Loading...
HomeMy WebLinkAbout20231276 Ver 1_More Info Received_20231109 (3)C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Headwater Wetland Yes Corps 0.002 W2 P Fill Headwater Wetland No Corps 0.001 W3 P Fill Headwater Wetland No Corps 0.001 W4 P Fill Headwater Wetland Yes Corps 0.003 W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.007 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert Burleson Creek PER Corps 2.8 10 S2 T Culvert unnamed tributary PER Corps 3.1 14 S3 P Culvert unnamed tributary PER Corps 3.1 4 S4 T Dewatering Burleson Creek PER Corps 2.8 31 S5 T Dewatering unnamed tributary PER Corps 4.3 20 S6 Choose one 3h. Total stream and tributary impacts 79 3i. Comments: Permanent impacts to acres of stream bed (total = 0.004 acres): S1 = 0.002 AC; S3 = 0.002 AC Temporary impacts to acres of stream bed (total = 0.005 acres): S2 = 0.001 AC; S4 = 0.002 AC; S5 = 0.002 AC Page 4of10 PCN Form — Version 1.4 January 2009