Loading...
HomeMy WebLinkAboutNC0038377_TABLE 2-1 NDPES monitoring REVISED 8 18 2015_20150902TABLE 2-1 NPDES GROUNDWATER MONITORING REQUIREMENTS MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Well Nomenclature Parameter Description Frequency Aluminum Chloride Mercury Thallium Antimony Chromium Nickel TDS BG-1, BG-2, Arsenic Copper Nitrate Water Level CW-1, CW-1D, CW-2, CW-2D, April, July, and CW-3, CW-4, CW-5, CW-6 November Barium Iron pH Zinc Boron Lead Selenium Cadmium Manganese Sulfate Prepared by: JAW Checked by: RKD Notes: Constituent list adjusted in April 2015 to include additional parameters. P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\1.11 CSA Reporting\Tables\Report Tables\TABLE 2-1 NDPES monitoring REVISED 8 18 2015.docx Page 1 of 1