Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0003433_Table 6-6 Well Construction Data_20150902
TABLE 6-6 WELL CONSTRUCTION DATA CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC IDENTIFICATION DATE INSTALLED MONITORING ZONE MATERIAL DIAMETER (INCHES) NORTHING (FEET) EASTING (FEET) BORING DEPTH' (FEET BGS) SURFACE CASING DEPTH' (FEET BGS) TOTAL WELL DEPTH' (FEET BGS) MEASURED WELL DEPTHZ (FEET BTOC) SCREENED INTERVAL' (FEET BGS) TOP OF SCREEN ELEVATIONS FEET MSL BOTTOM OF SCREEN ELEVATIONS FEET MSL)(FEET MEASURING POINT TOC MSL) GROUND SURFACE (FEET MSL) MONITORING WELLS ABMW-01 3/23/2015 Ash Pore Water PVC 2 669755.80 1987963.85 35 NA 35 37.20 30-35 169.40 164.40 201.60 198.66 ABMW-01S 3/25/2015 Surficial - Lower PVC 2 669762.22 1987950.15 51 38 51 53.00 46-51 153.83 148.83 201.83 198.64 ABMW-01BR 3/24/2015 Bedrock PVC 2 669764.64 1987936.38 105 55 73 73.00 68-73 133.44 128.44 201.44 198.5 ABMW-02SU 3/26/2015 Surficial - Upper PVC 2 668917.88 1985754.47 12 NA 12 15.52 7-12 183.14 178.14 193.66 190.47 ABMW-02SL 3/26/2015 Surficial - Lower PVC 2 668932.48 1985740.95 30 10 30 32.28 20-30 171.36 161.36 193.64 190.59 ABMW-03 4/22/2015 Ash Pore Water PVC 2 667363.16 1985346.947 20 NA 20 23.07 15-20 169.16 164.16 187.23 184.33 ABMW-03S 4/22/2015 Surficial - Lower PVC 2 667353.24 1985364.171 40 30 37 40.20 32-37 151.97 146.97 187.17 184.26 ABMW-03BR 4/21/2015 Bedrock PVC 2 667358.49 1985355.134 90 42 66 69.12 61-66 123.12 118.12 187.24 184.29 ABMW-04 4/11/2015 Ash Pore Water PVC 2 668904.00 1985275.893 26 NA 26 30.20 21-26 160.40 155.40 185.60 182.55 ABMW-04S 4/13/2015 Surficial - Lower PVC 2 668915.16 1985272.356 45 31 45 45.60 40-45 144.95 139.95 185.55 182.47 ABMW-05 5/8/2015 Ash Pore Water PVC 2 672319.99 1985006.451 20 NA 17 19.80 12-17 171.98 166.98 186.78 183.57 ABMW-05S 5/8/2015 Surficial - Lower PVC 2 672313.76 1984987.412 33 25 33 35.20 28-33 156.19 151.19 186.39 183.34 ABMW-05BR 5/9/2015 Bedrock PVC 2 672317.28 1984996.572 90 40 60 63.11 55-60 128.45 123.45 186.56 183.54 BGMW-04 7/28/2010 Surficial - Upper PVC 2 672664.35 1986489.61 19 NA 19 22.19 9-19 168.55 158.55 180.74 177.70 BGTMW-04 11/18/2010 Bedrock PVC 2 672663.82 1986496.35 50 NA 48 52.24 38-48 138.61 128.61 180.85 175.50 CMW-01 8/24/2010 Surficial - Upper PVC 2 666928.02 1985167.50 16 NA 15 18.55 5-15 157.12 147.12 165.67 162.30 CTMW-01 8/26/2010 Bedrock PVC 2 666936.52 1985163.26 53 NA 53 55.61 38-53 125.43 110.43 166.04 163.40 CMW-02 8/30/2010 Surficial - Upper PVC 2 671530.05 1984677.55 14 NA 14 17.25 4-14 162.15 152.15 169.40 166.60 CTMW-02 9/1/2010 Bedrock PVC 2 671538.77 1984675.45 53 NA 52.5 56.47 42.5-52.5 122.70 112.70 169.17 166.50 CMW-03 9/2/2010 Surficial - Upper PVC 2 672774.76 1985020.89 15 NA 15 18.92 5-15 167.04 157.04 175.96 172.70 CMW-05 11/19/2010 Surficial - Lower PVC 2 670569.11 1988084.54 21 NA 20 23.52 10-20 168.92 158.92 182.44 178.60 CMW-06 11/22/2010 Surficial - Upper PVC 2 668117.34 1988906.82 16 NA 14 18.12 4-14 161.77 151.77 169.89 166.60 CMW-07 12/1/2010 Surficial - Lower PVC 2 668474.28 1986974.79 26 NA 26.5 28.36 16.5-26.5 166.22 156.22 184.58 181.50 CTMW-07 12/3/2010 Bedrock PVC 2 668479.37 1986975.86 50 NA 48 52.34 38-48 142.32 132.32 184.66 181.40 CMW-08 11/30/2010 Surficial - Upper PVC 2 668852.85 1984746.56 16 NA 15 18.39 5-15 161.82 151.82 170.21 167.70 CTMW-08 11/30/2010 Bedrock PVC 2 668845.58 1984743.29 50.5 NA 48.5 52.60 38.5-48.5 127.72 117.72 170.32 167.40 MW-05BR 4/24/2015 Bedrock PVC 2 670565.59 1988071.28 50 30 50 52.98 45-50 133.46 128.46 181.44 178.09 MW-06BR 6/1/2015 Bedrock PVC 2 668110.53 1988860.94 38 21 37.5 40.82 32.5-37.5 134.42 129.42 170.24 166.93 MW-09 8/26/2013 Bedrock PVC 2 668146.44 1990530.01 20 NA 20 22.97 10-20 178.81 168.81 191.78 187.30 MW-09BR 4/27/2015 Bedrock PVC 2 668137.20 1990518.16 40 17 40 43.09 35-40 153.97 148.97 192.06 188.35 MW-10 8/22/2013 Surficial - Lower PVC 2 672858.64 1985066.52 20 NA 20 22.70 10-20 161.12 151.12 173.82 170.94 MW-10D 4/9/2015 Bedrock PVC 2 672854.72 1985048.553 35 NA 35 37.32 30-35 141.97 136.97 174.29 171.10 MW-10BR 4/10/2015 Bedrock PVC 2 672860.37 1985054.601 65 37 58 60.27 53-58 118.95 113.95 174.22 171.05 MW-11 8/19/2013 Surficial - Upper PVC 2 671306.96 1986219.74 20 NA 20 22.66 10-20 162.36 152.36 175.02 171.74 MW-12 8/23/2013 Surficial - Upper PVC 2 667647.84 1987858.33 20 NA 20 22.90 10-20 158.22 148.22 171.12 167.72 P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Reporting\Tables\Table 6-6 Well Construction Data.xlsx Page 1 of 3 TABLE 6-6 WELL CONSTRUCTION DATA CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC IDENTIFICATION DATE INSTALLED MONITORING ZONE MATERIAL DIAMETER (INCHES) NORTHING (FEET) EASTING (FEET) BORING DEPTH' (FEET BGS) SURFACE CASING DEPTH' (FEET BGS) TOTAL WELL DEPTH' (FEET BGS) MEASURED WELL DEPTHZ (FEET BTOC) SCREENED INTERVAL' (FEET BGS) TOP OF SCREEN ELEVATIONS FEET MSL BOTTOM OF SCREEN ELEVATIONS FEET MSL)(FEET MEASURING POINT TOC MSL) GROUND SURFACE (FEET MSL) MW-12BR 3/4/2015 Bedrock PVC 2 667661.05 1987855.866 75 27 49 52.89 44-49 122.87 117.87 170.76 167.89 MW-13 8/23/2013 Surficial - Upper PVC 2 666832.43 1985629.89 20 NA 20 23.25 10-20 158.70 148.70 171.95 168.95 MW-14 8/21/2013 Bedrock PVC 2 668866.24 1984754.72 80 NA 80 NM* 70-80 101 91 173.94 171.37 MW-15SU 4/1/2015 Surficial - Upper PVC 2 672863.71 1985761.215 10 NA 10 13.15 5-10 164.58 159.58 172.73 169.48 MW-15SL 4/1/2015 Surficial - Lower PVC 2 672863.92 1985751.233 23 NA 20 23.36 15-20 154.33 149.33 172.69 169.45 MW-15BR 4/7/2015 Bedrock PVC 2 672864.58 1985740.579 80 27 60 63.30 55-60 114.62 109.62 172.92 169.69 MW-16S 4/29/2015 Surficial - Lower PVC 2 671693.45 1988875.56 17 NA 16 19.07 6-16 158.98 148.98 168.05 165.1 MW-16BR 5/5/2015 Bedrock PVC 2 671676.17 1988871.14 70 20 51 53.91 46-51 119.64 114.64 168.55 165.35 MW-17SU 3/7/2015 Surficial - Upper PVC 2 670959.16 1986544.617 19 NA 19 23.23 9-19 158.95 148.95 172.18 169.02 MW-17SL 3/6/2015 Surficial - Lower PVC 2 670965.96 1986551.728 30 NA 30 32.38 25-30 145.28 140.28 172.66 169.54 MW-17BR 3/10/2015 Bedrock PVC 2 670972.22 1986559.353 87 34 57 60.30 52-57 118.19 113.19 173.49 170.34 MW-18S 2/11/2015 Surficial - Upper PVC 2 667943.80 1988841.906 9.5 NA 9.5 12.18 4.5-9.5 162.08 157.08 169.26 165.90 MW-19S 2/11/2015 Surficial - Upper PVC 2 667928.43 1986427.024 7.8 NA 7.8 10.51 2.8-7.8 171.40 166.40 176.91 173.83 MW-20S 5/13/2015 Surficial - Lower PVC 2 666368.14 1985879.58 20 NA 25 27.72 15-25 153.05 143.05 170.77 168.01 MW-20BR 5/14/2015 Bedrock PVC 2 666368.04 1985860.32 65 27 61 64.34 56-61 111.89 106.89 171.23 167.98 MW-21SU 4/23/2015 Surficial - Upper PVC 2 669923.29 1984803.14 16 NA 16 19.83 11-16 162.09 157.09 176.92 173.85 MW-21SL 4/23/2015 Surficial - Lower PVC 2 669935.84 1984808.19 30 NA 29 31.77 24-29 150.19 145.19 176.96 173.88 MW-21BR 4/23/2015 Bedrock PVC 2 669944.61 1984810.47 87 34 60 63.81 50-60 123.33 113.33 177.14 174.03 PIEZOMETERS CHATH-075-P100* 12/14/2014 Surficial - Lower* PVC 2 672718.80 1985333.1 30 NA 30 21.60 20-30 163.48 153.48 175.08 175.20 CHATH-075-P101* 12/17/2014 Surficial - Upper* PVC 2 672294.10 1985551.70 20.4 NA 20.4 25.43 10-20 168.68 158.68 184.11 184.39 CHATH-075-P102* 12/16/2014 Surficial - Upper*" PVC 2 672684.00 1985320.30 25 NA 25 30.26 15-25 166.40 156.40 186.66 187.01 CHATH-075-P103* 12/15/2014 Surficial - Lower* PVC 2 672305.60 1985615.80 15 NA 14.6 14.50 4.6-14.6 161.01 151.01 165.51 165.78 CHATH-076-P100* 12/18/2014 Surficial - Lower* PVC 2 669219.20 1984742.70 35 NA 35 NM* 25-35 144* 134* 168.85 169.09 CHATH-076-P101* 12/17/2014 Ash Pore Water* PVC 2 669225.30 1984797.30 15 NA 15 NM* 5-15 190* 180* 194.56 194.87 CHATH-076-P102* 12/18/2014 Surficial - Upper* PVC 2 668705.00 1984823.80 35 NA 35 NM* 25-35 170* 160* 195.04 195.26 CHATH-076-P103* 12/17/2014 Surficial - Upper* PVC 2 668699.00 1984763.20 15 NA 15 NM* 5-15 162* 152* 166.72 167.07 CHATH-077-P100* 12/18/2014 Surficial - Upper* PVC 2 667949.50 1984891.90 31 NA 31 NM* 21-31 174* 164* 194.93 195.35 CHATH-077-P102* 12/18/2014 Surficial - Upper* PVC 2 666990.00 1985800.60 30 NA 30 NM* 20-30 166* 156* 185.72 186.03 CHATH-077-P103* 12/17/2014 Surficial - Upper* PVC 2 666961.60 1985795.00 19.5 NA 19.5 NM* 9.5-19.5 171* 161* 180.31 180.67 CHATH-079-P100* 12/18/2014 Surficial - Upper* PVC 2 669306.10 1987629.60 25.4 NA 25.4 NM* 15-25 178* 168* 193.03 193.35 CHATH-079-P101* 12/18/2014 Surficial - Upper* PVC 2 668386.40 1988221.80 30.4 NA 30.4 NM* 20-30 173* 163* 192.94 193.29 CHATH-079-P102* 12/16/2014 Surficial - Upper* PVC 2 668340.60 1988190.70 15 NA 15 NM* 5-15 168* 158* 173.41 173.73 CHATH-079-P103* 12/18/2014 Surficial - Upper* PVC 2 669272.40 1988713.50 30.4 NA 30.4 NM* 20-30 173* 163* 193.67 193.93 CHATH-079-P104* 12/17/2014 Surficial - Upper* PVC 2 670440.10 1987674.30 30.4 NA 30.4 NM* 20-30 173* 163* 193.59 193.82 CHATH-079-P105* 12/17/2014 Surficial - Upper* PVC 2 670515.30 1987699.10 15 NA 15 NM* 5-15 168* 158* 173.08 173.40 P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Reporting\Tables\Table 6-6 Well Construction Data.xlsx Page 2 of 3 TABLE 6-6 WELL CONSTRUCTION DATA CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC IDENTIFICATION DATE INSTALLED MONITORING ZONE MATERIAL DIAMETER (INCHES) NORTHING (FEET) EASTING (FEET) BORING DEPTH' (FEET BGS) SURFACE CASING DEPTH' FEET BGS TOTAL WELL DEPTH' (FEET BGS) MEASURED WELL DEPTH' (FEET BTOC) SCREENED INTERVAL' (FEET BGS) TOP OF SCREEN ELEVATIONS FEET MSL BOTTOM OF SCREEN ELEVATIONS FEET MSL MEASURING POINT TOC (FEET MSL) GROUND SURFACE (FEET MSL) PZ-01 3/2/2007 Surficial - Upper PVC 2 670759.20 1986562.10 15 NA 13 NM* 3-13 162* 152* 168.0 168.20 PZ-02 3/2/2007 Surficial - Upper PVC 2 670692.80 1987397.20 15 NA 15 NM* 5-15 167* 157* 175.0 172.60 PZ-03S 3/2/2007 Surficial - Upper PVC 2 669287.10 1988781.60 15 NA 13 NM* 3-13 168* 158* 174.0 171.00 PZ-03D 3/2/2007 Bedrock PVC 2 669278.80 1988780.30 60 NA 60 NM* 45-60 121* 111* 173.9 171.10 PZ-04 3/2/2007 Surficial - Upper PVC 2 668139.91 1988446.45 15 NA 13 NM* 3-13 168* 158* 173.72 170.99 PZ-05 3/2/2007 Surficial - Upper PVC 2 669245.50 1987543.10 16 NA 13 NM* 3-13 164* 154* 169.80 170.00 PZ-06 8/21/2013 Ash Pore Water PVC 1 669621.57 1988202.29 43 NA 33 NM* 23-33 172* 162* 198.03 195.47 PZ-07 8/16/2013 Ash Pore Water PVC 1 668345.75 1985623.36 25 NA 18 NM* 8-18 179* 169* 189.74 187.29 PZ-08 8/15/2013 Ash Pore Water PVC 1 669441.46 1985252.22 23.5 NA 21 NM* 11-21 180* 170* 193.31 193.17 PZ-09 8/15/2013 Surficial - Upper PVC 1 668894.95 1985735.69 25 NA 22 NM* 12-22 179* 169* 193.82 190.82 PZ-10 8/19/2013 Ash Pore Water PVC 1 672333.12 1984978.51 35 NA 18 19.64 8-18 175.82 165.82 185.46 183.53 Notes: Prepared by: KFD Checked by: CJS BGS - Below ground surface NA - Not Applicable MSL - Mean sea level PVC - Polyvinyl Chloride BTOC - Below top of casing NM - Not Measured 'Depths measured from ground surface during well installation and reported on the monitoring well construction logs 2Well depths measured by SynTerra, June 30 and July 1, 2015 3 Where total depth was not measured well screen elevations were estimated, based on the difference between TOC and ground surface elevations. Monitoring well coordinate and elevation data for newly installed wells from surveys provided by McKim & Creed, completed 8/14/15. McKim and Creed also verified survey location at several existing locations. * No boring logs available for "CHATH" piezometers, monitoring zone assigned based on depths and comparison to nearby sample locations with boring logs P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Reporting\Tables\Table 6-6 Well Construction Data.xlsx Page 3 of 3