Loading...
HomeMy WebLinkAboutNC0003433_Table 6-1 Revised Sample Locations_20150902TABLE 6-1 SUMMARY OF REVISED SAMPLE LOCATIONS CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC Well/ General Location on Relocation,Approximate Addition, Distance and Justification for Relocation, NCDENR Concurrence/Comment Boring ID Groundwater Assessment Plan or Deletion? Direction of Relocation Addition, or Deletion ABMW-1/S/BR Ash stack in the central portion of Relocation Approximately 500 feet south Stability concerns on ash stack. NCDENR approved of the revised location the 1985 Ash Basin ABMW-2SU/SL Northcentral portion of 1978 ash Relocation West side of 1978 ash basin Stability concerns on ash basin NCDENR approved of the revised location basin Northeast portion of the 1956 Ash Approximately 300 feet southwest Originally proposed location was within the ABMW-5/S/BR Basin Relocation to be adjacent to existing footprint of a planned ash and stormwater NCDENR approved of the revised location. piezometer PZ-10 management project Within the 1985 Ash Basin (on the NCDENR requested that an additional boring be ABB-6 NA Addition north side of the basin) installed to obtain additional ash quality data from NCDENR approved of location. different portions of the ash basin Access to the the originally proposed location would Background location north of have been unnecessarily difficult requiring crossing MW-15SU/SL/BR Shaddox Creek and north of the Relocation Approximately 150 feet west a ditch and traversing through wetlands. Access to Yes, NCDENR approved of revised location. 1956 ash basin the reivsed location was relatively easy. Revised location is still upgradient of the ash basins. Background location north of Revised location is further from the ash basins and MW-16S/BR Corinth Road Relocation Approximately 360 feet northeast likely not hydraulically influenced by the ash Yes, NCDENR approved of revised location. basins. East/outside of side of security Approximately 300 feet Location moved to be inside of secured portion of / L/ MW-17SU S BR gate along main plant entrance. Relocation southwest. the property, while remaining in the same general NCDENR approved of location. (north of driveway) vicinity of the originally proposed location. After well was installed NCDENR requested Location moved to avoid being installed in flooded that the location be installed on the MW-19S South of 1978 ash basin Relocation Approximately 600 feet north property/compliance boundary. Well area. sampling results may determine if another well on the boundary needs to be installed. Prepared by: KDF Checked by: RKD P:\Duke Energy Progress. 1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Reporting\Tables\Table 6-1 Revised Sample Locations.xlsx Page 1 of 1