Loading...
HomeMy WebLinkAboutNC0038377_Table 6-2 Exploration and Sampling Plan- WATER_20150902TABLE 6-2 EXPLORATION AND SAMPLING PLAN - WATER MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Well ID Rnd 1 Rnd 2 GWAP Speciation U/Ra Screened Interval (ft. bgs) Aquifer Rnd 1 Rnd 2 GWAP Comp Fe � Mn Fe Mn Cr As Rnd 1 Rnd 2 BG-1 X X 42.0-52.0 Bedrock BG-2 X X X 25.4-44.9 Transition CW-1 X X 15.5-25.0 Transition CW-11D X X 30.1-39.9 Bedrock CW-2 X X X 7.7-17.5 Transition CW-21D X X X X 45.6-55.4 Bedrock CW-3 X X 17.0-31.8 Transition CW-4 X X 35.0-39.8 Bedrock CW-5 X X 36.3-41.1 Bedrock CW-6 X X 72.1-76.9 Bedrock MW-2 X X 38.0-48.0 Bedrock MW-3 X X X X 8.0-18.0 Alluvium MW-4 X X 35.0-55.0 Bedrock MW-3BR X X 69.0-74.0 Bedrock MW-5BR X X 58.0-63.0 Bedrock MW-71D X X 19.5-30.5 Transition MW-7BR X X 66.75-77.5 Bedrock MW-8BR X X 62.0-67.0 Bedrock MW-9BR X X 48.0-58.0 Bedrock MW-10BR X X 48.0-58.0 Bedrock MW-11BR X X 85.0-95.0 Bedrock MW-12S X X X 40.0-50.0 Saprolite MW-12D X X X X X 87.0-97.0 Transition MW-13BR X X X X 89.0-99.0 Bedrock MW-14BR X X 29.0-34.0 Bedrock MW-16S X X X X X 5.0-7.5 Alluvium MW-16D X X X X X 29.0-39.0 Transition MW-16BR X X X X X 49.0-59.0 Bedrock ABMW-3 X X X X 35.3-40.5 Ash ABMW-3S X X X X 50.0-60.0 Saprolite ABMW-4 X X X X 48.0-53.2 Ash ABMW-4D X X X X 55.8-61.0 Transition ABMW-4BR X X X X 98.7-108.5 Bedrock ABMW-2 X X X X 34.0-39.2 Ash ABMW-2BR X X X X 94.0-104.0 Bedrock ABMW-1 X X X X X X 2.8-13.3 Ash Notes: l.reatea Dy: tivib l.neCKea Dy: u1v1Y ft. bgs - feet below ground surface Revised by: EMB Rechecked by: JAW GWAP - field parameters, inorganics and anions/cations from Table 6-4 Comp - NPDES compliance parameters Rnd- Round MW-06BR, MW-085, MW-08D and MW-15BR were not included because they are piezometers P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\Table 6-2 Exploration and Sampling Plan- WATER.xlsx Page 1 of 1