Loading...
HomeMy WebLinkAbout20231195 Ver 1_USACE Permit_20231127U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2022-01670 County: Brunswick U.S.G.S. Quad: NC -Bolivia GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: DR Horton, INC Will Riddick Address: 6752 Parker Farm Road Wilmington, NC 28405 Telephone Number: 843-737-2904 E-mail: WHriddickAdrhorton.com Size (acres) 135.88 Nearest Town Boilin¢ Spring Lakes Nearest Waterway Lockwoods Folly River River Basin Lumber USGS HUC 03040208 Coordinates Latitude: 34.037097 Longitude:-78.208401 Location description: Off Old Ocean Highway 17 ( Business 17). Brunswick County parcel ID 1530001001 Description of projects area and activity: This verification authorizes the fill of 0.0209 acres of wetlands and 0.107 acres of open water impacts to iurisdictional ditches for the construction of a residential subdivision. Planned impacts are associated with road access, utilities, lot development and grading. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit 18 for impacts to 0.0209 acres of wetlands and Nationwide Permit 29 for impacts to 0.107 acres of open waters. SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached General and Special Conditions, your application signed and dated 8/25/2023, and the enclosed plans 9/26/2023. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC, at (910) 796-7215. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David Moose at (910) 251-4810or David.e.moose(&usace.army.mil. Digitally signed by David Moose David Moose Date: 2023.11.27 12:16:26 Corps Regulatory Official: Expiration Date of Verification: 3/15/2026 -05'00' Date: 11/27/2023 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.ariny.mil/cm_apex/D`p=136:4:0 Copy furnished via email: Timmons Groun, Emory Ouilliam, emory.guillian(atimmons.com NCDWR, Holley Snider, holley.sniderAdeg.nc.zov SAW-2022-01670 SPECIAL CONDITIONS a. Suitable habitat for tricolored bat (Perimyotis subflavus) may be present at the site. On September 14, 2022, the USFWS published a proposal in the Federal Register to list the tricolored bat as endangered under the Endangered Species Act (ESA). The permittee understands and agrees that all work associated with the clearing and removal of trees and removal, or modification of culverts must be completed prior to the effective date of the final listing in the Federal Register. Work associated with the aforementioned activities not completed by that time must cease and the permittee must contact the Corps' David Moose, David.e.moose@usace.army.mil to determine if additional coordination with the United States Fish and Wildlife Service is required under Section 7 of the Endangered Species Act prior to continuing work. Action ID Number: SAW-2022-01670 County: Brunswick Permittee: DR Horton, INC, Will Riddick Project Name: Old Ocean Hwy / Bolivia / Brunswick Date Verification Issued: 11/27/2023 Project Manager: David Moose Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David Moose Wilmington Regulatory Office U.S Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 or David.e.moose@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date HALL TRACT NOTES: 1. BOUNDARY INFORMATION TAKEN FROM ALTA/ACSM SURVEY BY GARY KEYES, P.L.S. DATED MAY 1, 2023. 2. TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY BY CAPE FEAR ENGINEERING MARCH 15, 2022. 3. A DELINEATION OF THE PROJECT AREA WAS COMPLETED BY SOUTHERN ENVIRONMENTAL GROUP (SEGI) ON JULY 12, 2022. THE DELINEATION WAS APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS (USACE) AND A PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) WAS ISSUED BY GARY H BEECHER ON OCTOBER 11, 2022. SAW-2022-01670. 3. THE SUBJECT PROPERTY IS LOCATED IN ZONE X AND AE IN ACCORDANCE WITH FIRM MAP NUMBERS 3720213000K & 3720214000K WITH AN EFFECTIVE DATE OF AUGUST 28, 2018. 4. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH BRUNSWICK COUNTY AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS. 5. OHWM MEASUREMENTS WERE TAKEN BY TIMMONS GROUP PERSONNEL ON SEPTEMBER 19, 2023 FOR RPW IMPACTS 4 AND 5. I Know what's below. 1 - Call before you dig. z D 00 W HALL TRACT ENVIRONMENTAL IMPACTS BRUNSWICK COUNTY, NORTH CAROLINA SITE old ocean -{Wy Ea ^ aua o �7 h� S hjLL' 14 111 „6 VICINITY MAP 1 if = 2, 000' SITE DATA TABLE: TOTAL AREA: 135.88 ACRES TOTAL WETLANDS: 74.63 ACRES TOTAL LINEAR FEET OF RPW: 1,199 LF Sheet List Table Sheet Number Sheet Title CWI-1.0 COVER SHEET CWI-1.1 EXISTING CONDITIONS CWI-1.2 OVERALL ENVIRONMENTAL IMPACT CWI-1.3 WETLAND IMPACTS 1 - 3 CWI-1.4 RELATIVELY PERMANENT WATERS IMPACT 4 CWI-1.5 RELATIVELY PERMANENT WATERS IMPACT 5 CWI-1.6 NOTES AND DETAILS �3 o^ �J M� 0 0 0 O •• z O i f 0 U 0 z 0 a 0 DATE 9/26/2023 DRAWN BY 331 DESIGNED BY 331 CHECKED BY 1. WALL SCALE r = 2000' a z UUw Q=w= =a �oLr) LU J > > J U O as U Q 59364 SHEET NO. CWI-1.0 l<35\__/ SCALE 1,_400 wo o 30 0 400' 800' 25� / -•�\-\ `� \_\ II �0=3 OLEGEND =\� / 0� 'ao i �3.� \ \FLOOD ZONE \ 2.5 - / /_- \\\ \\ \ 1/�� z PROPERTY LINE \\ :I ti _ \ _��25 ��/� p \�'//! I ��,rj—+/^\ \���-� \ //// ///�I14 RELATIVELY PERMANENT WATERS \ \ r J _ / \ ` I 1 / r/ eQo J r �}S °��OHP_��-� o - WETLANDS 1 1 \\ l \ '—�� ��11I. Ilo / 2.� J \ \\\�b c���sl - // �\ �O�/off �Q - / / 10 O _, \ ,moo o .p / / \ � _ � ` o I ! � / / �W.W -OWW \W •I ,r � /2- // �.o� 1 l � 1/O / O/ v o l` ` W'✓ : \ yV O /i. I/- 1 p \O o/ _ \`F3� \ g/d \ \ / J , r/ RELATIVELY o \ ! ` - Y l I l\ _ = o / - -\ _ , Q QWATERS J PERMANENT — \ - �/-— / \ \I \ \ 1 MANENTContractor willfollow the following q 20 \ W•YWry— arc construction sequence: W�W/Wry�Y '- _ — /^ /t / •nO� J W W \ / 0. / W W W W W W /\ \ / N r Y I//l I W W /O, J W W W W W W W \ %' ^ \ ` / / / 1 ��� �Oy \ I / /-CIA Contractor shall notifythe Brunswick \ ^ — 1,� , W ��\ d yWWWWWWWWWWWWWWWWWWW ,s < _ I III/� O "ATEO/ 9/26/2023 DRAWN BY 331 County Planning Department 48-hours�/6 //r l i\I JJy� o m �0�W W W W W W W W W W W \ \ -� \ W y W W W W W W W W W W W �/1 l W/ W W W W W W W W W W W W \ ,/� � OJ 5�Q / r� W W W W W W W W W W W W W in advance of start of work during a / — I -J I / J I J I /// //!/ , /�Q \, �nWWyYWWWWWWWWYyYWWWWWWWWyYyWWW \ \ \ J �r/�///J r6 / I�V'Y�•vWrW.YW�YW�YW�YWW y.YW.YW�YW�YW.vWvW.YW \ period of time with no rain in the 1 _ /, f \o, \ / . ` \ \ 1 ! W \ \.W W W W W W W W W W W W W W W W I • DESIGNED BY 331 ° \ I / III \\ ( O\O #•W W W W W W W W W W W W W W W W / / \ ) W W W W W W W W W W W W W W W / forecast. I I � —\/ / ! J 1 � `/-- \ 7 \• �, W� W W W W W W W W W W W W W W \ / /^ 2OW.� W W W W W W W W W W W W W W \ ! I • Prior to start of work, contractor shall I \ \ \ \ ` \ \ I ' / / l / — \ I- I II \ ���� �II W WWW W\WWWWWWWWWWWWWWWWWWWWWWWWWWW \ \ !� 1 I— / ^ \ �/ V r l // �` W •Y W W W W •Y •Y W W W W •Y W W W W •Y N I \� 1 \ \ � rAG, �\��/.}�\j W \\ spy\ — JCW •Y •Y\W�yW W •Y W W W W •Y •Y W W W W •Y W /\\ have / J/ �/ WWWWWWWWWWWWWWWWWWWWWWWWWW !�O/ • • • • CHECKED BY J. WALL SCALE 1 I yWyWWWW/WWWW all materials and equipment { \ `///''/ y l /� "V \ J \ / \ / 1,'\ �j ` /`y� " \ I �r( O�L� 1 I J y W Y W�W S/ \ �1. W W W W W W W W W W W W /I I\ l ✓/i W W W WW W W '' \/\' �X • 1" 400' on -site. For utility crossings with _ / r _/ WW l /A� —V W W W W W W W W W W W W W W W W W W W W W \ \ �/ / / • L , J\ I J r uyWJy� I I✓ • W W•WY W W 7O Ocasings, the carrier pipe shall be , V1- WWWWWY W� WW/'''WWWWWVly{i II\ \W IIII JWW/ WWWWWWO WWWWWWO \O / �y( //'W / 6 1W.WWVp WWWWW' WWWWWW W WWiiiW((( WW ✓,,, yW WWWW WWWW \\ �r/y,Y W/WWyWW/W \installed WW•Y WiW WryWWW ylWWW WW WWWWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWY WWWW W�WWWW WWWW WOWW W�WWWY WWWWW' WWW WWW WWW WWW WWW WWW WWW WWW �WW1WWW r.�\/ // /Q WI,� WI y� \ IO /\/^I within the casing pipe prior to WY1 , 5JI)C,.I ° •Y —\ \ W / .�[\�I� p Ow`1any open cut activities. \/b WW WW W�V Y \// I / \ 1J)v/I1/O661001 �WY WWW WW WW 1�iy p-- � �W„V\\^\OO I� am Wre/`e� WJWWIWI©> WI�I1.{W�\II WW O—`Contractor shall install a temporary • WW J'W ///444W •l(WYl•W W W%I /`�/ •/]Y/// I/r// JJ 1 I W\ O I// W W .OrJ W W W W W W Y W W W W W W W W W W W W W W W W W WW / W1/1J// II coffer dam on the upstream side of the , / \ `{_ { �� ° WW-w W�yWWWWWW W y/ W WW %\ T\ / �W yWW WW \ YWWWWWWWWWIWWWWWWWWWWWry WWWWWWWyYyWWWWWWWWYyYWWWWWWW�yYyNWWY W r /\ / ^O / W •V�Y W •Y W W W W W v_ �/�yy J �O ///WQ'J W W •Y W W W� �� •Y W W W •Y W W W W •Y •Y� W W W •Y W W W W •Y •Y W W W W •Y •✓W W / / \ �} II� �W proposed crossing and pump water ,/�` / / W7�W/YVVWWrYW /W yW W WWWW\JCWW W W WWWWWWWWWWWWWWWW W W W W yW y WWW \v — _ I / .0 W W W W`Wy N W •Y •Y^V ! W W W W W W W W W W •Y W`� W W •Y W W W W W W W W W W W W W W W W W W W W I Wy'W' •Y W W W \ / / /^ \\\ \q \( / W W W W TW W W W W;O `\\\O I WWWWWWWWWWWWWWWWWWWWW�WW(JYWWWWWWWWWWWWWWWWWW�WWWWWWWWWWWWWWWWWWWWWWWWW3 WWWWWWWWW W W W W W W W W W W. K around the open cut area to the r ` W W W W W W W W W W O /� W W W W W W W W W W W J1( W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W !]o��l W W W W W W W W W W W W-•1Y W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W \ W W W W W W W W W W v W W W W W W W W W WOY W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W downstream side. 1 O /i9 n \\ N W W W W •Y W W W W / W W W W •Y •Y W WW N W W W W •Y •Y W W W W •Y W /Y W W •Y •Y W W W W •Y W W W W •Y •Y W W W W • Contractor shall place the culvert or \ / I //n. .O °\Q \\ y� Y W W ��W��� \ Yw W W�W�ry ry 00j Q W�NYy�W�W�Y�W YYYW�W�W�W�YYY� /�W�W�W YYYW�W�W�W�YYY�W�W�W�W YYYN�W�W�W YYY \ \_' / \ W W W W W W W W W W �/ !� W W W W W W W W W �/Y W W W W W W W W W W W W W W W W W W W W W W W \ \ _/ \ 1 /l� �.\\\ W W W W W W W W W W W \�_\ \ W W W W W W WY W, Y W y W W W W W W W W W W W W W W W W W W W W W Q Z WETLANDS utility casing with carrier pipe at _ 6 /— �_ , W W W W W W W W W W W W W\ A/\1W W® W W W W W WW W W4/µW W W W W W W W W W W W W W W W W W W W W W \ `, I !J- O/ \/ I `.r WWWWWWWWWWWWWWWWWWWWWWWWWWI•W W�WWWWWWWWWWWWWW�4V(WW W W W W W W W WYWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW \ Z / elevations shown on the approved , \ j(Yn ° !( I W W W W W W W W W W W W W W�W O W W W W W W W W W >Y W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W \ \ O O O \ J, \! l/ I W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W Or \ O I W W W W W W W W W W W W�yY W W W W W W W W W W W�W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W I° �\ W W W W W W W W W W �Y Y W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W N W W W W W W plans and backfill in accordance with I Q/ O� 0 a�(Y��_C(jZ/ W W W W N Y W W✓Q�JJW N W W W W Y Y W W W W W W W W Y Y W W W W� W W W W Y W W W W W N W W W W Y Y W W W W Y N W ` Q � ) U v = O h-1 I — t~ {J ` I WWWWWWYWYWW WWWWWWWWWWyyWWW F Q O� g�/ _�O — W// I�WVW(W`YW`Yyy#y'!W/'y`Y WW`YWYyi'W`YW`YW`YW`YWYy`YW`YW`YWW/YWWWWWWWWWWWWWWWWWWWWW/WWWWWWWWWWWWyW / _/ Brunswick County specifications. �� /\ W 1 W WVL W W W W W W W W W W W W W W�V W WWW W�WWWWWWW _ — / W W W W I✓`K \`\ O Z Z O /{y /W�V�W W W\Y iIWW WWC• WWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWW • Contractor shall restore channel and �% �° f / I WWW YWWWWWWWWWWWW3W W W W W W W W W W W W W W W W W W W W W W W W W W — W W W W W I .O v U W W W W�.Y I W W W W W W W W W W W W W W W W W W W W W W W W W W W W W \ W W W stabilize any disturbance within O_ O ° 0U � 1) O24-hours of start of work. O WWWWWWWWWWWWWWWWWW O _—O/OO O O • Contractor shall restore wetland areas °/° 01 ° W WW WWWWWWWWW O�° f'/ W O with temporary impact or permanent O O CL N[O U�VZY� X \ / — O y° wO\ conversion to impact to O pre -construction contours, and plant an WWW�WWWWWWWWWWWWWWW \I ! \(\ 1 IC\J\ O WWWWWWWWWWWWWWWWWWWW O ° O / \ \ / W W W W W W W W W W W W W W W W appropriate wetland or riparian seed \ / / \ =\\ / ° ° I W W W W W W W W W W W W W W W o ° _III IOO — ) I WWWWWWWWWWWWWWWWWWWWWW .� ..O_.I 3mix. ° O ° �1 J W SITE DATA TABLE: \ ° I °° ° ° / / \ °TOTAL AREA- 135.88 ACRES o / 1\ \\ % \`'' / ►I i ^ e °\ I o o ° �-°TOTAL WETLANDS: 74.63 ACRES d o °\Q o ° I TOTAL LINEAR FEET OF RPW: 1,199 LF ° ° °o ° E5Z64 SCALE 1 "=200' 0 200' 400' Z LEGEND FLOOD ZONE PROPERTY LINE RELATIVELY PERMANENT WATERS WETLANDS WETLAND & RPW IMPACT LEGEND: PERMANENT WETLANDS - LIGHT GREEN RM PERMANENT RPW IMPACT - RED Contractor will follow the following construction sequence: Contractor shall notify the Brunswick County Planning Department 48-hours in advance of start of work during a period of time with no rain in the forecast. • Prior to start of work, contractor shall have all materials and equipment on -site. For utility crossings with casings, the carrier pipe shall be installed within the casing pipe prior to any open cut activities. • Contractor shall install a temporary coffer dam on the upstream side of the r proposed crossing and pump water around the open cut area to the s_ downstream side. Contractor shall place the culvert or rutility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Brunswick County specifications. h 0 Contractor shall restore channel and y stabilize any disturbance within N 24-hours of start of work. • Contractor shall restore wetland areas with temporary impact or permanent conversion to impact to pre -construction contours, and plant an Lappropriate wetland or riparian seed mix. `n SITE DATA TABLE: TOTAL AREA: 135.88 ACRES TOTAL WETLANDS: 74.63 ACRES n TOTAL LINEAR FEET OF RPW: 1,199 LF n h h ri \ �� 6 "♦ 7 r 36 a \ 10 , j •,�'/� 135 �y PP i m o '-� - - 2 � E LL E \ \ 14 „cs�" / i� 134 \ 0 E 3 v RELATIVELY 5 %'%ram 131 ,32 83 a _ -� \ PERMANENT z� 4 WATER IMPACT 5 z8 l 0 3 ° 3 0 20 21 -'/ — WETLAND w U z2 1 w 12, I M PACT 3 v 0 1o i 84 j32 � tl O14 1 i w 85 \V �s � � � tz6 � WWW W O zb z �'� 35 �I 0 O 0 24 Itl u , 0 I I I 125 �Y O 0 O W s I 36 a 23 - 1 57 O o III' 12 O °°0 4 z 87 z8 �9 30 37 Ix �� ° 0 ° o 1�3 w 1 $z 38 O � 00 O O OO O 0 0 J�+��' uz �Y y O J� W l�� tl, O O m tl 8 68 �V®\ � — MI 54 39 �I, 1 �4 � 0 O O 0 ��� 1 DATE 89 Itl 121 0 I 0 V 0 0 1r 9/26/2023 53 69 1 40 I II O ° O O ° 0 O 0 ° � � * DRAWN BY II 80 I tl � II 0 O W W 0 0 O O W W 331 90 II ,zo o � -�• o 0 0 o y � y �V 4, O DESIGNED BY RELATIVELY 7° �% 52 tl o �' WETLAND o ° ° ,�, ,�,�,�,�,�,�,�, • 331 PERMANENT vt 42 "9 ° ` IMPACT ° ° %k V' `V • CHECKED BY any � _ 51 �' 2a & 2b ° .� .� .i• .� .� • WATER IMPACT4 ,=- _ 1„ I •� o .� .� %Y y • WALL II ql 'o Qv -� SCALE 77 7z %]. II 66 65 64 50 43 IM O O ° 1" - 200' 93 I III 151a II 111 y ,tl II „g �0 0 0 0 0 °0 0 O 0 0 0 O 73 1ppp �It��, � 49 1� 44 u ° o 6 o • 76 I�R� II � �' 94 62 - II O 0 V %k 0 �Y %k �V � 74 I 117 `10 � � � O O ' I, ° t %k° 75 46 45 W W W W W I — 95 II 59 58 II 48 47 II „6 0 O �� ��%k %k 1k II 6, 60 II� �. r 00 W + %k gg 99 10 101 11 _ _-� 7 . • �� '��_ — r� W 114 y y y U 5 103,04 105 , ° Z o ,oz 107 113 O I WW WWWWWWWWWWWWW 0 J 0 �_... . 1 a Q a o� — /. PVC �• .v .� .v .v .� .v �WETLAND 0 �v���aP 0•9 0 0° o° O o /,D8 11� 1E4.88' 8„PVC •� y .V y .V U z IMPACT`I 0 o ° `' lE 4.77' �' �' �' �' �' Q o w �Y W *Y � Sk O * W O ,o9 ,, �V �V �Y �V �Y �Y z a HALL TRACT J U > 3a J U > ~ Y vC Q�+zoC WETLAND IMPACTS = N w 2 z MAP SHEET IMPACT NUMBER IMPACT SPECIFICATION WETLAND IMPACT PERMANENT (SF) (AC) RELATIVLEY PERMANENT WATERS IMPACT (LF) (SF) (AC) CWI-1.3 1 PROPOSED SITE GRADING 229.61 0.0053 - - - CWI-1.3 2A PROPOSED LOT & SITEGRADING 576.49 0.0132 - - - CWI-1.3 213 PROPOSED SITE GRADING 68.33 0.0016 - - - CWI-1.3 3 PROPOSED SITE GRAD] NG 37.88 0.0009 - - - CWI-1.4 4 PROPOSED ROADWAY, LOT, & SITE GRADING - - 538.11 2,079.12 0.0477 CWI-1.5 5 PROPOSED ROADWAY, LOT, & SITE GRADING - - 423.74 2,583.57 0.0593 TOTAL 912.31 0.0209 r961.85 4,662.69 0.1070 zJ a� Z [O Q E 5 L>L LU 01 O O 0, �a EE °3 Et JOB NO 59364 SHEET NO. _ CWI-1.2 SCALE 1"=50' WETLAND IMPACT 1 WETLAND I M PACT 2o �o 0 50' 100' 16 119 O o < E U o LL E a Of 3 Z �-16-- 15 149— S -- WETLAND IMPACT .0 3 4� E-� LEGEND co - �1�$ _ o \ I PERMANENT FOR PROPOSED SITE o 3 o s o a a FLOOD ZONE 0 `1' GRADING m — — PROPERTY LINE ` i o �(68.33 SF/0.0016 AC) o WETLANDS 13_ 12 0 ® \ O o 0 0 I 0 0 0 0 0 0 0 0 WETLAND & RPW IMPACT LEGEND: 0 0 \ ® �� G WETLAND IMPACT 2A PERMANENT FOR o 10 ® PERMANENT WETLANDS -LIGHT GREEN WETLAND IMPACT 1 0 0 ® 13 PROPOSED LOT AND o PERMANENT RPW IMPACT - RED PERMANENTFOR ° 0 0 ® ® 13 ; — SITE GRADING w Contractor will follow the following PROPOSED SITE o \ I /° 0 0 14 16 (576.49 SF/0.0132 AC) a 10 a construction sequence: GRADING (229.61 SF/0.0053 AC) ° `1 0 ° ° ° ° O 17 118 I N, 0 0 O o K 0 DATE 912612023 I° �o O DRAWN BY 331 ,�, ° • Contractor shall notify the Brunswick 0 ICCJ o o ` o \ ° o County Planning Department 48-hours in during 0 0 o ` � , 4 o I �� ° DESIGNED BY advance of start of work a o \ o _ _ �, o •� 331 period of time with no rain in the forecast. ° d I ° o o_ I �' 0 o` 1, 0 D BY 3. wA« ° \ mil/ �V o �J/ o �V o • cA50 • Prior to start of work, contractor shall • have all materials and equipment • on -site. For utility crossings with casings, the carrier pipe shall be installed within the casing pipe prior to WETLAND IMPACT 3 0. any open cut activities. • Contractor shall install a temporary dam '3D coffer on the upstream side of the proposed crossing and pump water /- '- ; ti� \ around the open cut area to the �'�� 18 / > /`LX O downstream side. • Contractor shall place the culvert or 0 ,�9'18 1 2 /,�'� WETLAND IMPACT 3 utility casing with carrier pipe at �� ,��� C" / PERMANENT FOR PROPOSED SITE a U U U) elevations shown on the approved II ^ = I - plans and backfill in accordance with GRADING o a Brunswick County specifications. 6„ (37.88 SF/0.0009 AC) • Contractor shall restore channel and '00 �LQ o 0 stabilize any disturbance within �^ Q Q 24-hours of start of work. 129 •-� = N • Contractor shall restore wetland areas o, Z ''' with temporary impact or permanent conversion to impact to O pre -construction contours, and plant an I appropriate wetland or riparian seed mix. r `Zn c911 I SITE DATA TABLE: 1.4 0 166 TOTAL AREA: 135.88 ACRES TOTAL WETLANDS: 74.63 ACRES JOB NO, 59364 TOTAL LINEAR FEET OF RPW: 1,199 LF SHEET NO. CWI-1.3 RELATIVELY PERMANENT WATERS IMPACT 4N SCALE1"-6o' 0 60' 120' �0 Q U W Z E o LL� E LL _ 2 I O � OO i ` Z 3 .0 3 3 H a 69 I' z '�' LEGEND Z i .Z. o FLOOD ZONE I co, ~ o z w 0 — — PROPERTY LINE o RELATIVELY PERMANENT WATERS I II I 14 w E, �L L WETLANDS 70 7. o RPW IMPACT LEGEND: 10 1. PERMANENT RPW IMPACT - RED II 18=19 i� III 6 w 11 Contractor will follow the following RELATIVELY PERMANENT WATERS IMPACT 4-17�16 PERMANENT FOR PROPOSED oIIIII a DATE construction sequence: _ ROADWAY,LOT, & SITE GRADING 181� o 9/26/2023 • Contractor shall notify the Brunswick (538.11 LF / 2,079.12 SF / 0.0477 AC) I DRAWN BY County Planning Department 48-hours i I` ►h I I 64 , � • 331 DESIGNED BY in advance of start of work during a , �, CO65 I 331 period of time with no rain in the 7z r QD I r I 66 �� ,f, • •CHECKED BY forecast. 67 I I • • J. WALL SCALE • Prior to start of work, contractor shall _ — 19 • have all materials and equipment I� II ni • on -site. For utility crossings with LO 18 d 1 19 _ • casings, the carrier pipe shall be 73 IIJ installed within the casing pipe prior to _ ri any open cut activities. • Contractor shall install a temporary �- I �I 62 ` coffer dam on the upstream side of the 3 proposed crossing and pump water around the open cut area to the 74 �� _ 18� r downstream side. a. co 6� a • Contractor shall place the culvert or -� : 150 14-14-15—co Z LU utility casing with carrier pipe at elevations shown on the approved -- 15 co II I II a Q Be plans and backfill in accordance with V � 5$Be z Brunswick County specifications. • Contractor shall restore channel and stabilize any disturbance within 5 �, 6D 9 co ~ Z J o Q LU a 24-hours of start of work. • Contractor shall restore wetland areas ,D, ,DD _18 to = z a } with temporary impact or permanent _16=-15 d 47 LU conversion to impact to I 76+ �14 O pre -construction contours, and plant an __- ---- 16�15 J appropriate wetland or riparian seed „"� LU mix. 12=" 13_14_15 � �17 -� Ste` IF 14_15=16 SITE DATA TABLE: _ = l O ACRES 35 88 AREA- RE TOTAL 1 A - 14 I �5 TOTAL WETLANDS: 74.63 ACRES1413 � .12.11� 7 16 15 D6 �� 1 �1^141`A0 _- - _ -- TOTAL LINEAR FEET OF RPW: 1,199 LF 18 � � 59364 � �- SHEET NO. CWI-1.4 RELATIVELY PERMANENT WATERS IMPACT 5o "y �0 <Wz 0 LL O \ \ a C 3 Z 'D3 p3 i191g/ 6 z�-� a�-� s z 0 > wJ w 1 � \ 2p?RELATIVELY o 14 w �22�21�20 PERMANENT WATERS IMPACT 5 PERMANENT FOR PROPOSED �2p�21 \ 0 ROADWAY,LOT, & SITE GRADING - �1g�1g� / o (423.74 LF / 2,583.57 SF / 0.0593 AC) �� i/- �� / ` Q 0 DATE 13 QQ/ V C' 9/26/2023 _ 14 ��1 V� \ / �\ `� /� g/1��1� 1 /`� DRAWN BY 331 • DESIGNED BY CHECKED BY J. WALL / - / ' 11 A �ll- \ • SCALE 1"=60' \ 16 S \� • • 17 00 UD / ^r. I 29 18 \ !` • �/ ;/�,L 212p1g1g18,1g.20'.21 N �8 I CL 2 00 U) ~ Q a 14 1g �' / / 22? 33 r' �°' �°° I 19 a UUQ w Contractor will follow the following construction sequence: o • Contractor shall notify the Brunswick County Planning Department 48-hours in J Z o w z a advance o start o work duringa period o time with no rain in the forecast. LEGEND SITE DATA TABLE: J Q � LU • Prior to start o work, contractor shall have all materials and equipment on -site. For utility crossings with casings, the carrier pipe shall be installed within the FLOOD ZONE TOTAL AREA: 135.88 ACRES = z a casing pipe prior to any open cut activities. — — PROPERTY LINE TOTAL WETLANDS: 74.63 ACRES m J w • Contractor shall install a temporary coffer dam on the upstream side of the RELATIVELY PERMANENT WATERS TOTAL LINEAR FEET OF RPW: 1,199 LF > proposed crossing and pump water around the open cut area to the downstream 0 Q side. WETLANDS w • Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Brunswick County WETLAND & RPW IMPACT LEGEND: specifications. PERMANENT WETLANDS - LIGHT GREEN • Contractor shall restore channel and stabilize any disturbance within 24-hours of PERMANENT RPW IMPACT - RED SCALE 1 "=60' start of work. NOR • Contractor shall restore wetland areas with temporary impact or permanent 0 60' 120' conversion to impact to pre -construction contours, and plant an appropriate . 101 NO, 0 wetland or riparian seed mix. z 59364 SHEET NO. CW1-1.5 Table 6.10a Table 6.10a Temporary Seeding Specifications for Summer p rY 9 p Table 6.10a Temporary Seeding Specifications for Fall L, Temporary Seeding Specifications Seeding Mixture Spedes Rate (lb/acre) o 2 o E for Winter and Early Spring Seeding Mixture Spedes Rate (lb/acre) Rye Grain 30 DID¢ o = 3 German Millet 15 w z € a Seeding Mixture Spedes Rate (lb/acre) In the Piedmont and Mountains, a small -stemmed sundangrass may d 3 3 Rye Grain 30 In the Piedmont and Mountains, a small -stemmed sundangrass may be substituted at a rate of 501b/acre. Z LD be substituted at a rate of 50lb/acre. 3 s Seeding Dates o g 3 o Seeding Dates Seeding Dates C) o Mountains 15-Aug to 15-Dec = 5 Mountains >2500 ft. 15-Feb to 15-May Mountains 15-May to 15-Aug Coastal Plain and 15-Aug to 30-Dec a w <2500 ft. 1-Feb to 1-May Piedmont 1-Ma to 15-Au Y 9 Piedmont Z Piedmont 1-Jan to 1-May Coastal Plain 15-Apr to 15-Aug Coastal Plain 1-Dec to 15-Apr Soil Amendments w Soil Amendments Follow recommendations of soil tests or apply 2 ton/acre ground Soil Amendments Follow recommendations of soil tests or apply 2 ton/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer Li Follow recommendations of soil tests or apply 2 ton/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer Mulch o agricultural limestone and 750 lb/acre 10-10-10 fertilizer Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, s Mulch Mulch netting or a mulch anchoring tool. Use 400 gallons of tack per acre 0 Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, or straw covered with pinned netting. netting or a mulch anchoring tool. Use 400 gallons of tack per acre netting or a mulch anchoring tool. Use 400 gallons of tack per acre or straw covered with pinned netting. Maintenance w or straw covered with pinned netting. Repair and refertilize damaged areas immediately. Topdress with < Maintenance Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and 50lb/acre of nitrogen in March. If it is necessary to extent o o Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or damage. temporary cover beyond June 15, overseed with 50lb/acre Kobe > DATE mulch immediately following erosion or damage. (Piedmont and Coastal Plain) 0 9/26/2023 late February or early March DRAWN BY 331 PERMANENT SEED MIX ERNST CONSERVATION SEEDS NC COASTAL PLAIN FACW MIX OR APPROVED EQUAL BY DESIGNED BY DESIGNER APPLICATION RATE 20 LBS/AC. TO BE PLANTED IN ALL DISTURBED WETLAND AND RIPARIAN AREAS. 331 PLASTIC NETTING SHOULD NOT BE USED WITHIN WETLANDS OR STREAMS. •• CHECKED BY J. WALL • • SCALE TEMPORARY SEEDING SPECIFICATIONS NONE • SCALE: NOT TO SCALE • • Shrub (recommended) Pawpaw O Alder Blackberry APPROVED SEDIMENT FILTERING DEVICE Elderberry Z (SEDIMENT FILTER BAG). PROVIDE uorvc BOTTOM OF POSITIVE DRAINAGE FROM SEDIMENT STREAM DIVERSION PUMP DISCHARGE HOSES Herb recommended (recommended) Livestakes (re —ended) Black Willow n K FILTER BAG TO STREAM. DISCHARGE ONTO STABLE RIPRAP PAD TO PREVENT P INTAKE HOSE DEWATERING PUMP P awKEnSµAaa Iuc� �\ I p' \\gig `�� I `#' / J I `� Nodding sedge Boneset Wool Grass Jewelweed Silky Dogwood ( \ U `J = ~ J I --I SCOUR HOLE / STRFJ B_ K ��' I =-CREEK HOISCIEN CREEK ARE Z ".0 CONSIDERED .—R sTREATnC—INOS PLANTING SCHEDULE PSTURB FOR MAJOR `R el STREAM BANK l RESTORATIONS � W 0 FLOWS- -d INTAKE ^CLEAN ccccccggqqqq `� *NOTE: *NOT / D i ..:,mroI EAR:e� J O J U Q FLOW- SEDIMENT WATER DIKE HOSE DIKE SUMP -HOLE FOR POOL TO 18' DEEP, 2-FT DIAMETER) ° FOR PPELIEP TOING BEC'' y, PEED TWp COiR III \\�\ Y _ _ _ (12' RE-ESIABL6HED IN THREE ROAR >Lrv>aTuas T MAT \ \ \ /\\\ N wrTOP OF STAREsouARE_.\ seuD scnass=L% KORWRAs1 mP.r /III � •'AeovETHEcaourvo.REMovEERIERPRLRE FROM LLIORK AREA LENGTH NOT TO E%GEED THAT I CANBECOMPLETED IN ONE DAYpEO1°il2To EDEO—) „PUMP GDWHICH PUMP AROUND SEQUENCE PUMP N1TH SUCRON AND DISCHARGE HOSE. STARES (s°C) � CHER—ERTOPL2. sTAxEs 9-F"14 INSTALL UP -STREAM SANDBAG DAM. 3. DOWN SANDBAG DAM.saU a MIL POLYETHYLENE aTM FILM INSTALL -STREAM 4. THE PUMP MUSTRUN CONRNUOUSLY WHILE WORKING IN THE STREAM. STREAMBANKS MUST BESTABILIZED AT THE END OF EACH DAY. NnTEe. I�o EiER MPACT6. �J/ Bp UL BL+sAu AT EDCDUPLINGS (TYP.) I�Urv�1Q OR 6" PIPING PPE AND FIMNGS TO BE SIZED ACCORDINGLY. 2. PACE PALLETS AND POLYETHYLENE FILM IN STREAMBED DOWNSTREAM OF CONSTRUCTION ACT- 1. SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW ) 3. TEMPORARILY ANCHOR PALLETS AND POLYETHYLENE FILM WITH RIP RAP. SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. FROM PUMP 4. SLOW DISCHARGE TO 2 FPS THROUGH EACH PIPE. 6. ADD POLYETHYLENE FILM OVER OR UNDER PALLETS. 6. s0• BENDS CAN BE TURNED OUTWARD WITH A URGER 2. WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER LIVE STAKING (MULTIPLE ROW) S FOR ADDITIONAL ENERGY FOOTPRINT OF PALLETDISSIPATION. APPROVED DEVICE. THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE SPACING DETAIL FOR MAJOR REINFORCED SOIL LIFT DETAIL FOR MAJOR STREAM BANK RESTORATIONS ). REMOVE COMmETELY PRIOR TO RETURNING FLOW TO STREAM. DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAMBANK. STREAM BANK RESTORATIONS NOT TO sCAUE NOT To PDAIE TEMPORARY STREAM BYPASS PUMP - TEMPORARY PUMP AROUND DISCHARGE ENERGY DISSIPATOR NO, E 0 9 59364 SHEET NO. CWI-1.6 ` / I J I / 1 1 \ \ \ HALL ANDPEW J \ (D. B. 04310, PG. 0758) \ ` \ \ \ \ (P. B. 0017, PG. 0028) \ (PIN 213002965963) \ \ (Zoning CO-R-7500) � \ � DITCH 74 (TO BE LINED WITH NAG C350) \ PROPOSED SWALE SHALL _ ` NOT BE ALTERED OR FILLED - \ \\ AFTER CONSTRUCTION \ V \I \\ CONTRACTOR SHALL ENSURE / POSITIVE DRAINAGE FROM EXISTING z I I SWALE TO PROPOSED SWALE / 22 \\ / / 3 ITCH 7.2 (T E LINED WITH N C350) 8 I /0 21 DRAINAG� /`\l -j- EASEMENT 1-3 -PAD / 7 -28-- - -27- ' / 1 20'DRAINAGE / / __27-----/' -26--- EASEMENT 00 Q PAD / / ,23- �25.88' \ I M 1 26\ / ' \ 1 o C) 5 / / co SWL Z -27- \ PAD / I / 25.50' 21.78' ' / / / / - / \ I w N E \ / , / , SCALE 1 =40 = z o z 2� r' 2 / J / / \ I I I I 1 J �- z c w I \ I �- W O O 24.D75' 18' DRAINA / / / / / / \\ \ 1 1 1 / 0 40' 80' o M (D O z z 2 i \ �� 3 EASEMEN \ 29.`13' 25 \ �1 _\ �\ \ \\ \\ \ / / / / / / a U. � z � Z z ��2 \ PAD /23 2 , \ 1 `\ \ \ \ GRADING & DRAINAGE LEGEND w z � � o Lu o 0 ITC 7.3\ 23.75' \ �S /' sN / 1 \ //-2 \\ �O� 4 \ / 22 \ .PAD �, c'w WARD JOI-IN D AND / 23.00' w 7 C 3 \ R1 25 I \ ► \ \ WARD BETTY 5 5 3' OF \ ITCH 7.5 / 2 2� f3WL I ` I \ (D.B. 03345, PG. 0293) - - \ 1 RCP / / 22.62' / / (P. B. 0066, PG. 0068) (PIN 214001067610) 23 / / I / \ *PAD SWL 22.50' @ 2% 19.75' I I (Zoning CO-R-7500) - \ PAD �, INV OU = 1 6 21 /- �/ 23 15' DRAINAGd ` _20 \ \ \ �21.75' �`' \ - - 0 �/ // 25 SWL N EASITMENT 7 \ \ , 25 SWL 21.42' PAD SWL NCDOT END SECTION, TYP. �/ / 1` 21.1 25.03' j 18.05' SEE DETAIL ON SHEET C8.0. V U 0 + U J J o z � > 0 O z g z o � zz? g QO O � O w w Y Y Y OM � U) U - 55w5 O' cn cn > cn w z z O z U 139� 139� a z ocococa� m m a m Uj www0w a a a F_ a U) Lf) U) U) U) p z z z z z 00000 ' rN L ` 10 \ \ 1$�1y- -22/ CD 22.04' / �iN EASEMENT / / \ 1 I I > w o 0 0 0 - _ - PAD / / I R = Q N N - -_ � \�9.89' \ PAD 18' ARAINAGE // 1� �. ,_.�SWL �� SWL 135 -24.79' / / / I I P 1 c� o � ° N re) � \ N 21.05' - �. LEGEND 21.75' EAS MENT 19 1S / , j S 62\ / ��/ 20.33' / / / I I I - _ _ 1 Q i 00 00 00 A SWL 20 i� 2 �p 2 IN. r PAD 16.86'- sw�' / 10� `LO 2 5'X12� �` �P.�� �`EIP� SWL \ PAD - 1 12 22.00' \ / 46. 2' 22.5� 19 1� CLASS �n `� �_ _%I\N 2 20.15' I I \ VELOC - _/ / ■ \ \/ I\I I I`` \ y// /j / //rL�/ / /1$ 0 \ �118 -PAD 30DISSIOR /92 / SWL��' � \SwL �23220 22Z\`1 P3EE PAD 22-25' P9L•443' \ \ 2.90' s 134 1 III \ I\I I - - - - �- / / SWL DITCH 7.7 SWL DA 7 C 1 0PAD 19.33' / SWL 19 • ,� 1g / / 2p 1g ^'� .' OF / 23.32' / 19.53' 5938I PAD 36" RCP / PAD I �24.07' z O DATE Ck� 612012023 O DRAWN BY r 331 DESIGNED BY • • 331 • CHECKED BY N0.30 /o \ 23.71' I / V IN = 15.78 �� 133 \ 0,\ / I I I P I� I 1 / / l • J. WALL SWL 132 � , / I I / 1 / / / _ - - g N INV OUT = 15.61 �j N \ 0`1' _ _ - I I - NOTE: CONTRACTOR SHALL PROVIDE SWL ` 0 15 85 j 18'x9'x18" �, /0`5 I / / l / I I I I �' " POSITIVE DRAINAGE INTO AND OUT OF • SCALE 1 7 5 - 6'x5'x12" I17.14' I CLASS B \ \ / / I I , / / / I I ' ALL PROPOSED END SECTIONS. • 1 "=40' 2 ti 21 SWL CLASS A , VELOCITY- 17.10' VELOCITY 129 DISSIPATOR / \ l DISSIPATO SWL �` \ \ i / / / / • 128 PAD 15.72' p 1 � �,L 21�2p 1 j a 1� 1g 2 2 _ _ - I 21.40' 2% 2 *PAD DITCH 7.8 (TO BE LINED WITH NAG C350) 2-22 _ 171a CV rn \ I I, 21.21' 22 i 61.6 � R P Z 6'x5 12" I SWL CLA SA ,- INV IN 00 00 017. 5 N V OCITY '\ -s= .11 / // SWL DI SIPATOR `L \ // / / INV OUT 16.8 on S�GL / I \ \ 1 \ / \ / _ / / \� / I / / / LL 18.10' 19-15.53' \I/ \ i / / O I. DIT 6.0 ti 10 n 1 \ 18 ` _ / / / / / i �1 i i_ i SWL � � 33 I ' oo / o i 1Q 15.49' M \y \ - _ - - - -/ I �\ `f ` �I J/ / / / / - J/� �,/ /l // / / / / / / - -' / ` _ ( / 19 PAD 21. SWL \\ _/\---_ <i' o W • 15.38' \ 1 / / / / I l / / / / / cL� / / / / / / \ o W (n DA64CdT2 -15127 ' I I I _ \ _\lI/ PAD _\1 �1\\ I/ \°°_ `\ o- o •��/ / 0/Lz-n164 20.61' I o 0 -I L.L QZQ�~C clq z�Qn 54.58' O F o 0 d° 18" RCP 00 001 oF DITCH 6.1 @0.36% \y 0 0 SWL INV IN=16.13 co <\ L32 0 0o 18.52T /o J Q ° °PAD SWL -21 EASEMENT ' I 1 1 \ II I / I o 22.64'-// II I \\ UW l ` I 0 / 20 L 126 PAD 16.9'0 I PROPOSED SWALE SHALL \0 I° f) Q_ (D 21.21' ^`5NOT BE ALTERED OR FILLED o(0 4,PAD AFTER CONSTRUCTION 6 o°l /w 0 zclq 35 0 \ 21.21'N 00 00 U ° N* �N I SWL ' / / / / I �` J `\ \ \ _ _ - - - - - - - - - _ -0 0 2° // / ° o /A \ I / \I/ \I/ II\I/ \ _____ - / /� \\ // / / / // Q Z) C) 2 �, - - \ 17.24' rn S4 �' / \Y \Y \\� / / \Y I \-_--- - ° ''` / ^� _ 0 / / 1/ zo N DITCH6.4 N� \ / / / / // fI ���� ___------ °\-� ----/ / /0 // / i--i U 0 _ _N DITCH 6.2 0 125 PAD I / / - - _ _ ° / 0 0 / , /� J z >, I SWL SWL N I 21.80' I / I - - - 19.56' 17.58' N 1 / ; ' \ �/J/ \Y \ \ \\ - - - _ _ o\ - - l / / i 0 0 0 o d / / 1 36 PAD I 22 �- I / / / , / \ r \ /� 1 I- - _ _ - \ 0 Q z 1.68' ■ N I I / 1// / \ 0 0 v, \ / / 22 - I / \� \ / / / \ / \\ /o I I\\00 ° 0 20 DRAINAGE \ N o 124 PAD SWL / / / / /' \ - \ 0 0 o a ° 0 0 I 0 I \00 0 I / / / EASEMENT 22.41' 14.40' / \ - - 0 � 1 15' DRAINAGE I _ �\ IDS. --- / � � / / \ \\ � � �\ 00 0 0 0 0 \\ 0 ° \ o � ' o o I \ >�° / / // / , / / 37 PAD N S EASEMENT �/ / / \ T / /\ / \ - - - \ \ ° o o 0 0 ° o `�' \ I \0 / 0 0 _ ' 1 /' / / /, 1 /� / W ■ 22.41' ---- _ / \/ ( ► \ o o \ ° 1 0 - / / / / / / �6 PAD / 1 / / / / I .� 1 \ 0 1 1 \ \ �o 0 0 0 0 0 0 0/ 21.40' 20' DRAINAGE rn - �� I I \ \ M • EASEMENT �" 1 `� Y1' �1/ - `�� - - - _/4 / / 1 \ / 1 I �° / / rn � 44 x9 x26 \ '� I \ / , \ o I \ \ \ / _ W j SWL rn I SWL CLASS 1 \ \ ` I \ ^ I 1 d o\ I / v . 20.42' PAD / \ ' \ / 1 ° \ ° I I �\ \ \ _ / ' ' / /V_ SWL I 123 '22 63' VELOCITY RIPRAP DISSIPATOR PAD TO CONNECT TO / I / ' \ \ \ I \, \ \ ° \`\ 18.55' DISSIPATOR \ / m WETLAND EDGE (DO NOT OVERLAP INTO WETLAND). / / \ \, I o o C - \ �' r' s / I �� TOP OF DISSIPATOR PAD TO MATCH DOWN -SLOPE / / \ / \ a 0 38 PAD o„ / I \ / / / ^ \ o o ` o ` ° o C-D� PAD . / / / WETLAND ELEVATION TO ALLOW FOR POSITIVE / / / \ \ 0 0 \ o \ o ° 0 21.14' 22.56' C14rn / / , DRAINAGE / / \ \ o 0 0 00\ \ ` a \ \ I\ I SWL• I R1�1 // / // / 1200' �i^ r\\ // \\ \\0 ° 0/0\ \ \ °°\ of 19. LC14' - I 0 1 `�^ / // // / // \ / / \\ MATCHLINE C4.3 \\ / / ` G \ o // Q\ oo `- ■L N Imo■'■ �/�/■1, ■,�■ /■■\ ■■■■■■\■■IL _,■■ ■■■■■ ■�■�i��■■ ■ML■19\0M r, '�■�"■� JOB NO. M / o I SIC / O D , MATCHLINE C4.4 \ ` , \ 0 0 0 0 0 \ / \0 0 0 / 1 1 - N o NO) 21.98' , / � , 1 \ °°° ° °°°° o ► I I 59364 L N; / nl u N / / / I \ \ ° ° \ \ \ o 0 0 \ / / i 39 PAD rn "9 / I / \ \ 0 0 0 0 0 0 1 / o 1 1 I / / 21.54' �7 \� / 1 , / o o\ 0 0 0 \ I \ / 10 / / / ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL i II / I \ \ / / / I SHEET NO. 5' 00 \ / o ° \ 0 *, / o / / I / BRUNSWICK COUNTY, NCDEQ AND NCDOT / 21 ^ / I I \ o o \ \ \ / \� / / I I / / 54 4 / ' i / I I IN ° 0 \ /\�. o o �0 0 \ \ / \� / 0/ / / / I I / // STANDARDS, SPECIFICATIONS, AND DETAILS C4.3 o aD v+ o o U) C 0 0 F' U � L U) v c o D U N o z O :2 v) F_ _0 v 0 T c .� o L � U Q o a� 0 c > o .N U v o F o v c U c v a) -0 E U .? o in -0 v � U 0 ,c v U j o v in c � v 3 � o c 0 v o a a aD a N T H O L_