Loading...
HomeMy WebLinkAboutNC0003433_Table 8-6 Whole Rock Elemental Analysis of Soil_20150902TABLE 8-6 WHOLE ROCK ELEMENTAL ANALYSIS OF SOIL CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC Sample ID (b9s) Type As Cd Ce Co Cu Ga La Mo Ni Pb Sb Se Sn W Zn Zr ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ABMW-1(SB 39-41) Clayey silt 4 <0.2 135 40 16 11 2 7 56 9 <1 <1 1 <1 32 19 ABMW-2(SB 27-28) Saprolite with coal and weathered mudstone 34 <0.2 328 25 91 20 <1 5 43 13 4 1 3 <1 85 53 ABMW-3BR(63-64) Mudstone 6 <0.2 72 15 27 17 30 4 19 36 5 <1 1 <1 106 66 MW-6BR(SB 36-37) Sandstone, Arkosic Conglomerate 2 <0.2 8 11 12 14 19 1 9 12 <1 <1 1 <1 76 20 MW-6BR(SB 26-27) Sandstone, Arkosic Conglomerate 2 <0.2 7 9 9 15 18 <1 11 11 <1 <1 1 <1 67 16 MW-9BR(29-29.5) Sandstone 2 <0.2 55 7 11 16 22 2 7 17 1 <1 2 3 137 25 MW-9BR(23.5-24) Mudstone 3 <0.2 37 12 11 21 16 3 10 19 2 <1 2 1 123 46 MW-9BR(35-36) Sandstone, Graywacke 2 0.4 55 14 12 19 22 2 12 17 3 <1 2 <1 94 31 MW-15(SB 35-36) Mudstone, weathered 8 <0.2 62 19 45 16 30 4 51 16 2 <1 2 <1 88 57 MW-15(SB 18-19) Sand 2 <0.2 39 21 13 9 17 1 13 15 <1 1 <1 121 41 26 MW-15BR(73-74) Sandstone 9 <0.2 65 22 43 19 29 2 32 20 1 2 2 <1 118 41 MW-15BR(58-59) Mudstone 5 <0.2 58 18 32 13 26 2 27 18 2 <1 2 <1 88 35 Prepared by: DZH Checked by: KDF Notes: ppm = parts per million < = concentration not detected at or above the reporting limit. bgs = depth below ground surface P:\Duke Energy Progress. 1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Reporting\Tables\Table 8-6 Whole Rock Elemental Analysis of Soil.xlsx Page 1 of 1