HomeMy WebLinkAbout20231309 Ver 1_RE_ _External_ RE_ Fee Received for 180 Duck Pointe ID # 20231309 Ver 1_20231127Baker, Caroline D
From: Joe Hodges <joe@greenstatepower.com>
Sent: Monday, November 27, 2023 3:08 PM
To: Myers, Joseph M
Subject: RE: [External] RE: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
The contractor I plan to have do this said roughly 2' below the waterline and 3-5' above the waterline. Do you want me
to update my drawing to show this?
Thanks!
Joe Hodges I Project Manager
C: (336) 688-1314
Joe(@GreenStatePower.com
From: Myers, Joseph M <joseph.myers@deq.nc.gov>
Sent: Monday, November 27, 2023 3:04 PM
To: Joe Hodges <joe@greenstatepower.com>; 'Capito, Rachel A CIV (USA)' <Rachel.A.Capito@usace.army.mil>
Subject: RE: [External] RE: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
Mr. Hodges,
Thank you for getting back to me so quickly. I appreciate the drawings your provided. Would you be able to tell me the
approximate depth of the riprap? I need to know how many feet above and below the normal waterline the riprap will
be placed. For example, some people have 4 feet below the water level and 2 feet above. Please see below for an
example of the information I need.
3 ft. below gull pond water legal A ft_above full pond water level 2 ft. addiNnal clearing
`If necessary
Existing bank
10 fl. bank �
heightOF '
Side Vi r PLE
Thank you,
Joe Myers
Environmentol Speciolist 11
North Carolina Department of Environmental Quality
Office: (919) 791-4256 1 Cell: (919) 906-8056
Joseph. Myers@deq. nc.gov
D- E
NOP I H (,AHOI INn
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Joe Hodges <joe@greenstatepower.com>
Sent: Monday, November 27, 2023 2:29 PM
To: Myers, Joseph M <joseph.myers@deq.nc.gov>; 'Capito, Rachel A CIV (USA)'<Rachel.A.Capito@usace.army.mil>
Subject: RE: [External] RE: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Joe,
Please see the plan I created. After talking to a contractor about shoreline, I decided not to do any sea walls (Only Rip
Rap). Also, I included adding Rip Rap to the surface around my dock to prevent any sediment inclusion. With the water
levels so low right now, I would love to get this done as soon as I can. Please let me know if you have any questions.
Rachel, I understand dredging is a different topic and may not be a good thing to include part of this permit. Can you
help me understand what I need to do to apply for a Dredging permit? I understand this will be subject to Duke Energy
and the Lake Authority approval.
Joe Hodges I Project Manager
C: (336) 688-1314
Joe@GreenStatePower.com
From: Myers, Joseph M <joseph.myers@deq.nc.gov>
Sent: Monday, November 20, 2023 2:50 PM
To: Joe Hodges <joe@greenstatepower.com>; Capito, Rachel A CIV (USA)<Rachel.A.Capito@usace.army.mil>
Subject: RE: [External] RE: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
Good afternoon Mr. Hodges,
After reviewing your application, I do have a request for additional information. The summary of your plans includes a
Sea Wall, Riprap installation and Dredging. Designs and dimensions of these plans were not provided in your application.
Please provide our office with detailed plans that show the dimensions, size (above and below normal water level) and
location of the seawall and riprap. With this request for additional information, this project will be placed on hold. Once
I receive all of the requested information, I will resume my review of this project.
As far as the dredging, I will have to defer to the USACE.
Rachel — Can you provide any insight as to if Mr. Hodges dredging is an activity that may be authorized? If you are able
to permit this activity, then we should be able to make this fit as well. This activity just raised a question in our office,
and we wanted to get your input with this matter?
Thank you both for your time,
Joe Myers
Environmental Specialist 11
North Carolina Department of Environmental Quality
Office: (919) 791-4256 1 Cell: (919) 906-8056
Joseph. Myers@deq. nc.gov
NO H I H (nARQI INA D
ki;
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Joe Hodges <joe@greenstatepower.com>
Sent: Tuesday, November 14, 2023 11:24 AM
To: Myers, Joseph M <joseph.myers@deq.nc.gov>
Subject: Re: [External] RE: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Great, thanks
Yes, 336-688-1314 is the best phone number
Joe Hodges
336-688-1314
On Nov 14, 2023, at 8:19 AM, Myers, Joseph M <joseph.myers@deq.nc.gov> wrote:
Hello Mr. Hodges,
I appreciate you following up. I will be taking my first look at this project either today or tomorrow and
will be sure to reach out with any questions. If I don't have any questions, I'll be able to issue the
certification within the next few days. If I do have questions, is the phone number you have listed a good
point of contact for you? Sometimes communicating over the phone is easier if they are simple
clarification questions.
Thank you,
Joe Myers
Environmental Specialist II
North Carolina Department of Environmental Quality
Office: (919) 791-4256 1 Cell: (919) 906-8056
Joseph. Myers@deq. nc.gov
<image001.png>
From: Joe Hodges <joe@greenstatepower.com>
Sent: Monday, November 13, 2023 1:57 PM
To: Myers, Joseph M <joseph.myers@deq.nc.gov>
Subject: RE: [External] RE: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Mr. Myers,
I just wanted to follow up on my project. I appreciate your help. This is the first time that I submitted
an application like this and I was unsure if I provided enough information.
Thanks!
Joe Hodges I Project Manager
C: (336) 688-1314
Joe@GreenStatePower.com
From: Myers, Joseph M <joseph.myers@deq.nc.gov>
Sent: Tuesday, October 3, 2023 10:50 AM
To: Joe Hodges <joe@greenstatepower.com>
Subject: RE: [External] RE: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
Hello, Mr. Hodges,
The review time varies, but I do have a 120-day deadline from which we received your application on
9/21. Your project should not take that long, but it is hard for me to give an exact estimate as there are
7 more projects on my list to review that were received prior to yours. Barring any setbacks or questions
regarding your application, I have an internal 60-day deadline which ends around 11/20/23. If I had to
put an estimate on the application review, I would assume it will be sometime early November when I
begin review.
We do not have to meet onsite, any questions I may have I can ask via email or contact you over the
phone. Please let me know if you have any more questions.
Thanks for your time,
Joe Myers
Environmental Specialist 11
North Carolina Department of Environmental Quality
Office: (919) 791-4256 1 Cell: (919) 906-8056
Joseph. Myers@deq. nc.gov
<i mage001. png>
From: Joe Hodges <joe@greenstatepower.com>
Sent: Tuesday, October 3, 2023 7:27 AM
To: Myers, Joseph M <joseph.myers@deq.nc.gov>
Subject: [External] RE: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Mr. Myers,
I just wanted to ask how long this typically takes to go through review? Do we meet onsite at some
point? This is my first time going through this process.
I mainly wanted to get a time frame to start getting some pricing from contractors on installing the Rip
Rap. Thanks!
Joe Hodges I Project Manager
C: (336) 688-1314
Joe(@GreenStatePower.com
From: laserfiche.ncdenr.gov@mccicloud.io <laserfiche.ncdenr.gov@mccicloud.io>
Sent: Friday, September 22, 2023 12:22 PM
To: Joe@GreenStatePower.com
Subject: Fee Received for 180 Duck Pointe ID # 20231309 Ver 1
The North Carolina Division of Water Resources has received the application called 180 Duck Pointe that
you submitted on with corresponding fee received on 9/21/2023. The ID number for that project is
20231309, Version 1.
Reviewer Contact Information: Joseph Myers - joseph.myers@deg.nc.ov
Reviewing Office: Raleigh Regional Office
If you have questions, please contact
Sheri Montalvo at sheri.montalvo@deg.nc.gov
Project file link: https://edocs.deg.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=2970544
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses aren't monitored. responses aren't monitored.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.