00 NA 41.00 38.30 33.30 38.50 433.77 428.54 MW-08BR 2/14/2015 Bedrock PVC 2.00 1014440.25 2034593.99 466.99 467.27 34.45 432.54 86.50 0-46.5 67.67 RM 61.80 67.00 405.47 400.27 MW-09BR 4/11/2015 Bedrock PVC 2.00 1013360.32 2033864.48 495.39 492.85 24.97 470.42 66.00 NA 61.00 NM 48.00 58.00 444.85 434.85 MW-10BR 2/25/2015 Bedrock PVC 2.00 1011436.41 2032770.90 513.39 513.47 13.82 499.57 65.50 NA 65.50 57.60 48.00 58.00 465.47 455.47 MW-11BR 4/24/2015 Bedrock PVC 2.00 1010083.75 2027499.40 527.36 524.34 39.31 488.05 95.00 NA 95.00 NM 84.30 94.40 440.09 429.90 MW-12S 4/29/2015 Saprolite PVC 2.00 1008653.91 2029202.47 587.38 587.48 30.78 556.60 56.00 NA 51.00 RM 39.50 49.50 547.98 537.98 MW-12D 4/28/2015 Transition Zone PVC 2.00 1008654.13 2029191.43 588.02 588.17 31.12 556.90 97.00 NA 97.00 RM 87.00 97.00 501.17 491.17 MW-13BR 4/15/2015 Bedrock PVC 2.00 1013587.37 2027633.00 528.83 526.67 33.36 495.47 107.00 NA 100.00 100.71 88.80 99.00 437.87 427.97 MW-14BR 2/5/2015 Bedrock PVC 2.00 1015432.97 2028964.70 520.75 517.76 16.14 504.61 46.40 NA 35.40 36.87 29.00 34.00 488.76 483.76 MW-15BR (piezometer) 5/12/2015 Bedrock PVC 2.00 1016021.83 2031813.20 460.92 460.94 58.24 402.68 78.50 NA 64.00 62.64 52.60 62.50 407.94 397.94 MW-16S 5/8/2015 Alluvium PVC 2.00 1015654.53 2032640.89 371.11 367.94 4.19 366.92 8.50 NA 8.50 10.59 5.00 7.60 363.04 360.34 MW-16D 5/8/2015 Transition Zone PVC 2.00 1015659.09 2032643.26 371.21 367.74 5.69 365.52 39.00 NA 39.00 41.44 28.70 38.90 339.07 328.81 MW-16BR 5/8/2015 Bedrock PVC 2.00 1015664.50 2032645.73 371.30 367.83 5.89 365.41 65.00 0-47.2 1 59.50 1 62.26 1 48.70 59.00 1 319.13 308.87 Previously Installed Wells BG-1 10/15/2008 Bedrock PVC 2.00 2028480.40 1012000.52 540.11 537.04 29.85 510.26 NA 52.00 55.20 42.00 52.00 495.04 485.04 BG-2 9/28/2010 Transition Zone PVC 2.00 2028799.48 1010809.99 542.66 539.84 31.50 511.16 53.00 NA 53.00 48.40 25.40 44.90 514.44 494.94 CW-1 11/9/2010 Transition Zone PVC 2.00 2032714.46 1012696.54 489.88 486.96 17.68 472.20 25.50 NA 25.50 28.82 15.50 25.00 471.46 461.96 CW-1D 11/8/2010 Bedrock PVC 2.00 2032715.65 1012703.55 490.96 488.31 19.03 471.93 40.40 NA 40.40 43.65 30.10 39.90 458.21 448.41 CW-2 11/11/2010 Transition Zone PVC 2.00 2032238.71 1015043.98 389.00 386.56 13.71 375.29 18.00 NA 18.00 20.47 7.70 17.80 378.86 368.81 CW-2D 11/11/2010 Bedrock PVC 2.00 2032245.02 1015046.88 389.53 386.93 14.24 375.29 55.90 NA 55.90 58.55 45.60 55.40 341.33 331.53 CW-3 11/16/2010 Transition Zone PVC 2.00 2031278.02 1015647.59 437.68 435.27 15.80 421.88 32.30 NA 32.30 34.76 17.00 31.80 418.27 403.47 CW-4 11/12/2010 Bedrock PVC 2.00 2030436.27 1015911.44 451.31 448.76 23.61 427.70 40.30 NA 39.98 42.81 35.00 39.80 413.76 408.96 CW-5 11/15/2010 Bedrock PVC 2.00 2029182.29 1015162.23 509.60 507.21 8.07 501.53 43.00 NA 43.00 44.03 36.30 41.10 470.91 466.11 CW-6 11/11/2010 Bedrock PVC 2.00 2033046.08 1014743.82 462.83 RS 12.02 450.81 77.40 NA 77.40 80.56 72.10 76.90 363.17 358.37 MW-2 10/14/2008 Bedrock PVC 2.00 1015359.31 2030912.32 461.23 459.18 26.12 435.11 48.00 NA 48.00 50.12 38.00 48.00 421.18 411.18 MW-3 10/14/2008 Alluvium PVC 2.00 1014955.04 2032010.00 384.00 RS 6.68 377.32 18.00 NA 18.00 19.93 8.00 18.00 374.00** 364.00** MW-4 10/15/2008 Bedrock PVC 2.00 1013846.48 2032346.28 522.77 519.46 26.16 496.61 55.00 NA 55.00 59.05 35.00 55.00 484.46 464.46 P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Table 6-5 Well Construction Data.xlsx Page 1 of 2 TABLE 6-5 WELL CONSTRUCTION DATA MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC IDENTIFICATION DATE INSTALLED MONITORING ZONE MATERIAL DIAMETER (INCHES) NORTHING (FEET) EASTING (FEET) MEASURING POINT TOC ELEVATION (Feet- MSL) GROUND SURFACE ELEVATION (FEET- MSL) DTW FROM TOC' FEET ( BGS) WATER LEVEL ELEVATION (FEET- MSL) BORING D(FEET3 (FEET BGS) SURFACE CASING DEPTHS (FEET BGS) TOTAL WELL zs DEPTH' (FEET BGS) MEASURED WELL DEPTH i (FEET TOC) SCREENED INTERVAL s (FEET BGS) TOP OF SCREEN ELEVATION (FEET- MSL) BOTTOM OF SCREEN ELEVATION (FEET- MSL) Previously Installed Piezometers P1 1983 Earthen Dam PVC 2.00 1015210.58 2030732.42 475.86 473.43 32.09 443.77 ? ? ? 51.22 ? ? ? ? P1A 1983 Earthen Dam PVC 2.00 1015207.52 2030735.62 475.00 473.38 35.19 439.81 ? ? ? 36.40 ? ? ? ? P2 1983 Earthen Dam PVC 2.00 1014965.67 2031226.56 458.65 455.77 44.96 413.69 ? ? ? 49.66 ? ? ? ? P2A 1983 Earthen Dam PVC 2.00 1014968.75 2031221.26 458.62 456.17 Dry Dry ? ? ? 18.00 ? ? ? ? P3 1983 Earthen Dam PVC 2.00 1014648.01 2031793.01 446.99 443.69 52.58 394.41 ? ? ? 67.84 ? ? ? ? P3A 1983 Earthen Dam PVC 2.00 1014650.72 2031787.93 445.69 443.39 50.83 394.86 ? ? ? 51.34 ? ? ? ? P4 1983 Earthen Dam PVC 2.00 1014521.83 2031950.40 454.57 452.59 37.55 417.02 ? ? ? 64.15 ? ? ? ? P4A 1983 Earthen Dam PVC 2.00 1014524.33 2031947.13 454.99 452.70 36.15 418.84 ? ? ? 36.17 ? ? ? ? Notes: BGS - Below ground surface NA - Not applicable MSL - Mean sea level NM - Not measured 1-Well depths and depth to water (DTW) measured by SynTerra, June 17, 2015 2 - "Boring Depth" is the total depth of soil boring; "Total Well Depth" is the depth to the bottom of the filter pack 3 - Values measured during well installation ? - No boring logs available for previously installed piezometers *Water level was still recharging during 24-Hour water level reading ** Estimated until ground surface elevation is resurveyed Monitoring well coordinate and elevation data for newly installed wells from surveys provided by McKim & Creed, completed by 6/24/15 PVC- Polyvinyl chloride RS - Needs to be resurveyed RM - Needs to be remeasured Prepared by: EMB Checked By: DH Revised by: EMB Rechecked by: JAW P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Table 6-5 Well Construction Data.xlsx Page 2 of 2