Loading...
HomeMy WebLinkAboutNC0038377_Figure 12-13 - COPC Locations Flagged - Sediment - Ecological_20150902A 4 l • rJ � ...... - -- — -- • �. / SAl -02 AI • • Cr(Total) • • S-01 Fe / As Mn • • Zn V ' S-01 s. h J Al As Ba B Cr(Total) Fe Mn Zn Al Cr(Total) Fe Mn S-03 1. Cr(Total) SW-CB2 AI S-03 Cr(TotalI Al Fe Mn Cr(Total) Fe V - Mn Nx V SR.1501.N Ilk - r' v SW-CB1 Al Cr(Total) Fe Mn V 1981 LANDFILL 1♦ • r. S-06 .� t. Zn r 40 S-06 All Cr(Total) Fe • + Mn A Zn 7 LEGEND EPA R4 EFFECTS VALUE EXCEEDANCE - (SEE TABLES 12-2 AND 12-16)' EPA R4 SOIL SCREENING LEVEL EXCEEDANCE - (SEE TABLES 12-2 AND 12-16)1 U SEEP ■ SURFACE WATER POINT DITCH STREAM ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY �^ DUKE ENERGY PROGRESS MAYO PLANT SITE BOUNDARY Constituent Full Name Constituent Abbreviation Aluminum Al Arsenic As Barium Be Boron B Chromium Cr(Total) Cobalt Cc Iron Fe Manganese Mn Vanadium V Zinc Zn NOTES: 1 USEPA. SUPPLEMENTAL GUIDANCE TO RISKASSESSMENT GUIDANCE FOR SUPERFUND: REGION 4 BULLETINS ECOLOGICAL RISKASSESSMENT. ORIGINALLY PUBLISHED NOVEMBER 1995. WEB§TE VERSION LAST UPDATED 11/30/2001: (http://www.epa.gov/region4/su perfund/programs/riskassess/ecol bu l.htm I. ) 2 SITE AERIAL ORTHOPHOTOGRAPHY IS DATED APRIL 17, 2014. IT WAS OBTAINED FROM WSP. 3 ADDITIONAL OFFSITE AERIAL ORTHOPHOTOGRAPHY IS DATED 2013. IT WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS. (http://services.nconemap.gov/) 4 PARCEL BOUNDARY WAS OBTAINED FROM THE NC CENTER FOR GEOGRAPHIC INFORMATION AND ANALYSIS. (http://services.nconemap.gov/) 5 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM RIPS 3200 (NAD8312011). GRAPHIC SCALE 400 0 400 800 1,200 1,600 2,000 IN FEET ,�vj 4ft� DUKETerra ENERGY,- PROGRESS 148 RIVER STREET, SUITE 220 MAYO STEAM ELECTRIC POWER PLANT GREENVILLE, SC 29601 10660 BOSTON RD m 864-421-9999 ROXBORO, NORTH CAROLINA27574 www.synterracorp.com FIGURE 12-13 COPC LOCATIONS FLAGGED x$ SEDIMENT - ECOLOGICAL