HomeMy WebLinkAboutNC0038377_FIGURE 16-1-MAYO_20150902LEGEND
!� MW -1 PROPOSED GROUNDWATER MONITORING LOCATION
- ;•,,MW-15BR�
S PZ -1 PROPOSED MONITORING LOCATION (NOT SAMPLED)
CW -4 DUKE ENERGY PROGRESS MAYO PLANT
CW 3 MW -16S
MW -16D i 500 ft COMPLIANCE BOUNDARY
MW-03BR MW-16BR
MW-14BR WASTE BOUNDARY
M W-02 SOURCES:
{. 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE
MW-5BR CW -2D - SYSTEM FIPS 3200 (NAD 83).
a ®
2015 GROUNDWATER ASSESSMENT WELL AND BORING LOCATIONS WERE BASED ON SURVEY DATA
CW -2 DATED JULY 17, 2015 PROVIDED BY McKIM & CREED OF WILMINGTON, NORTH CAROLINA.
` +r CW -6
Iss
W -08S
MW -08D
ACTIVE ASH BASIN AMW-07D
AMW-07BR
v
MW -04 Q�^�
MW-13BR
MW-09BR
�. ABMW-01
ZMW-0213R�s
MW-02 ZMW-03SMW-03
t CW -1D
•CW-1
AN
df` ABMW-041�1."w4
ABMW-04D ��• z,
ABMW-04BR
oO��m " P - �' - • ' �,. - •" y?racy...-...r..
MW 106R
40
A�POWER PLANT
r.
_ s,4 BG -2
MW -11 BR
1
',�, �l �b� eLY^ � li -� l •'� . s4�4 1. 6: yJ4l- M ,- " ..
k•!,.'r SiY GRAPHIC SCALE
400 0 400 800
FIGURE 16-1
IN FEET PROPOSED GROUNDWATER MONITORING LOCATIONS
r` 148 RIVER STREET, SUITE 220 DUKE ENERGY PROGRESS
MW-12S� ry;,.• GREENVILLE,SOUTHCAROLINA29601
MW -12D PHONE 864-421-9999 MAYO STEAM ELECTRIC PLANT
r - r Terra www•synterracorp.com 10660 BOSTON R
DRAWN BY' C NEWELL DATE: 08/13/2015 ROXBORO, NORTH CAROLINA
PROJECT MANAGER J WYLIE
LAYOUT PROPOSED LOCATIONS
' - -I 08/30/2015 12.39 PM P:\Duke Energy Pro ress.1026 105. Mao Ash Basin GW Assessment Plan '\1.11 CSA Reportin Fi ures FIGURE 16 -1 -MAYO -PROP MONT LOCATIONSdw