Loading...
HomeMy WebLinkAboutNC0003433_Table 6-10 Insitu Hydraulic Conductivity Test Results_20150902TABLE 6-10 IN -SITU HYDRAULIC CONDUCTIVITY TEST RESULTS CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC Ash Basin Hydraulic Conductivity Hydraulic Conductivity Well ID Slug Test Slug Test Number (cm/sec) (ft/day) Measured Geometric Mean Measured Geometric Mean ABMW-01 Slug Out Test 1 6.73E-04 4.54E-04 1.91E+00 1.29E+00 Test 2 3.06E-04 8.67E-01 ABMW-03 Slug Out Test 1 4.01E-04 4.61E-041.31E+00 14E+00 Test 2 5.29E-04 Hl..50E+00 ABMW-04 Slug Out Test 1 1.58E-04 1.77E-04 4.47E-01 5.01E-01 Test 2 1.98E-04 5.60E-01 ABMW-05 DRY GEOMETRIC MEAN 3.33E-04 9.44E-01 HIGHEST CONDUCTIVITY 6.73E-04 1.91E+00 LOWEST CONDUCTIVITY 1.58E-04 4.47E-01 Upper Surficial Well ID Slug Test Slug Test Number Hydraulic Conductivity (cm/sec) Hydraulic Conductivity (ft/day) Measured Geometric Mean Measured Geometric Mean ABMW-02SU Slu -Out Test 1 1.46E-04 1.38E-04 4.13E-01 3.92E-01 Slug -Out Test 2 1.32E-04 3.73E-01 MW-15SU Slug Out Test 1 1.12E-03 1.12E-03 3.19E+00 3.19E+00 MW-17SU Slug In Test 1 1.46E-03 1.03E-03 4.13E+00 2.93E+00 Test 2 1.27E-03 3.59E+00 Test 3 1.08E-03 3.05E+00 Test 4 1.21E-03 3.43E+00 Slug Out Test 2 6.69E-04 1.90E+00 Test 4 7.55E-04 2.14E+00 MW-18S Slug Out Test 1 8.41E-05 8.41E-05 2.38E-01 2.38E-01 MW-19S DRY MW-21SU Slug Out Test 1 2.84E-05 2.84E-05 8.06E-02 8.06E-02 GEOMETRIC MEAN 4.15E-04 1.18E+00 HIGHEST CONDUCTIVITY 1.46E-03 4.13E+00 LOWEST CONDUCTIVITY 2.84E-05 8.06E-02 P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Reporting\Tables\Table 6-10 Insitu Hydraulic Conductivity Test Results.xlsxSummary Results by Unit Page 1 of 3 TABLE 6-10 IN -SITU HYDRAULIC CONDUCTIVITY TEST RESULTS CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC Lower Surficial Well ID Slug Test Slug Test Number Hydraulic Conductivity (cm/sec) Hydraulic Conductivity (ft/day) Measured Geometric Mean Measured Geometric mean ABMW-01S Su Out Test 2 1.02E-03 1.02E-03 2.89E+00 2.89E+00 ABMW-02SL Slug -Out Test 1 8.75E-05 9 78E-05 2.48E-01 2.77E-01 Slug -Out Test 2 1.09E-04 3.10E-01 ABMW-03S Slug -Out Test 1 4.50E-06 4.50E-06 1.27E-02 1.27E-02 ABMW-04S Slug Out Test 1 2.48E-04 2.89E-04 7.02E-01 8.19E-01 Test 2 3.37E-04 9.56E-01 ABMW-05S Slug -Out Test 1 4.15E-03 4.77E-03 1.18E+01 1.35E+01 Slug -Out Test 2 4.49E-03 1.27E+01 Slug -Out Test 3 5.83E-03 1.65E+01 MW-15SL Slug -Out Test 1 3.29E-05 3.29E-05 9.34E-02 9.34E-02 MW-16S Slug Out Test 1 6.10E-03 5.98E-03 1.73E+01 1.70E+01 Test 2 6.32E-03 1.79E+01 Test 3 6.11E-03 1.73E+01 Test 4 6.25E-03 1.77E+01 Test 5 5.22E-03 1.48E+01 MW-17SL Slug In Test 1 7.39E-04 5.71E-04 2.10E+00 1.62E+00 Test 2 5.35E-04 1.52E+00 Test 3 5.12E-04 1.45E+00 Slug Out Test 1 5.47E-04 1.55E+00 Test 2 5.89E-04 1.67E+00 Test 3 5.35E-04 1.52E+00 MW-20S Slug Out Test 1 1.79E-03 1.96E-03 5.06E+00 5.55E+00 Test 2 1.69E-03 4.80E+00 Test 3 2.49E-03 7.06E+00 MW-21SL Slug -Out Test 1 2.79E-03 3.39E-03 7.90E+00 9 60E+00 Test 2 4.12E-03 1.17E+01 GEOMETRIC MEAN 9.55E-04 2.71E+00 HIGHEST CONDUCTIVITY 6.32E-03 1.79E+01 LOWEST CONDUCTIVITY 4.50E-06 1.27E-02 Transition Zone Hydraulic Conductivity Hydraulic Conductivity Well ID Slug Test Slug Test Number (cm/sec) (ft/day) Measured Geometric Mean Measured Average MW-10D Slug -Out Test 1 2.00E-05 2.00E-05 5.68E-02 5.68E-02 GEOMETRIC MEAN 2.00E-05 5.68E-02 HIGHEST CONDUCTIVITY 2.00E-05 5.68E-02 LOWEST CONDUCTIVITY 2.00E-05 5.68E-02 P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Reporting\Tables\Table 6-10 Insitu Hydraulic Conductivity Test Results.xlsxSummary Results by Unit Page 2 of 3 TABLE 6-10 IN -SITU HYDRAULIC CONDUCTIVITY TEST RESULTS CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC Bedrock Well ID Slug Test Slug Test Number Hydraulic Conductivity (cm/sec) Hydraulic Conductivity (ft/day) Measured Geometric Mean Measured Average ABMW-01BR Slug -Out Test 1 8.86E-04 9.23E-04 2.51E+00 2.62E+00 Slug -Out Test 2 9.24E-04 2.62E+00 Slug -Out Test 3 9.61E-04 2.72E+00 ABMW-03BR Slug -Out Test 1 7.88E-03 8.85E-03 2.23E+01 2.51E+01 Slug -Out Test 2 7.58E-03 2.15E+01 Slug -Out Test 3 1.16E-02 3.29E+01 ABMW-05BR PK-SI Test 1 1.44E-05 1.44E-05 4.08E-02 4.08E-02 MW-05BR Slug -Out Test 1 3.00E-06 3.00E-06 8.50E-03 8.50E-03 MW-06BR Slug -Out Test 1 5.47E-05 8.14E-05 1.55E-01 2.31E-01 Slug -Out Test 2 1.21E-04 3.43E-01 MW-09BR PK-SO Test 1 2.95E-05 2.95E-05 8.36E-02 8.36E-02 MW-10BR Slug -Out Test 1 1.55E-04 1.82E-04 4.41E-01 5.16E-01 Slug -Out Test 2 2.14E-04 6.05E-01 MW-12BR Slug -In Test 1 7.39E-04 6.67E-04 2.09E+00 1.89E+00 Slug -Out Test 1 7.63E-04 2.16E+00 Slug -Out Test 2 5.56E-04 1.58E+00 Slug -Out Test 3 6.30E-04 1.78E+00 MW-15BR Slug -Out Test 1 9.75E-06 9.75E-06 2.76E-02 2.76E-02 MW-16BR Slug -Out Test 1 6.51E-04 6.28E-04 1.85E+00 1.78E+00 Test 2 5.96E-04 1.69E+00 Test 3 6.37E-04 1.80E+00 MW-17BR Slug -In Test 1 3.98E-04 3.96E-04 1.13E+00 1.12E+00 Slug -In Test 2 3.63E-04 1.03E+00 Slug -Out Test 1 3.95E-04 1.12E+00 Slug -Out Test 2 4.32E-04 1.22E+00 MW-20BR PK-SI Test 1 1.37E-02 1.62E-02 .89E+01 4.58E+01 PK-SO Test 1 1.90E-02 H5.38E+01 MW-21BR PK-SI Test 1 1.28E-06 1.28E-06 3.63E-03 3.63E-03 GEOMETRIC MEAN 3.66E-04 1.04E+00 HIGHEST CONDUCTIVITY 1.90E-02 5.38E+01 LOWEST CONDUCTIVITY 1.28E-06 3.63E-03 Created by: RAG Checked by: HJF Notes: Slug tests were analyzed using the Hvorslev mathmatical model. DRY= dry well PK-SI = Packer Test, Slug -In PK-SO = Packer Test, Slug Out Sandstone Mudstone Mudstone and Sandstone P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Reporting\Tables\Table 6-10 Insitu Hydraulic Conductivity Test Results.xlsxSummary Results by Unit Page 3 of 3