Loading...
HomeMy WebLinkAbout20231598 Ver 1_Site Plan_20231122Proposed (Plan View) ,' slopes Z7� + 5` La ke -4 J(Full Pond/ Normal Water Level) Full Pond/ Normal Watervvel Shoreline 150, .5o x I 5C0 s� ll C`rl`x� Lake (At Full Pond/ Noftnal Water Uvel) Existing Deck 3U ft x' ff 3ftx350ft Full Pon dj Normal Water Level Below full twndl NWL Rio etiine afcxisan Rlprap Above full Pond/ NWL 2 ft.x150 ft. additional clearing • If necessary E AMPLE Plan View Proposed (Side View) La ke t, (At,l ull Pond/ Normal ter Level) i 3 3 f[. below full pond waterlevel 4 ft. above full pond water level 2 ft. additional clearing •if ne[emry Existing bank iD W hank a height Qc�e Q Side ViEw MPLE Duke Energy Lake Services Guidance for Completing an Excavation Permit Application Note: If you are proposing excavation in association with the permitting of a new or expanded facility under the Marina or Conveyance Programs, you do not need to complete this application. Instead, you should incorporate the excavation request into the permit application for the marina/conveyance using the appropriate application. Step 1: Contact Duke Energy Lake Services Complete "Part I" of the application and develop a drawing of the proposed excavation area. Contact Duke Energy Lake Services to schedule a site visit. Lake Services will conduct a site visit to determine if Duke Energy will accept an excavation permit application for the proposed work. If the Lake Services representative determines the application process may proceed, he/she will initial Part I of the application. Step 2: Draft Application Development Complete Parts II-HI.A-G and Part V of the Excavation Permit Application, Step 3: Agency Consultation Send the draft application developed during Step 2 to the agencies for review and comment on the proposed activity. Refer to the Agency / Organization List available from Duke Energy to determine which federal, state, regional, and local agencies and organizations require consultation or review, Note. Duke Energy reserves the right to require consultation with additional organizations beyond those included in the Agency / Organization List. Each agency / organization must be provided at least 30 days prior notification. Evidence must be provided (e.g., response letter or Certified Mail receipt) in the complete application to show each agency / organization was given the opportunity to review the proposal. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. All permits must be valid at time of application and have a term longer than the projected schedule for completing the permitted project. What to Expect During Agency Review and Comment: • You will typically receive a letter from each agency / organization either documenting its concurrence with your proposal, requiring additional information, recommending modifications, or offering no comment, You must address each agency's / organization's comments with a follow-up letter and in your final application as described in part IV. • If you do not receive any documentation from an agency / organization within 30 days of its receipt of your proposal, you must provide the agency / organization with a follow-up letter requesting comment on your proposal within 15 days from the date of the follow-up letter. If you still do not receive any response as a result of the second letter, type "NO RESPONSE" Duke Energy Page 1 of 13 rev 1 ]raarai Ueavation Program at the top of the follow-up letter and include it in the application along with proof of the agency's 1 organization's receipt of the letter (e.g,, Certified Mail receipt). You may proceed with the application process recognizing, however, that if its comments come later in the application process, you will be required to address them. From the United States Army Corps of Engineers (Corps): (** Note — The Corps may have additional forms to submit for your proposal and an additional fee.) If the excavation can be done under the requirements of the General Permit (GP) or a Nationwide Permit (NWP), you will typically receive a copy of the Corps' tear sheet documenting authorization and providing any additional instructions. If the excavation isn't covered under the GP or a NWP, you'll be required to obtain an individual 404 Dredge and Fill permit from the Corps. You roust receive written documentation from the Corps that your application either (1) meets the requirements of the GP or a NWP or (2) the proper 404 Dredge and Fill permit has been received before Duke Energy can process your application. From the North Carolina Department of Environmental Quality (1VCDEQ), Division of Water Resources: (Note NCDEQ may have additional forms to submit for your proposal and an additional fee.) If the proposal meets the requirements of the Clean Water Act Sect. 401 Water Quality Certification, you will typically receive a letter from the NCDEQ Division of Water Resources documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter requiring additional information or recommending modifications. You must receive written documentation from NCDEQ noting any required Sect. 401 Certification has been received before Duke Energy can process your application. ■ From the North Carolina Wildlife Resources Commission (NCWRC): If you do not receive any documentation from the NCWRC within 30 days of their receipt of your application, you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application process, you will be required to address them. From the South Carolina Department of Health and Environmental Control (SCDHEC): (Note — SCDHEC may have additional forms to submit for your proposal and an additional fee) The SCDHEC conducts a joint application process with the USACOE in S.C. If the proposal meets any applicable requirements of the Clean Water Act Sect. 401 Water Quality Certification, you will typically receive a letter from SCDHEC documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter from USACOE requiring additional information for the agencies participating in the joint application process, You must receive written documentation from SCDHEC noting Sect. 401 Certification has been received if required before Duke Energy can process your application. ■ From the South Carolina Institute of Archaeology and Anthropology (SCIAA): The applicant must wait 30 days after receiving the signed postal returned receipt. If a response from SCIAA has not been received by this time you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application review process, you will also be required to address them. Duke Energy Page 2 of 13 rev 1 i12M t Excavation Program Step 4: Final Application & Submittal to Duke Energy Following the consultation process, finalize the application. The final application submitted to Duke Energy should incorporate all comments and recommendations provided by agencies and organizations during the agency consultation process as well as copies of all permits received. In addition to the final application include the following; ■ One check payable to duke Energy for the application fee and security deposit • If applicable, a separate check payable to the appropriate Habitat Enhancement Program fund • Signed Excavation Program Applicant's Agreement Note. Co -applicants must also submit the application fees and applicable HEP fees with the application. Nke Energy Page 3 of 13 rev t Il2212I Excavation Program Duke Energy Excavation Permit AnIllfcation Form FOR DUKE ENERGY usE ONLY Duke File No. Application Fee S Security Deposit $ Check # Date Recv'd Initials Date of Duke Energy Lake Services, applicant and/or contractor on -site inspections Datet -t 7 lnitials Date Final Protection/Avoidance Area Markings Field - Verified Approved to Start Work By * {Print) Date Completion Required Date of Any Approved Extension Date Passed Closeout Inspection* Initials Initials Date (sign) Initials Any Stop Work Orders or SMG Violations*? (check one) ClYes ❑No (if Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval better and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Orders with application. Part I. Applicant Information [Please Print] Name r Telephone -&1 Email address: W 1 �r 31 ro di 1. CO YY]_ Ll o R ire rywaVEA n �� Contractor Company Contractor Contact Person Contractor Email Address: Mailing Address (if different) 1k11■ . i Telephone i ' .■9. 8f \ f — ■ ■ CAP CWz b ■■+ it •i LAKE LOT INFORMATION Lake �rr � County htmb�ity li State Tax Map No, QQ / Subdivision r Lot 1 Section No. % Lot Size / % Acres Duke Energy Page 4 of 13 rev I V22/2I Excavation Program Dune Enerav Excavation Permit Application Form Security Deposit Refund Information The security deposit will be refunded after the excavation permit has expired if no violations of the approval occurred. The applicant will receive the security depost refund at the mailing address in Part I unless an alternative recipient is identified. Send the security deposit to an alternative recipient? (check one) Tdyes ONO (If Yes, include name and mailing address below. Name: Y' �e�d Tax ID: 6 + ?J Mailing Address: _zLf rM17a �ou�-Yrr�rr , f11 C 2B�lflla Are there any Co -Applicants*? (check one) Oyes ZKo (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners I lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection Q 7--1 Z a Initials (Duke Energy) '%_ (applicant/contractor) C� Duke Energy Page 5 of 13 re„ I1i2MI Excavation Program Duke Enerizv Excavation Permit Application Farm Part II. Description of PrNect A. Basic Information 1. Type of excavation: (check one) ❑ New excavation O'Maintenance excavation 2. Purpose of excavation: (check one) ❑ Water Intake Channel ❑ Other (sped): 3. Lake user category: (check one) ❑Commercial Marina ❑Other (spec): Otoat Access Channel ❑ Wastewater Discharge Channel A frivate ❑Residential Marina ❑Public � 1 � 4. Max. Excavation Area Dimensions (ft): Length Width 5-1 Depth I� (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in #4) 5. Volume of Excavated Material (TOTAL for the project): r, L9 _Cubic yards 6. Type of material removed Capplicant determines by.fteld sample iractica : 7. Excavation Site area: Acre (s) Disposal Site area: s6G Acre (s) S. Total Disturbed Area (including equipment staging urea): ,� Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) ,dyes ONO 10. Do you claim title to the disposal area? (check one) ❑Yes J:2No 11. Do you claim title to the equipment staging area? (check one) ,OYes ❑No 12. Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) ❑Yes '0�io (If Yes, spec): 13, How will the excavated material be entrapped and the erosion controlled? (e.g. see attached erosion controlplan and disposal area design): �-ed e. w l+lrl bi reach eaCm� r Iacp— ynq}er i cc 1s in h o p � ba es 1,�►LL40mcq b�`� e� - po loo�d ��taciux,�p *Ut��s and ct for { fS d'k -, - -, n ---,o I C-, 1 U2 Duke Energy Page 6 of 13 rev 11127J21 Excavation Program Duke Energy Excavation Permit Application Form 14. Type(s) of excavation equipment to be used: Lo-�qq r cox_Vl ejca\jix mv-, Short r ea c11 excrcvaj-or', �nru V,5. rgea 'k Puyn P 15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) X'es ❑No I es, explain) bred In equlpmevi%r' C'.t-will be, rc�� � ore via Imfin4 pignf' t., . m CaS+rm 1bocv� o� ce E6+g3jA GLY',eCx rds5 r �r t 16. Will return water re-enter the reservoir? (Check one) ❑Yes ❑No .b�4/A (If Yes, vecifY point(s)of re-entry and show on Excavation Area Drawirr) % 17. Is there an existing facility (e.g. pier) that access is being maintained to by conducting the excavation? ❑Yes UNO New L�c�S �a �e eons i-u c�cd (If Yes, provide the existing permit number. If No, include a scaled drawing of the proposed facility). Permit # 18. Total planned duration of the work (Include f rst equipment mobilization, excavation through final mitigation measures complete): START �1 04 FINISH 1 �v (Month) (Year) (Month) (Year) Duke Energy Page 7 of 13 rev t tr22l21 Excavation Program Q b a Q � A v 3 b n Q � V U [n w 0 ON u Duke Enenzy Excavation Permit Alpolication Form C. Applicant's Signatures Comments: Applicant Name (print) �y Applicant Signature*iag, Date 7 Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Date Date Date Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 13 rev 11/22/2021 Excavation Program Duke Eneruv Excavation Permit Application Form Part III. Additional Information A. Deed and Survey Plat: A copy of the deed and registered survey plat or other instrument under which each applicant and co -applicant claims title to the affected property (the shoreline adjoining the excavation area, equipment staging area, area crossed by any spoil and return water lines, and the disposal area). if the applicant(s) is(are) not the owner(s) of said property, then forward a copy of the deed and registered survey plat or other instrument under which the owner(s) claim title plus written authorization from the owner(s) to carry out the project on their land. S. Excavation Area Drawing: An accurate drawing of the area to be excavated. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed excavation area and equipment staging areas; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); property corners for project front lots; the full pond elevation contour and lines dividing the cove width into equal thirds (as applicable); approximate volume in cubic yards of the material to be excavated; point(s) of return water re-entry; the boundaries of any adjoining areas that are to be specifically avoided or protected during the work and the location (address) of the disposal area for the excavated material. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] C. Disposal Area Drawing: An accurate drawing of the proposed design for the disposal area. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed disposal area; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); the full pond elevation contour (unless disposal is well away from the lake); the boundaries of any adjoining areas that are to be specifically avoided or protected during the work; the location (address) of the excavation area from which the material came and a statement of the disposal area's capacity with all dimensions labeled that were used in the volume calculation. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] Also note for projects larger than one (1) acre in North Carolina, including excavated, equipment staging, and disposal areas, you must submit an erosion control plan. For projects larger than two (2) acres in South Carolina, including excavated, equipment staging and disposal areas, you must submit an erosion control plan. For projects < two (2) acres in South Carolina, you must submit a completed standard reportingform for construction sites disturbing two (2) acres or less to the South Carolina Dept. of Health and Environmental Control (SCDHEC) - Stormwater Management D. Vicinity Map and Driving Directions- A vicinity neap and directions by road showing directions to both the excavation area and disposal area. Include the latitude and longitude of both the excavation area and the disposal area. Part IV. Agency Reviews and Approvals Begin this section with a summary table of all agencies consulted and applicant response to agency comments as shown in the example table below. Agencies should be listed in the order Duke Energy Page 11 of 13 rev 11/22/2021 Excavation Program Duke Enera Excavation Permit Application Form shown in the Agency/Organization List. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. Table IV-1. Sample Agencv Comment and Res onse Table A2ency Comment Applicant Response Agency 1 The activity is approved as proposed. INA A&Lncy 2 The on -site well provides drinking water to the Contacted Mr. Smith on 111120xx. No public. Please contact Mr. Smith to discuss the further action needed. proposed changes and potential issues associated with Your prrosal. You must contact us immediately if Applicant will contact Agency 2 if endangered species are located during the endangered species are located during course of construction, construction Azencv 3 Requested agency comments on 111120xx and NA again on 211120xx. No response as of 2116120xx. Azenev 4 Section 401 Water Quality Certification Applicant will comply with the conditions of the 401 Water Quality Certification Following the table of agency comments and applicant responses, include a table of permits and certifications issued by the reviewing agencies. As with the table of agency comments and applicant responses, agencies should be listed in the same order as they are listed in the Agency/Organization List. Table 1V-2. Sample A2enev Permits and Certifications Table Agency Permit/Certification Name Date of Date of Issuance Expiration Agency 1 Surface Water Withdrawal Permit Agency 2 Section 401 Water Quality Certification Following the two summary tables, include a copy of all correspondence to and from any local, regional, state and federal agencies or other organizations with which you are required to consult, including any required permits (e.g., Section 401 water quality certifications, Section 404 dredge/fill permits, building permits, etc.) or other approvals or comments which have been obtained from these organizations regarding this activity. Include a copy of any local, regional, state or federal regulations or guidelines that will be followed. All permitting issues must be resolved and clearly documented. Correspondence should be organized in the order the agencies are listed on the Agency/Organization list with the applicant's request for comments followed by additional correspondence in chronological order. All permits must be valid at time of DAe Energy Page 12 of 13 rev 11/22/2021 Excavation Program Duke Energy Excavation Permit Amfication Form application and have a term longer than the projected schedule for completing the permitted project. Part V. Additional Information Provide relevant additional information. Reference previous parts as applicable. Include the FERC-required Environmental Assessment if you were directed to do so during the initial site visit. If there are co -applicants, this is where their information would be provided (see Part I). Duke Energy Page 13 of 13 rev 11I2212021 Excavation Program B37364 - P 491 For Registration Fredrick Smith Register of Deeds Mecklenburg County, NC Electronically Recorded 2022 May 24 11:42 AM RE Excise Tax: $ 3500,00 Book: 37364 Page: 491 - 493 Fee: $ 26.00 Instrument Number: 2022078662 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $3,500.00 Parcel Identifier No. 078-017-12 Mail after recording to: Grantee This instrument was prepared by: David W. Smith, III Attorney — Gray, Layton, Kersh, Et Al Brief description for the Index: Lots 122 & 123 Crown Harbor North Subdivision THIS DEED made this 19th day of May, 2022, by and between GRANTOR: CHIN JEN and wife, I-MEI JEN Address: 4717 Castle Ford Road Boone, NC 28607 and GRANTEE: WILLIAM JAMES GRANT and wife, KELSIE HOWE GRANT Property & Mailing Address: 20107 Bascom Ridge Drive, Cornelius, NC 28031 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Cornelius, Mecklenburg County, North Carolina and more particularly described as foil ows (the "Property"): Submitted electronically by "Gray, Layton, Kersh, Solomon, Furr & Smith PA" in compliance with North carolina statutes governing recordable documents and the terns of the submitter agreement with the Mecklenburg county Register of Deeds. B37364 - P 492 SEE EXHIBIT "A" ATTACHED HERETO; The subject property IS NOT the primary residence of the Grantor. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all priviicges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances and that Grantor will warrant and defend the title against the lawful clairns ofall persons whomsoever except for the following exceptions: I . Ad valorem taxes for the year 2022 and subsequent years, not yet due and payable; and 2. Utility easements and unviolated covenants, conditions or restrictions that do not materially affect the value of the property. IN WITNESS WHEREOF, the Grantor has caused this General Warranty Deed to be duly executed as of the day and year first above written. GRA OR: (SEAL) CHI EN STATE OF NORTH CAROLINA COUNTY OF Alp, 1(Ijo,, lw,, (SEAL) I-MEI JEN 11 u , a Notary Public of the County and State aforesaid, do hereby certify that CHIH JEN AND WIFE, 1-ME1 JEN, Grantor(s) either being personally known to me or proven by satisfactory evidence (said evidence being Ne ), personally appeared before me this day and acknowledged the execution of the foregoing instrument. Witness my hand and official seal, this 70 day of May, 2022. Notary Public /] Print Name: My commission expires: Official Seal (must be legible) =WILLIAMDES II h Carolina nty s Sep 8, 2026 B37364 - P 493 Mgt 1 fParcef No. 001762261 BEING all of Lots 122 and 123 of CROWN HARBOR NORTH SUBDIVISION, PHASE 1, MAP 6 as shown on map thereof recorded in Map Book 27 al Page 151 in the Mecklenburg County Reg isler of Deeds Office. And also including that certain .037 acre. more or less, parcel as shown on the revision of Crown Harbor North Subdivision as found in Map Book 31 at Page 339 of the Mecklenburg County, North Carolina Public Registry and beginning at an existing iron pn as shown on said map, said existing iron pin located at the intersection of Line 4 and Line 5, also as shown on said map, and running thence with Line 4 as shown on said map, said Line 4 being also one of the lines of Lot 123 as shown on said map. N 75.14-33 E. 40.57 feet to a nail set; thence leaving the line of said Lot 123 and running with Line 12 as shown on said map, S 18-46-02.2 E 5.27 feet in Line 7 as shown on said map, S 46.16.27 E 37,88 feet to a nail set, said nail being also in one of the Was of said Lot 123; thence with Line 6 as shown on said map and one of the lines of said Lot 123, S 80- 51.33 W 37,62 feet to a new iron pin; thence with Line 5 as shown on said map N 21.16.27 W 39.70 feet td the point and place of beginning, and containing .037 acre, mre or less, all as per survey of Graylon W. Pippin, N.C.P.L.S. And also including that certain .105 acre, more or less, of land designated as "Area to Lot 122' as found on the map of the Revision of Crown Harbor North Subdivision as found in Map Book 31 at Page 339. said tract adjoining Lot 122 on two sides, Lot 123 on one side, and that certain properly designated as "Area to Lot 129' on one side, and with "side designated Line 14 on said map being very dose if not on the borders of Lake Norman. And also including that certain property shown on the final subdivision plat of Phase I Me 6 Crown Harbor North Subdivision recorded in Map Book 27 at Page 151 of the Mecklenburg County Public Registry and more particularly described as BEGINNING at a point located in the right of way of Bascom Ridge Drive said point" the northwest corner of Lot 123 as shown on said map; and thence from said point and place of Beginning. North 23-43-31 West with the arc of a curve to the left having an arc radius of 45 feet and a chord of 26.12 feet, a distance of 26.51 feet to a 0 n I located in line margin of the public right of way of Bascom Ridge Drive; thence North 49-24-01 East 15,27 feet to a point; thence South 40- 35-59 East 25 feel to a point; thence South 4W24.01 West 22,65 feet to said point and place of Beginning. Title Reference' See Deed Book 9436, Page 609 in the Mecklenburg County Public Registry. "t 2 Warcal bl on17s22a', All that cenain tract of land being oesignated as "TOTAL AREA = 0.490 ACRE, more or Iess' as shown on Duke Energy Corporation survey entilled.'Property Owned by Crescent Resources, Inc„ Cowans Ford Deve"ent. Being Portion of Mary Gordon Kelly Tract, UM1.973. Lemley Township, Mecklenburg County, N,C.," dated April28. 1998, revised May 2, 2000. and recorded as an attachment to that Special Warranty Deed recorded in Deed Book 11543 at Page 532 in the Mecklenburg County Register of Deeds Office. Title Reference: See Deed Book 11543, Page 532 in the Mecklenburg County Public Registry - BEG INNI NO at a point said point being the Northeast corner of Lot 44 of Phase I, Map 3 Crown Harbor Subdivision as shown on Map recorded in Map Book 26 at Page 739 of the Mecklenburg Caunlyy Public Registry and from said point and place of BEGINNING; thence N .72-33-32 W. 40,92 feet to a new pin Set; thence N. 57-41-32 W. 139,30 feel to a new pin set; thence S. 71-14.28 W. 104.90 feet to a now pin set; thence S- 62.54-28 W. 47.70 feet to a new pin set; thence N- 73- 25-32 W. 56.00 feet to a new pin set; thence, S. 44.25-28 W, 47.00 feet to a new pin set thence N. 11-07-32 W. 66,30 feet to a new pin set; thence N. 42-14-32 W. 92.60 feet to a new pin set; thence S. 7W1-28 W. 95.00 feel to a new pin set; thence N. 89-40.32 W. 73.00 feet to a new pin set the N. 12-21-28 E, 102.40 feat to a new pin set; thence N. 66-53-28 E. 41,20 feet to a new pin set; thence S. 88-01-32 E. 58.40 feet to a new pin set; N. 04.45.28 E. 63.80 feet to a new pin set; thence N. 14-22-32 W. 73.60 feet to a new pin set; thence S. 80-53.28 W. 41.10 feet to a new pin set thence N. 21.14-32 W. 39.70 feet to a new pin set. thence N- 76-16-28 E. 47.80 feet to a new pin set; thence N. 16.39.32 W. 40.40 feet to a new pin set; thence N. 54.17-32 W- 10,80 feet to a new pin set; thence S. 89-16-28 W. 69.10 feet to a new pin set. thence S. 86- 36.28 W. 117.40 feet to a new pin Sol; thence S. 79.20-28 W. 146,50 fees to a new pin set; thence N- 30-13.001-. 273,60 feet fa a new pin set; thence N. 30-25-00 F= 377.40 feet to a new pin set thence S. 53-47-00 E. 921.60 feet to a new pin set thence S. 69-19-00 E. 85.17 feet to a new pin set; thence S. 23-24-35 W. 537.89 feel to the point and place of BEGINNING and containing 13.69 acres, more or less. LESS AND EXCEPT 1.904 ACRES which is a poti ion of the property mnveyed in deed recorded in deed look 8241 at page 142 in the Mecklenburg County Public Registry and more particularly described as follows BEGINNING at a point said point being the Northeast corner of Lot 44 of Phase 1, Map 3 Clown Harbor North Subdivision as shown on Map recorded in Map Book 26 at Page 739, of the Mecklenburg County Public Registry and from said point and place of BEGINNING; thence N. 72.33.32 W. 40,92 feet to a new pin set; thence N. 57.41-32 W. 139.30 reef to a new pin set; thence N. 21-39.16 E. 539.59 feet to a point; thence S. 53-49-W E. 79.85 feet to a point; thence S. 6941-08 E. 85.17 reel to a point; and thence S. 23-72.27 W, 537.69 fees to the point and place of BECANNIING. Grantors herein reserves an exclusive perpetual easement, appurtenant to Lot 124, to erect, maintain and ulilize a private pier and gazebo Over and across the property being conveyed by this Warranty Deers. This easement shall benefit the successors in title of the property being conveyed by this Werra nty0eed end Shalt tre binding upon Iha successors in title of Grantee. The pier and gazebo referred to herein shall be located contiguous to the northern boundary line of Lot 124 as shown on the final Subdivision plat of Phase 1, Map 6 Crown Harbor North Subdivision recorded in Map Book 27 at Page 151 (hereinafterreferred to as "Lot 124') and further shall be located between the northwest comer of Lot 124 and the northeast comer of Lot 124 and shall extend a distance of no more than 100 feet north into the property being conveyed by this Warranty Deed and shall have a width of no more than 30 feet t"Easement Area). LAKE NOR11dAN �$` p{N1HIyM, f 6 DA Y W.LONG.P. .w 01 d , 16335 OLD STAT86ViLLE OAP s* 2 " g WE— A �i O I7 g CORN&IUS,IN.C. 26031 Oq SLf Y; ►Z` (704) 765.5134 iy Yi �W •LINE L w- v1cIx�f u+uP WARM., DISTANCE ADDITIONAL REFERENCES: Li s 49,33,05,S La N awes 6 It 2zeelMAP BOOK 31, PG 39 I. xn xoDs MpNnMENr ,,,,,41„1L 3 s 5 9 2 E {O, } MAP BOOK 27, PG 151 FOUND W1TH1N 2(w. serore ea.now 6 g DEED BOOK 24281, PG 566 s rcerORE DEED BOOK 11127. P6234 1PROPERTY MAY BE, I@ SUSLT 19'38 23 E 5.27 TO OTH ER COVENANTS, L 31 448 37411 _ N E 46 RESTRICT IONS, FJ�5Rh4Ei+'1'S ` �4 L9 q}7 43 75.80 OR RTOHT"F-WAY THAT 5 03� 6 Yf 6a4t F ADJOI B 5PI G 88 ELOPE MAY BE OF TIECORD- � {l 3. SETBACKS SHOWN ARE PER EEO 002.762-99 V .LSB. 13. Pa. W. "UNDERWATER' t ' CNIKJEW 4, A PORTION OFTHE TPRf I•LAEI 7EN PROPERTY LIES IN A SPECIAL . _ ruii lax.S8 DB 1k143, PG 037 FLOOD HA7.ARDAi FA 1 ACCORDSNOToFEMAFLOOD 4Lr 1 PANEL MAPS, HOW BVERTI1E PRTNCtPAL S•fRUCTURR Is HELD LOCATED ABOVE AND BEYOND THE ~ 760' LAKE CONTOUR SPECIAL FLOOD HAZARD] So,[e� DATUM: NVGD 29 AREA PER FF.MA PANE MAP 37104MO0K; DATED 3RI2009, 5. CONSULT WITH GOVMN1NG w _ AOENCY FOR PRFVAILTNO� 'S (•�j: LA100 DEVELOMiENT AND �2• ¢�j�7N��' c ZONING REQU I RF.MENTS [em ' C� PRIOR TO N OR CONS'YC!nQNOF ANY • �• 'r rerwwrieeeuNerEx ��^ I1.tPROVF.JrVEMU 1IINTS35, Epp �� � a Nnim.atsAxrn C . It_ FIELDGiW EY OOI-782-24 x ar �Y�r DB 11543, PG 532 � • � L L3- 1 001.762.23 ROSIN E. SURANE m y C¢ 06 1161L PG 895 TOTAL j AREA I ` l , FT. 4906 I 49062ACAC RE5 001.762.28 iryrl jl ` �� MY WENDYRILEY D5 3528, PCt 534 U �Ni , Graphic sc+lc � � , 40 20 ❑ aD n V Saaic of 3lgg I ].eh ado Foes O6 001-762.27 COPY BARTER LE:OEND: SARA BA%TER .per DB 35655, PG 997 FOUND $AR `5COMPUTED PON7 a�RHVAC �B 11GNT POLE i} a6 i 4 ' ELECTRIC BOX �1 } , 2 37 s 'a it E SUBJECT PROPERTY LINE — — .5 45.00 i. N 591333 E ADJDENER PROPERTY LINE 43 0 5 1 RUILDING SETBACK erkjA nnnn k— �p IPhysical Survey of Lot 122 & 123 of Crown Harbor, Phase 1, Map 6 (Revised) Professional Prorpe Recordcd in: site Address. ► o s, Inc.As Inc.Road Property of- Map Book 33, Pg 365 20107 Bascom Ridge Drive 18333 pld Statesville Ste. A Will Gmnt Deed Book 8998, Pg 460 Cornelius, NC 280S1 Cornelius, N.C.28031 704-765-5134 Phone/Fax Deed Book 9436, Pg 609 Mecklenburg County Firm Liomsc C•3656 M2522-01 5ML x 131.0 010 1"a40' 001-752-26 File Name 1 of I 4l28l2022 ]n17N°. �- Ett°r of Closure Drawl Seale Tax i'ercei?dumlra t]rawin Flier N,i , umber Dma KE NOR.hf.AN Graphic Soak su as o so Scale of Draving i inch - 50 Fat ►.1i �F��164iSh I i i�:�:� �]I1��[+7'b: 1•)■ �d:t+i W-1 tl:Z�i� s� bd MAGNAIL SEr ON !RANGY SA'ONLINE '2! &FIER Dk h;[Iy 5lgned by D- _ .J. LDrq 11NM11 H CARll Prok"onel Property Surveyors• Ir1a. B1 OM O¢{K` 2 aWi DARYTW" LOt3O, P. k8335OLD STATESVILLP.ROAD S yea SUrIE A CORNBUUS, N.C. 2801 4q (704) 765-5134 pry yy • V 11141114 ADDITIONAL REFEREAiCES: MAP BOUTT79U ass MAP BOOK31, PG 39 MAP BOOK 27, PG 151 DEED BOOK 24221, PG 566 a + DEED BOOK 11127, PG 234 sj xr 4 x �d► "UNDER WA WiLUAM J. GRANT _ NELSIE H. GRANT AT7}'�7fFR'S PIER ENVELOPE 06M64,PG491 {� MB51,Pr. as fed. `� "�� � � • �,�� _ � �� FIELD LOCATED 760' LAKE CONTOUR DATUM: NVGD 29 f ` "oi -- \�. `� \' '•�7 � FIELD LOCATED 760' LAKE CONTOUR DATUM: WGD 29 . i 1' / rl ' OEM--\� �r.. ,i'�R'J•� a .Y ROBIN E. RIRANC �� DID 116111 M 995 � +1 ! ! � - M1 � C• MA F1r1RPUNE PER �s -?IDAi1�WlJ-q7'62.24 M him eaio�cwTSEo % 2I,8 7S]'k'!.'�f•_gpE� � ~`� i 1 't t, �tONf'AP R, 01 ACRES 'AySq� us d "i a / M=� � r � -- f ...ldS� ��•'.\:. ➢➢1-762.26 N • e _ MICHAEL P. RILEY WENDY RILEY i, f{ ,f •ql.• - 053528, PG 534 .N4 f _. ' ' y •5 V , , 1.NONCORMONUMENT FOUND WITHIN VWD VFRTICA1.INFORMATION FM TM PROIBCr WME POROUCFA WTH VRS GPS CEISERVATME ANC PROQBSa '6!t , AACCURACYY ED OF TUC rrH VRs DERIV ➢YOsl1.71O AI, nl¢A4 �'OR TS OKTS GAP NETWORK rAN 001 762.27 St RV aY CI.AM WEST8 OR RXCEF.D CLASS C. VEIVnCAL DATUM USAI CORY BAXTER NAVDBR. SARA BAITER DR "655, PG 897 L PROPERTY MAY BE SU&fECT TO OmR COVENANTS. RFmRIC MHS, TBMI EASEMENTS OR RIOIIP15-0E-WAY TKAT MAY BE OP RECORD 601) MAGRAIL ELEV•7188 35' 3" SETBACKS SHOWN ARE FFRMB.33, M S65. LEGEND: FOUND RREEBBAR OI PUTEO POINT ® , • LLIIGHT POLE ELECTRIC BOX SUBJECT PROPERTY LINE ADJDINER PROPERTY LINE BUWNG SETBACK — — - FEMA FS.000 UNE--- SEWER EASEMENT C A PORTION OF THE PROPERTY LM IN A FA-ECIAi. FLOOD HAM" AklL ACCORTDNLI TO FEMA FTAOD PANEL MAPS- HOWEVER THLET%OICMAL STRZMTLME IS ABOVE A140 BRYOMD THE SPRtiIAI. FLOODTIALARD ARIi PER FEMA PAN- LEAP 371046U05K: ELATED 3+92f2U04. 3. NO RESIDRNTW, STRIJCrUk]' PERMANENT OR TO&CRARY MAY BE CONSTRUCTED OR 3R=ED ON PID M-362.24. K RAB 1154%1G 531. 6. PID M]-762-24 MAY NOT BE DIVIDED TO CREATE AMMONAL LOTS( PARCELS PERM 11543.PO 351. 7, CONSSJLT Wrlli OOVPRNRIO AG1ti1 O FCR-PRHVAU,1NO LAND DRVEL08b4@7C AND Y.O DREQUIRF]MI-IiB PRIOR70 DESIGN OR CONSTRUCTION OF ANY MVAOVtir1EP7CS. Topographical Survey of Lot 122 & 123 of Crown Harbor, Phase 1, Map f (Revised) & PID # 001-762-24 Former Crescent Resources Inc. Tract professional mperty Property of: As Recorded in: Site Address: ► Surveyors, Inc. p ' Map Book 33, Pg 365 20107 Bascom Ridge Drive 18335 Old Statesville Road Ste. A William & Kelsie Deed Book 8988, Pg 460 Cornelius, NC 28031 Cosnetius, N.C. 28031 Grant heed Book 37364, Pg 491 Mecklenburg County 704-765-5134 Phone/Fax Firm License: C•36M 042522-01 JA+C 1:10 U00 1"=50' 001.762.26 TOP0 1 of 1 6�0/2022 naror 5rroriasure IhAwina 3caln Tax cell NLLv-oer Drawiie HumC net Nulnba �� THE INFORMATION CONTAINED IN THIS DRAWING fS THE SOLE PROPERTY OF LANCASTER'S DOCK& LIFTS SYSTEM INC. ANY REPRODUCTION W PART OR AS A WHOLE MTHOUT THE WRITTEN PERMISSION OF LANCASTERS DOCK & LIFTS SYSTEM INC. IS PROHIBITED. ALL DIMENSIONS USED IN THIS DRAWING ARE NOMINAL c 49-0" 20'-o'Fb C2 N 4' 0" — 34'•0' \N' -1l ,r-P-9uiVT 8 61 apes ISSUE CLIENT 10-16-23 William and Kelsie Grant Q Lancaster Custom Dock and Lifts u DRAWN 9Y 20107 Bascom Ridge Drive 1156 Perth Road Troutman r M.H North Carolina Cornelius, N.C. 28031 Ii] t4� %A :7 tO DUKE ENERGY DIRECTIONS BY ROAD FORM Lake Use Permit Applications and Contractors: Ease of locating a proposed project site can have a big impact on permitting processing time. Please complete this form and return it along with your completed application to: DUKE ENERGY CIO LAKE SERVICES — EC 12Q 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 Applicant's Name: William Grant Street Address tat lake): 20107 Bascom Ridge Road Lake Name: Norman Subdivision Name: Crown Harbor North Phase 1 Property Section: Map Section 6 City: Cornelius State: NC Directions (from major road or highway): Lot #: 122 County: Mecklenburg Zip Code: 28031 From 1-77 NB, Exit 28, Turn left onto Catawba Ave. WB, Turn right on Torrence Chapel Road, Turn right on Schooner Dr., Turn Left onto Crown Lake Drive, Turn left onto Bascom Ridge Road. Property is at the end of the cul-de-sac to the right. Descriptive Structure(s) on Property (i.e. brick garage, white fence, mobile home, etc.) Note: Please use the back of this form if desired to draw us a map to the site. 20107 Bascom Ridge Road Cornelius, NC 28031 oil Sabi Asic Bisti C D N 0$ z� y, t Parham Gateway Park Lake Norman sMaps Legai CRM ■ Deg ■ DM5 Help D UKE IENERGY DIRFCTIGNS BY ROAD FORM LANCAanR CUSTOM DOC= DrsP.,, S,,. Lake Ilse Permit Applicants and Contractors: Ease of lacatin the r site csnhawa big imps as proposed l�roj ect return it along with your compllee�ted applicatioMcen to..ing Lime. Please eaMpleie this farm and DUKE ENERGY C/o LADE SERVICES — EC 12 Q 526 SOUTH CHURCH si'i iir CHARLOTTE, NC 28202 Applicant's Name: IkW Address (at lake): 1162 ltiv ' hwa M N 28117 Lake Name: Subdivision Name: Bi Prop" Section: Lot #: City: o Mile County: State: --�� 71p: Z Telephone _ OS Directions (fmm major road or highway): From 1-77 NT3, Exit 36, Lett onto NC- 150 WE, Disposal Area is an the right behind Big Daddy's Restaurant Complex. Descriptive Structure(s) an Property (i.e. brick garage, white fence, mobile home, etc.) *Note: Please use the back of this form it dent and to draw as a map to the site. 1162 River Highway Mooresville,NC 28117 0 250 5o0 750 ft� mmmb� ms . € USTIC WAY LN z a 0 3 5.604043, - 80.99 0 286 Drag Me! R BP World 0 c� Foothills Marine d Maps legal of Lake Norman Performance Hitch and Trucl Accessories CRM ■ Deg ■ DIMS Help Decimal Degrees Latitude: 35.604043 Decimal Degrees Longitude:-80-910286 Clear Show Point DUKE Lake Services ENERGY® Duke Energy EC120 1 526 South Church Street Charlotte, NC 28202 Mailing Address: EC12Q j PO Box 1006 Charlotte, NC 26201-1005 Pro' ected PrODerty Line AnDroval Letter L i (Print Name) ^` ► owner of Lot # j in Subdivision HA :iS'Cr,- give approval to W I W - _ -�y r )7 , (Print Name) owner of adjacent Lot # in Subdivision -O CD vAN f'a, - to encroach over the projected property line between our lots for uses that are checked below: 0//Dock ❑ Dock Cable Anchor Dredge WAWRA� arlu-2O (DM) ()PaVLAK9MGMTlf2ekage iarmMionlProiWed Pmperry Line Approval Letter dae www.duke-enerFy.com Project N2rne/address., . q �, NL laeat o R dress: re i t wb V r Parcel #. 4 �,p,3g Parcel/lot size rc Disposal area required (sq ft Omd/or acreage) ,4ck 7 r-, pe►nent of N00f cation r files bu �P —1 V�County: �re C-54 ! P r S4 y.- and rules regarding sedl ent and erosio ❑ntrol and wateram 1"Ware hauality51And g Ve pete rn ere to ali $ state regulations r Name of Individual and Company to dispose of their dredge material at the above stated location Owner: ►. � , f Ir a v 1 �s _ n _� _ A rZ x O� Print Date: Jam- �JS18n�aure Along with form, please provide: Aerial of parcel/lot (County G15) Photo of proposed spoil site Identified proposed spoil site M r 00 '4- CV co N Cl N 0? r+r.1 V �I ❑ ►'. r. 4 En ..r. IN V 41- 97 OIL AQlw u� r THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF LANCASTER'S DOCK & LIFTS SYSTEM INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHQUT THE WRITTEN PERMISSION OF LANCASTERS DOCK & LIFTS SYSTEM INC. IS PROHIBITED. ALL DIMENSIONS USED IN THIS DRA WIN(: ARF MOMIM AI ISSUE CLIENT 10-18-23 William and Keisie Grant DRAWN BY 20107 Bascom Ridge Drive M.H. Cornelius, N.C, 28031 Lancaster Custom Dock and Lifts 1156 Perth Road Troutman North Carolina ti THE INFORMATION CONTA fNED IN THIS DRAWING IS THE SOLE PROPERTY OF LANCASTERS DOCK& LIFTS SYSTEM INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF LANCA STEPS DOCK & LIFTS S YSTEM INC. IS PROHIBITED. ALL DIMENSIONS USED IN THIS 6RAWAG ARE NOMINAL issue CLIENT D 10-18-23 William and Kelsie Grant Lancaster Custom Dock and Lifts IjDRAW MA. N BY 20107 Bascom Ridge Drive 1156 Perth Road Troutman J 'HCornelius, N.C. 28031 North Carolina CUSTOM DOCK & Ll THE INFORMA TION CONTAINED IN THIS DRAWING IS THE SOLE PROPER TY OF LANCAS TER IS DOCK& LIFTS SYSTFIN INC. ANY REPRODUCTION IN PA RT OR A A WHOLE WITHOUT THE WRITTEN PERMISSION OF LANCASTER'S DOCK & LIFTS SYSTEM INC. IS PROHIBITED. A LL DIMENSIONS USED IN THIS DRA WING ARE NOMINAL . . 1 � ' - ti S - '� [ • �. II'�_AT �' i er .. !I-V 1 • g. F �J '1iC�Vh 411 •1' • a""-� A:i. .•' K Y 1. Yf > �i ISSUE CLIENT ■ 1 i}18-23 William and Kelsie Grant Lancaster Custom Dock and Ufts {� DRAWN BY 2-0107 Bascom Ridge Drive 1156 Perth Road Troutman r M.H. North Carolina Cornelius, N.C. 28031 W, N 1 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTYOF LANCASTER'S DOCK& LIFTS SYSTEM INC. ANYREPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF EANOASTERS DOCX & LIFTS SYSTEM INC. IS PROHIDITED. ALL DIMENSIONS USED IN THIS ORA WING ARE NOMINAL a issue CLI ENT 0 23 William and Kelsie Grant Lancaster Custom Dock and Dfts F+ °RAIIN BY 20107 Bascom Ridge Drive 1156 Perth Road Trautman M.H. North Carolina Cornelius, N,C, 28031 W TV W fV fV THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPER T Y OF LANCA S TER'S DO( ►A& LIFTS SYSTEM INC. ANYREPRODUCTION IN PART OR AS A WHOLE UVITHOUT THE WRITTEN PERMISSION OF LAN CASTER'S DDCIC & LIFTS SYSTEM INC. IS PROHIBITED. ALL DIMENSIONS USED IN THIS DRAWA;G ARE NOMINAL ISSUE CLIENT 10-1&23 William and Kelsie Grant DRAWN 6Y 20107 Bascom Ridge Drlve M.H. Cornellus, N.C. 28031 Lancaster Custom Dock and Lifts 1156 Perth Road Troutman North Carolina M1] it 4 IL )N: LAr 2 ANN- -7 77 Jw. Ok_ ; '� r'• iffic" .. - 1 � i le, - r ��.I'� is •.:;!+. -i• � �.� -� `?� f-4�r�,,' . r / � t�k^..4 � �fC•� �� �rtS .��`- ,.Sf � _#fie 1 •y. ..S «�•�'��L s y now — �Wrdwmw AGENT AUTHORIZATIrON FORM PROPERTY LEGAL DESCRIPTION: LOT NO. _ 122 PLAN NO. PARCEL ID. 00176224 STREET ADDRESS: 20107 Bascom Ri a Drive Cornelius. NC 28031 Please print: Property Owner: _1Nilliam Grant Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Donna P. Hrko of (Contractor J Agent) Lancaster's Custom Dock and Lift Systems, Inc. (Dame of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: 336--906-0665 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized SignatKY Authorized Signature 9/25/23 Date: Date: Project Namefaddress: Owner: t 1 1 Print Contractor/agent: TAWBR RIPARIAN BUFFER NOTIFICATION FOR Print jj nZU,07&5co►r, Rid Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 028 ,0243(8)j Trees are not allowed to be removed from Zone 1 of the Suffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 028.0243(6)1 Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 028.0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 028.0243(5), (5)] Acknowledgement of Notification f vIl T hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date. Proposed (Plan View) ,' slopes Z7� + 5` La ke -4 J(Full Pond/ Normal Water Level) Full Pond/ Normal Watervvel Shoreline 150, .5o x I 5C0 s� ll C`rl`x� Lake (At Full Pond/ Noftnal Water Uvel) Existing Deck 3U ft x' ff 3ftx350ft Full Pon dj Normal Water Level Below full twndl NWL Rio etiine afcxisan Rlprap Above full Pond/ NWL 2 ft.x150 ft. additional clearing • If necessary E AMPLE Plan View Proposed (Side View) La ke t, (At,l ull Pond/ Normal ter Level) i 3 3 f[. below full pond waterlevel 4 ft. above full pond water level 2 ft. additional clearing •if ne[emry Existing bank iD W hank a height Qc�e Q Side ViEw MPLE Duke Energy Lake Services Guidance for Completing an Excavation Permit Application Note: If you are proposing excavation in association with the permitting of a new or expanded facility under the Marina or Conveyance Programs, you do not need to complete this application. Instead, you should incorporate the excavation request into the permit application for the marina/conveyance using the appropriate application. Step 1: Contact Duke Energy Lake Services Complete "Part I" of the application and develop a drawing of the proposed excavation area. Contact Duke Energy Lake Services to schedule a site visit. Lake Services will conduct a site visit to determine if Duke Energy will accept an excavation permit application for the proposed work. If the Lake Services representative determines the application process may proceed, he/she will initial Part I of the application. Step 2: Draft Application Development Complete Parts II-HI.A-G and Part V of the Excavation Permit Application, Step 3: Agency Consultation Send the draft application developed during Step 2 to the agencies for review and comment on the proposed activity. Refer to the Agency / Organization List available from Duke Energy to determine which federal, state, regional, and local agencies and organizations require consultation or review, Note. Duke Energy reserves the right to require consultation with additional organizations beyond those included in the Agency / Organization List. Each agency / organization must be provided at least 30 days prior notification. Evidence must be provided (e.g., response letter or Certified Mail receipt) in the complete application to show each agency / organization was given the opportunity to review the proposal. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. All permits must be valid at time of application and have a term longer than the projected schedule for completing the permitted project. What to Expect During Agency Review and Comment: • You will typically receive a letter from each agency / organization either documenting its concurrence with your proposal, requiring additional information, recommending modifications, or offering no comment, You must address each agency's / organization's comments with a follow-up letter and in your final application as described in part IV. • If you do not receive any documentation from an agency / organization within 30 days of its receipt of your proposal, you must provide the agency / organization with a follow-up letter requesting comment on your proposal within 15 days from the date of the follow-up letter. If you still do not receive any response as a result of the second letter, type "NO RESPONSE" Duke Energy Page 1 of 13 rev 1 ]raarai Ueavation Program at the top of the follow-up letter and include it in the application along with proof of the agency's 1 organization's receipt of the letter (e.g,, Certified Mail receipt). You may proceed with the application process recognizing, however, that if its comments come later in the application process, you will be required to address them. From the United States Army Corps of Engineers (Corps): (** Note — The Corps may have additional forms to submit for your proposal and an additional fee.) If the excavation can be done under the requirements of the General Permit (GP) or a Nationwide Permit (NWP), you will typically receive a copy of the Corps' tear sheet documenting authorization and providing any additional instructions. If the excavation isn't covered under the GP or a NWP, you'll be required to obtain an individual 404 Dredge and Fill permit from the Corps. You roust receive written documentation from the Corps that your application either (1) meets the requirements of the GP or a NWP or (2) the proper 404 Dredge and Fill permit has been received before Duke Energy can process your application. From the North Carolina Department of Environmental Quality (1VCDEQ), Division of Water Resources: (Note NCDEQ may have additional forms to submit for your proposal and an additional fee.) If the proposal meets the requirements of the Clean Water Act Sect. 401 Water Quality Certification, you will typically receive a letter from the NCDEQ Division of Water Resources documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter requiring additional information or recommending modifications. You must receive written documentation from NCDEQ noting any required Sect. 401 Certification has been received before Duke Energy can process your application. ■ From the North Carolina Wildlife Resources Commission (NCWRC): If you do not receive any documentation from the NCWRC within 30 days of their receipt of your application, you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application process, you will be required to address them. From the South Carolina Department of Health and Environmental Control (SCDHEC): (Note — SCDHEC may have additional forms to submit for your proposal and an additional fee) The SCDHEC conducts a joint application process with the USACOE in S.C. If the proposal meets any applicable requirements of the Clean Water Act Sect. 401 Water Quality Certification, you will typically receive a letter from SCDHEC documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter from USACOE requiring additional information for the agencies participating in the joint application process, You must receive written documentation from SCDHEC noting Sect. 401 Certification has been received if required before Duke Energy can process your application. ■ From the South Carolina Institute of Archaeology and Anthropology (SCIAA): The applicant must wait 30 days after receiving the signed postal returned receipt. If a response from SCIAA has not been received by this time you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application review process, you will also be required to address them. Duke Energy Page 2 of 13 rev 1 i12M t Excavation Program Step 4: Final Application & Submittal to Duke Energy Following the consultation process, finalize the application. The final application submitted to Duke Energy should incorporate all comments and recommendations provided by agencies and organizations during the agency consultation process as well as copies of all permits received. In addition to the final application include the following; ■ One check payable to duke Energy for the application fee and security deposit • If applicable, a separate check payable to the appropriate Habitat Enhancement Program fund • Signed Excavation Program Applicant's Agreement Note. Co -applicants must also submit the application fees and applicable HEP fees with the application. Nke Energy Page 3 of 13 rev t Il2212I Excavation Program Duke Energy Excavation Permit AnIllfcation Form FOR DUKE ENERGY usE ONLY Duke File No. Application Fee S Security Deposit $ Check # Date Recv'd Initials Date of Duke Energy Lake Services, applicant and/or contractor on -site inspections Datet -t 7 lnitials Date Final Protection/Avoidance Area Markings Field - Verified Approved to Start Work By * {Print) Date Completion Required Date of Any Approved Extension Date Passed Closeout Inspection* Initials Initials Date (sign) Initials Any Stop Work Orders or SMG Violations*? (check one) ClYes ❑No (if Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval better and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Orders with application. Part I. Applicant Information [Please Print] Name r Telephone -&1 Email address: W 1 �r 31 ro di 1. CO YY]_ Ll o R ire rywaVEA n �� Contractor Company Contractor Contact Person Contractor Email Address: Mailing Address (if different) 1k11■ . i Telephone i ' .■9. 8f \ f — ■ ■ CAP CWz b ■■+ it •i LAKE LOT INFORMATION Lake �rr � County htmb�ity li State Tax Map No, QQ / Subdivision r Lot 1 Section No. % Lot Size / % Acres Duke Energy Page 4 of 13 rev I V22/2I Excavation Program Dune Enerav Excavation Permit Application Form Security Deposit Refund Information The security deposit will be refunded after the excavation permit has expired if no violations of the approval occurred. The applicant will receive the security depost refund at the mailing address in Part I unless an alternative recipient is identified. Send the security deposit to an alternative recipient? (check one) Tdyes ONO (If Yes, include name and mailing address below. Name: Y' �e�d Tax ID: 6 + ?J Mailing Address: _zLf rM17a �ou�-Yrr�rr , f11 C 2B�lflla Are there any Co -Applicants*? (check one) Oyes ZKo (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners I lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection Q 7--1 Z a Initials (Duke Energy) '%_ (applicant/contractor) C� Duke Energy Page 5 of 13 re„ I1i2MI Excavation Program Duke Enerizv Excavation Permit Application Farm Part II. Description of PrNect A. Basic Information 1. Type of excavation: (check one) ❑ New excavation O'Maintenance excavation 2. Purpose of excavation: (check one) ❑ Water Intake Channel ❑ Other (sped): 3. Lake user category: (check one) ❑Commercial Marina ❑Other (spec): Otoat Access Channel ❑ Wastewater Discharge Channel A frivate ❑Residential Marina ❑Public � 1 � 4. Max. Excavation Area Dimensions (ft): Length Width 5-1 Depth I� (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in #4) 5. Volume of Excavated Material (TOTAL for the project): r, L9 _Cubic yards 6. Type of material removed Capplicant determines by.fteld sample iractica : 7. Excavation Site area: Acre (s) Disposal Site area: s6G Acre (s) S. Total Disturbed Area (including equipment staging urea): ,� Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) ,dyes ONO 10. Do you claim title to the disposal area? (check one) ❑Yes J:2No 11. Do you claim title to the equipment staging area? (check one) ,OYes ❑No 12. Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) ❑Yes '0�io (If Yes, spec): 13, How will the excavated material be entrapped and the erosion controlled? (e.g. see attached erosion controlplan and disposal area design): �-ed e. w l+lrl bi reach eaCm� r Iacp— ynq}er i cc 1s in h o p � ba es 1,�►LL40mcq b�`� e� - po loo�d ��taciux,�p *Ut��s and ct for { fS d'k -, - -, n ---,o I C-, 1 U2 Duke Energy Page 6 of 13 rev 11127J21 Excavation Program Duke Energy Excavation Permit Application Form 14. Type(s) of excavation equipment to be used: Lo-�qq r cox_Vl ejca\jix mv-, Short r ea c11 excrcvaj-or', �nru V,5. rgea 'k Puyn P 15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) X'es ❑No I es, explain) bred In equlpmevi%r' C'.t-will be, rc�� � ore via Imfin4 pignf' t., . m CaS+rm 1bocv� o� ce E6+g3jA GLY',eCx rds5 r �r t 16. Will return water re-enter the reservoir? (Check one) ❑Yes ❑No .b�4/A (If Yes, vecifY point(s)of re-entry and show on Excavation Area Drawirr) % 17. Is there an existing facility (e.g. pier) that access is being maintained to by conducting the excavation? ❑Yes UNO New L�c�S �a �e eons i-u c�cd (If Yes, provide the existing permit number. If No, include a scaled drawing of the proposed facility). Permit # 18. Total planned duration of the work (Include f rst equipment mobilization, excavation through final mitigation measures complete): START �1 04 FINISH 1 �v (Month) (Year) (Month) (Year) Duke Energy Page 7 of 13 rev t tr22l21 Excavation Program Q b a Q � A v 3 b n Q � V U [n w 0 ON u Duke Enenzy Excavation Permit Alpolication Form C. Applicant's Signatures Comments: Applicant Name (print) �y Applicant Signature*iag, Date 7 Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Date Date Date Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 13 rev 11/22/2021 Excavation Program Duke Eneruv Excavation Permit Application Form Part III. Additional Information A. Deed and Survey Plat: A copy of the deed and registered survey plat or other instrument under which each applicant and co -applicant claims title to the affected property (the shoreline adjoining the excavation area, equipment staging area, area crossed by any spoil and return water lines, and the disposal area). if the applicant(s) is(are) not the owner(s) of said property, then forward a copy of the deed and registered survey plat or other instrument under which the owner(s) claim title plus written authorization from the owner(s) to carry out the project on their land. S. Excavation Area Drawing: An accurate drawing of the area to be excavated. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed excavation area and equipment staging areas; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); property corners for project front lots; the full pond elevation contour and lines dividing the cove width into equal thirds (as applicable); approximate volume in cubic yards of the material to be excavated; point(s) of return water re-entry; the boundaries of any adjoining areas that are to be specifically avoided or protected during the work and the location (address) of the disposal area for the excavated material. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] C. Disposal Area Drawing: An accurate drawing of the proposed design for the disposal area. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed disposal area; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); the full pond elevation contour (unless disposal is well away from the lake); the boundaries of any adjoining areas that are to be specifically avoided or protected during the work; the location (address) of the excavation area from which the material came and a statement of the disposal area's capacity with all dimensions labeled that were used in the volume calculation. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] Also note for projects larger than one (1) acre in North Carolina, including excavated, equipment staging, and disposal areas, you must submit an erosion control plan. For projects larger than two (2) acres in South Carolina, including excavated, equipment staging and disposal areas, you must submit an erosion control plan. For projects < two (2) acres in South Carolina, you must submit a completed standard reportingform for construction sites disturbing two (2) acres or less to the South Carolina Dept. of Health and Environmental Control (SCDHEC) - Stormwater Management D. Vicinity Map and Driving Directions- A vicinity neap and directions by road showing directions to both the excavation area and disposal area. Include the latitude and longitude of both the excavation area and the disposal area. Part IV. Agency Reviews and Approvals Begin this section with a summary table of all agencies consulted and applicant response to agency comments as shown in the example table below. Agencies should be listed in the order Duke Energy Page 11 of 13 rev 11/22/2021 Excavation Program Duke Enera Excavation Permit Application Form shown in the Agency/Organization List. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. Table IV-1. Sample Agencv Comment and Res onse Table A2ency Comment Applicant Response Agency 1 The activity is approved as proposed. INA A&Lncy 2 The on -site well provides drinking water to the Contacted Mr. Smith on 111120xx. No public. Please contact Mr. Smith to discuss the further action needed. proposed changes and potential issues associated with Your prrosal. You must contact us immediately if Applicant will contact Agency 2 if endangered species are located during the endangered species are located during course of construction, construction Azencv 3 Requested agency comments on 111120xx and NA again on 211120xx. No response as of 2116120xx. Azenev 4 Section 401 Water Quality Certification Applicant will comply with the conditions of the 401 Water Quality Certification Following the table of agency comments and applicant responses, include a table of permits and certifications issued by the reviewing agencies. As with the table of agency comments and applicant responses, agencies should be listed in the same order as they are listed in the Agency/Organization List. Table 1V-2. Sample A2enev Permits and Certifications Table Agency Permit/Certification Name Date of Date of Issuance Expiration Agency 1 Surface Water Withdrawal Permit Agency 2 Section 401 Water Quality Certification Following the two summary tables, include a copy of all correspondence to and from any local, regional, state and federal agencies or other organizations with which you are required to consult, including any required permits (e.g., Section 401 water quality certifications, Section 404 dredge/fill permits, building permits, etc.) or other approvals or comments which have been obtained from these organizations regarding this activity. Include a copy of any local, regional, state or federal regulations or guidelines that will be followed. All permitting issues must be resolved and clearly documented. Correspondence should be organized in the order the agencies are listed on the Agency/Organization list with the applicant's request for comments followed by additional correspondence in chronological order. All permits must be valid at time of DAe Energy Page 12 of 13 rev 11/22/2021 Excavation Program Duke Energy Excavation Permit Amfication Form application and have a term longer than the projected schedule for completing the permitted project. Part V. Additional Information Provide relevant additional information. Reference previous parts as applicable. Include the FERC-required Environmental Assessment if you were directed to do so during the initial site visit. If there are co -applicants, this is where their information would be provided (see Part I). Duke Energy Page 13 of 13 rev 11I2212021 Excavation Program B37364 - P 491 For Registration Fredrick Smith Register of Deeds Mecklenburg County, NC Electronically Recorded 2022 May 24 11:42 AM RE Excise Tax: $ 3500,00 Book: 37364 Page: 491 - 493 Fee: $ 26.00 Instrument Number: 2022078662 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $3,500.00 Parcel Identifier No. 078-017-12 Mail after recording to: Grantee This instrument was prepared by: David W. Smith, III Attorney — Gray, Layton, Kersh, Et Al Brief description for the Index: Lots 122 & 123 Crown Harbor North Subdivision THIS DEED made this 19th day of May, 2022, by and between GRANTOR: CHIN JEN and wife, I-MEI JEN Address: 4717 Castle Ford Road Boone, NC 28607 and GRANTEE: WILLIAM JAMES GRANT and wife, KELSIE HOWE GRANT Property & Mailing Address: 20107 Bascom Ridge Drive, Cornelius, NC 28031 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Cornelius, Mecklenburg County, North Carolina and more particularly described as foil ows (the "Property"): Submitted electronically by "Gray, Layton, Kersh, Solomon, Furr & Smith PA" in compliance with North carolina statutes governing recordable documents and the terns of the submitter agreement with the Mecklenburg county Register of Deeds. B37364 - P 492 SEE EXHIBIT "A" ATTACHED HERETO; The subject property IS NOT the primary residence of the Grantor. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all priviicges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances and that Grantor will warrant and defend the title against the lawful clairns ofall persons whomsoever except for the following exceptions: I . Ad valorem taxes for the year 2022 and subsequent years, not yet due and payable; and 2. Utility easements and unviolated covenants, conditions or restrictions that do not materially affect the value of the property. IN WITNESS WHEREOF, the Grantor has caused this General Warranty Deed to be duly executed as of the day and year first above written. GRA OR: (SEAL) CHI EN STATE OF NORTH CAROLINA COUNTY OF Alp, 1(Ijo,, lw,, (SEAL) I-MEI JEN 11 u , a Notary Public of the County and State aforesaid, do hereby certify that CHIH JEN AND WIFE, 1-ME1 JEN, Grantor(s) either being personally known to me or proven by satisfactory evidence (said evidence being Ne ), personally appeared before me this day and acknowledged the execution of the foregoing instrument. Witness my hand and official seal, this 70 day of May, 2022. Notary Public /] Print Name: My commission expires: Official Seal (must be legible) =WILLIAMDES II h Carolina nty s Sep 8, 2026 B37364 - P 493 Mgt 1 fParcef No. 001762261 BEING all of Lots 122 and 123 of CROWN HARBOR NORTH SUBDIVISION, PHASE 1, MAP 6 as shown on map thereof recorded in Map Book 27 al Page 151 in the Mecklenburg County Reg isler of Deeds Office. And also including that certain .037 acre. more or less, parcel as shown on the revision of Crown Harbor North Subdivision as found in Map Book 31 at Page 339 of the Mecklenburg County, North Carolina Public Registry and beginning at an existing iron pn as shown on said map, said existing iron pin located at the intersection of Line 4 and Line 5, also as shown on said map, and running thence with Line 4 as shown on said map, said Line 4 being also one of the lines of Lot 123 as shown on said map. N 75.14-33 E. 40.57 feet to a nail set; thence leaving the line of said Lot 123 and running with Line 12 as shown on said map, S 18-46-02.2 E 5.27 feet in Line 7 as shown on said map, S 46.16.27 E 37,88 feet to a nail set, said nail being also in one of the Was of said Lot 123; thence with Line 6 as shown on said map and one of the lines of said Lot 123, S 80- 51.33 W 37,62 feet to a new iron pin; thence with Line 5 as shown on said map N 21.16.27 W 39.70 feet td the point and place of beginning, and containing .037 acre, mre or less, all as per survey of Graylon W. Pippin, N.C.P.L.S. And also including that certain .105 acre, more or less, of land designated as "Area to Lot 122' as found on the map of the Revision of Crown Harbor North Subdivision as found in Map Book 31 at Page 339. said tract adjoining Lot 122 on two sides, Lot 123 on one side, and that certain properly designated as "Area to Lot 129' on one side, and with "side designated Line 14 on said map being very dose if not on the borders of Lake Norman. And also including that certain property shown on the final subdivision plat of Phase I Me 6 Crown Harbor North Subdivision recorded in Map Book 27 at Page 151 of the Mecklenburg County Public Registry and more particularly described as BEGINNING at a point located in the right of way of Bascom Ridge Drive said point" the northwest corner of Lot 123 as shown on said map; and thence from said point and place of Beginning. North 23-43-31 West with the arc of a curve to the left having an arc radius of 45 feet and a chord of 26.12 feet, a distance of 26.51 feet to a 0 n I located in line margin of the public right of way of Bascom Ridge Drive; thence North 49-24-01 East 15,27 feet to a point; thence South 40- 35-59 East 25 feel to a point; thence South 4W24.01 West 22,65 feet to said point and place of Beginning. Title Reference' See Deed Book 9436, Page 609 in the Mecklenburg County Public Registry. "t 2 Warcal bl on17s22a', All that cenain tract of land being oesignated as "TOTAL AREA = 0.490 ACRE, more or Iess' as shown on Duke Energy Corporation survey entilled.'Property Owned by Crescent Resources, Inc„ Cowans Ford Deve"ent. Being Portion of Mary Gordon Kelly Tract, UM1.973. Lemley Township, Mecklenburg County, N,C.," dated April28. 1998, revised May 2, 2000. and recorded as an attachment to that Special Warranty Deed recorded in Deed Book 11543 at Page 532 in the Mecklenburg County Register of Deeds Office. Title Reference: See Deed Book 11543, Page 532 in the Mecklenburg County Public Registry - BEG INNI NO at a point said point being the Northeast corner of Lot 44 of Phase I, Map 3 Crown Harbor Subdivision as shown on Map recorded in Map Book 26 at Page 739 of the Mecklenburg Caunlyy Public Registry and from said point and place of BEGINNING; thence N .72-33-32 W. 40,92 feet to a new pin Set; thence N. 57-41-32 W. 139,30 feel to a new pin set; thence S. 71-14.28 W. 104.90 feet to a now pin set; thence S- 62.54-28 W. 47.70 feet to a new pin set; thence N- 73- 25-32 W. 56.00 feet to a new pin set; thence, S. 44.25-28 W, 47.00 feet to a new pin set thence N. 11-07-32 W. 66,30 feet to a new pin set; thence N. 42-14-32 W. 92.60 feet to a new pin set; thence S. 7W1-28 W. 95.00 feel to a new pin set; thence N. 89-40.32 W. 73.00 feet to a new pin set the N. 12-21-28 E, 102.40 feat to a new pin set; thence N. 66-53-28 E. 41,20 feet to a new pin set; thence S. 88-01-32 E. 58.40 feet to a new pin set; N. 04.45.28 E. 63.80 feet to a new pin set; thence N. 14-22-32 W. 73.60 feet to a new pin set; thence S. 80-53.28 W. 41.10 feet to a new pin set thence N. 21.14-32 W. 39.70 feet to a new pin set. thence N- 76-16-28 E. 47.80 feet to a new pin set; thence N. 16.39.32 W. 40.40 feet to a new pin set; thence N. 54.17-32 W- 10,80 feet to a new pin set; thence S. 89-16-28 W. 69.10 feet to a new pin set. thence S. 86- 36.28 W. 117.40 feet to a new pin Sol; thence S. 79.20-28 W. 146,50 fees to a new pin set; thence N- 30-13.001-. 273,60 feet fa a new pin set; thence N. 30-25-00 F= 377.40 feet to a new pin set thence S. 53-47-00 E. 921.60 feet to a new pin set thence S. 69-19-00 E. 85.17 feet to a new pin set; thence S. 23-24-35 W. 537.89 feel to the point and place of BEGINNING and containing 13.69 acres, more or less. LESS AND EXCEPT 1.904 ACRES which is a poti ion of the property mnveyed in deed recorded in deed look 8241 at page 142 in the Mecklenburg County Public Registry and more particularly described as follows BEGINNING at a point said point being the Northeast corner of Lot 44 of Phase 1, Map 3 Clown Harbor North Subdivision as shown on Map recorded in Map Book 26 at Page 739, of the Mecklenburg County Public Registry and from said point and place of BEGINNING; thence N. 72.33.32 W. 40,92 feet to a new pin set; thence N. 57.41-32 W. 139.30 reef to a new pin set; thence N. 21-39.16 E. 539.59 feet to a point; thence S. 53-49-W E. 79.85 feet to a point; thence S. 6941-08 E. 85.17 reel to a point; and thence S. 23-72.27 W, 537.69 fees to the point and place of BECANNIING. Grantors herein reserves an exclusive perpetual easement, appurtenant to Lot 124, to erect, maintain and ulilize a private pier and gazebo Over and across the property being conveyed by this Warranty Deers. This easement shall benefit the successors in title of the property being conveyed by this Werra nty0eed end Shalt tre binding upon Iha successors in title of Grantee. The pier and gazebo referred to herein shall be located contiguous to the northern boundary line of Lot 124 as shown on the final Subdivision plat of Phase 1, Map 6 Crown Harbor North Subdivision recorded in Map Book 27 at Page 151 (hereinafterreferred to as "Lot 124') and further shall be located between the northwest comer of Lot 124 and the northeast comer of Lot 124 and shall extend a distance of no more than 100 feet north into the property being conveyed by this Warranty Deed and shall have a width of no more than 30 feet t"Easement Area). LAKE NOR11dAN �$` p{N1HIyM, f 6 DA Y W.LONG.P. .w 01 d , 16335 OLD STAT86ViLLE OAP s* 2 " g WE— A �i O I7 g CORN&IUS,IN.C. 26031 Oq SLf Y; ►Z` (704) 765.5134 iy Yi �W •LINE L w- v1cIx�f u+uP WARM., DISTANCE ADDITIONAL REFERENCES: Li s 49,33,05,S La N awes 6 It 2zeelMAP BOOK 31, PG 39 I. xn xoDs MpNnMENr ,,,,,41„1L 3 s 5 9 2 E {O, } MAP BOOK 27, PG 151 FOUND W1TH1N 2(w. serore ea.now 6 g DEED BOOK 24281, PG 566 s rcerORE DEED BOOK 11127. P6234 1PROPERTY MAY BE, I@ SUSLT 19'38 23 E 5.27 TO OTH ER COVENANTS, L 31 448 37411 _ N E 46 RESTRICT IONS, FJ�5Rh4Ei+'1'S ` �4 L9 q}7 43 75.80 OR RTOHT"F-WAY THAT 5 03� 6 Yf 6a4t F ADJOI B 5PI G 88 ELOPE MAY BE OF TIECORD- � {l 3. SETBACKS SHOWN ARE PER EEO 002.762-99 V .LSB. 13. Pa. W. "UNDERWATER' t ' CNIKJEW 4, A PORTION OFTHE TPRf I•LAEI 7EN PROPERTY LIES IN A SPECIAL . _ ruii lax.S8 DB 1k143, PG 037 FLOOD HA7.ARDAi FA 1 ACCORDSNOToFEMAFLOOD 4Lr 1 PANEL MAPS, HOW BVERTI1E PRTNCtPAL S•fRUCTURR Is HELD LOCATED ABOVE AND BEYOND THE ~ 760' LAKE CONTOUR SPECIAL FLOOD HAZARD] So,[e� DATUM: NVGD 29 AREA PER FF.MA PANE MAP 37104MO0K; DATED 3RI2009, 5. CONSULT WITH GOVMN1NG w _ AOENCY FOR PRFVAILTNO� 'S (•�j: LA100 DEVELOMiENT AND �2• ¢�j�7N��' c ZONING REQU I RF.MENTS [em ' C� PRIOR TO N OR CONS'YC!nQNOF ANY • �• 'r rerwwrieeeuNerEx ��^ I1.tPROVF.JrVEMU 1IINTS35, Epp �� � a Nnim.atsAxrn C . It_ FIELDGiW EY OOI-782-24 x ar �Y�r DB 11543, PG 532 � • � L L3- 1 001.762.23 ROSIN E. SURANE m y C¢ 06 1161L PG 895 TOTAL j AREA I ` l , FT. 4906 I 49062ACAC RE5 001.762.28 iryrl jl ` �� MY WENDYRILEY D5 3528, PCt 534 U �Ni , Graphic sc+lc � � , 40 20 ❑ aD n V Saaic of 3lgg I ].eh ado Foes O6 001-762.27 COPY BARTER LE:OEND: SARA BA%TER .per DB 35655, PG 997 FOUND $AR `5COMPUTED PON7 a�RHVAC �B 11GNT POLE i} a6 i 4 ' ELECTRIC BOX �1 } , 2 37 s 'a it E SUBJECT PROPERTY LINE — — .5 45.00 i. N 591333 E ADJDENER PROPERTY LINE 43 0 5 1 RUILDING SETBACK erkjA nnnn k— �p IPhysical Survey of Lot 122 & 123 of Crown Harbor, Phase 1, Map 6 (Revised) Professional Prorpe Recordcd in: site Address. ► o s, Inc.As Inc.Road Property of- Map Book 33, Pg 365 20107 Bascom Ridge Drive 18333 pld Statesville Ste. A Will Gmnt Deed Book 8998, Pg 460 Cornelius, NC 280S1 Cornelius, N.C.28031 704-765-5134 Phone/Fax Deed Book 9436, Pg 609 Mecklenburg County Firm Liomsc C•3656 M2522-01 5ML x 131.0 010 1"a40' 001-752-26 File Name 1 of I 4l28l2022 ]n17N°. �- Ett°r of Closure Drawl Seale Tax i'ercei?dumlra t]rawin Flier N,i , umber Dma KE NOR.hf.AN Graphic Soak su as o so Scale of Draving i inch - 50 Fat ►.1i �F��164iSh I i i�:�:� �]I1��[+7'b: 1•)■ �d:t+i W-1 tl:Z�i� s� bd MAGNAIL SEr ON !RANGY SA'ONLINE '2! &FIER Dk h;[Iy 5lgned by D- _ .J. LDrq 11NM11 H CARll Prok"onel Property Surveyors• Ir1a. B1 OM O¢{K` 2 aWi DARYTW" LOt3O, P. k8335OLD STATESVILLP.ROAD S yea SUrIE A CORNBUUS, N.C. 2801 4q (704) 765-5134 pry yy • V 11141114 ADDITIONAL REFEREAiCES: MAP BOUTT79U ass MAP BOOK31, PG 39 MAP BOOK 27, PG 151 DEED BOOK 24221, PG 566 a + DEED BOOK 11127, PG 234 sj xr 4 x �d► "UNDER WA WiLUAM J. GRANT _ NELSIE H. GRANT AT7}'�7fFR'S PIER ENVELOPE 06M64,PG491 {� MB51,Pr. as fed. `� "�� � � • �,�� _ � �� FIELD LOCATED 760' LAKE CONTOUR DATUM: NVGD 29 f ` "oi -- \�. `� \' '•�7 � FIELD LOCATED 760' LAKE CONTOUR DATUM: WGD 29 . i 1' / rl ' OEM--\� �r.. ,i'�R'J•� a .Y ROBIN E. RIRANC �� DID 116111 M 995 � +1 ! ! � - M1 � C• MA F1r1RPUNE PER �s -?IDAi1�WlJ-q7'62.24 M him eaio�cwTSEo % 2I,8 7S]'k'!.'�f•_gpE� � ~`� i 1 't t, �tONf'AP R, 01 ACRES 'AySq� us d "i a / M=� � r � -- f ...ldS� ��•'.\:. ➢➢1-762.26 N • e _ MICHAEL P. RILEY WENDY RILEY i, f{ ,f •ql.• - 053528, PG 534 .N4 f _. ' ' y •5 V , , 1.NONCORMONUMENT FOUND WITHIN VWD VFRTICA1.INFORMATION FM TM PROIBCr WME POROUCFA WTH VRS GPS CEISERVATME ANC PROQBSa '6!t , AACCURACYY ED OF TUC rrH VRs DERIV ➢YOsl1.71O AI, nl¢A4 �'OR TS OKTS GAP NETWORK rAN 001 762.27 St RV aY CI.AM WEST8 OR RXCEF.D CLASS C. VEIVnCAL DATUM USAI CORY BAXTER NAVDBR. SARA BAITER DR "655, PG 897 L PROPERTY MAY BE SU&fECT TO OmR COVENANTS. RFmRIC MHS, TBMI EASEMENTS OR RIOIIP15-0E-WAY TKAT MAY BE OP RECORD 601) MAGRAIL ELEV•7188 35' 3" SETBACKS SHOWN ARE FFRMB.33, M S65. LEGEND: FOUND RREEBBAR OI PUTEO POINT ® , • LLIIGHT POLE ELECTRIC BOX SUBJECT PROPERTY LINE ADJDINER PROPERTY LINE BUWNG SETBACK — — - FEMA FS.000 UNE--- SEWER EASEMENT C A PORTION OF THE PROPERTY LM IN A FA-ECIAi. FLOOD HAM" AklL ACCORTDNLI TO FEMA FTAOD PANEL MAPS- HOWEVER THLET%OICMAL STRZMTLME IS ABOVE A140 BRYOMD THE SPRtiIAI. FLOODTIALARD ARIi PER FEMA PAN- LEAP 371046U05K: ELATED 3+92f2U04. 3. NO RESIDRNTW, STRIJCrUk]' PERMANENT OR TO&CRARY MAY BE CONSTRUCTED OR 3R=ED ON PID M-362.24. K RAB 1154%1G 531. 6. PID M]-762-24 MAY NOT BE DIVIDED TO CREATE AMMONAL LOTS( PARCELS PERM 11543.PO 351. 7, CONSSJLT Wrlli OOVPRNRIO AG1ti1 O FCR-PRHVAU,1NO LAND DRVEL08b4@7C AND Y.O DREQUIRF]MI-IiB PRIOR70 DESIGN OR CONSTRUCTION OF ANY MVAOVtir1EP7CS. Topographical Survey of Lot 122 & 123 of Crown Harbor, Phase 1, Map f (Revised) & PID # 001-762-24 Former Crescent Resources Inc. Tract professional mperty Property of: As Recorded in: Site Address: ► Surveyors, Inc. p ' Map Book 33, Pg 365 20107 Bascom Ridge Drive 18335 Old Statesville Road Ste. A William & Kelsie Deed Book 8988, Pg 460 Cornelius, NC 28031 Cosnetius, N.C. 28031 Grant heed Book 37364, Pg 491 Mecklenburg County 704-765-5134 Phone/Fax Firm License: C•36M 042522-01 JA+C 1:10 U00 1"=50' 001.762.26 TOP0 1 of 1 6�0/2022 naror 5rroriasure IhAwina 3caln Tax cell NLLv-oer Drawiie HumC net Nulnba �� THE INFORMATION CONTAINED IN THIS DRAWING fS THE SOLE PROPERTY OF LANCASTER'S DOCK& LIFTS SYSTEM INC. ANY REPRODUCTION W PART OR AS A WHOLE MTHOUT THE WRITTEN PERMISSION OF LANCASTERS DOCK & LIFTS SYSTEM INC. IS PROHIBITED. ALL DIMENSIONS USED IN THIS DRAWING ARE NOMINAL c 49-0" 20'-o'Fb C2 N 4' 0" — 34'•0' \N' -1l ,r-P-9uiVT 8 61 apes ISSUE CLIENT 10-16-23 William and Kelsie Grant Q Lancaster Custom Dock and Lifts u DRAWN 9Y 20107 Bascom Ridge Drive 1156 Perth Road Troutman r M.H North Carolina Cornelius, N.C. 28031 Ii] t4� %A :7 tO DUKE ENERGY DIRECTIONS BY ROAD FORM Lake Use Permit Applications and Contractors: Ease of locating a proposed project site can have a big impact on permitting processing time. Please complete this form and return it along with your completed application to: DUKE ENERGY CIO LAKE SERVICES — EC 12Q 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 Applicant's Name: William Grant Street Address tat lake): 20107 Bascom Ridge Road Lake Name: Norman Subdivision Name: Crown Harbor North Phase 1 Property Section: Map Section 6 City: Cornelius State: NC Directions (from major road or highway): Lot #: 122 County: Mecklenburg Zip Code: 28031 From 1-77 NB, Exit 28, Turn left onto Catawba Ave. WB, Turn right on Torrence Chapel Road, Turn right on Schooner Dr., Turn Left onto Crown Lake Drive, Turn left onto Bascom Ridge Road. Property is at the end of the cul-de-sac to the right. Descriptive Structure(s) on Property (i.e. brick garage, white fence, mobile home, etc.) Note: Please use the back of this form if desired to draw us a map to the site. 20107 Bascom Ridge Road Cornelius, NC 28031 oil Sabi Asic Bisti C D N 0$ z� y, t Parham Gateway Park Lake Norman sMaps Legai CRM ■ Deg ■ DM5 Help D UKE IENERGY DIRFCTIGNS BY ROAD FORM LANCAanR CUSTOM DOC= DrsP.,, S,,. Lake Ilse Permit Applicants and Contractors: Ease of lacatin the r site csnhawa big imps as proposed l�roj ect return it along with your compllee�ted applicatioMcen to..ing Lime. Please eaMpleie this farm and DUKE ENERGY C/o LADE SERVICES — EC 12 Q 526 SOUTH CHURCH si'i iir CHARLOTTE, NC 28202 Applicant's Name: IkW Address (at lake): 1162 ltiv ' hwa M N 28117 Lake Name: Subdivision Name: Bi Prop" Section: Lot #: City: o Mile County: State: --�� 71p: Z Telephone _ OS Directions (fmm major road or highway): From 1-77 NT3, Exit 36, Lett onto NC- 150 WE, Disposal Area is an the right behind Big Daddy's Restaurant Complex. Descriptive Structure(s) an Property (i.e. brick garage, white fence, mobile home, etc.) *Note: Please use the back of this form it dent and to draw as a map to the site. 1162 River Highway Mooresville,NC 28117 0 250 5o0 750 ft� mmmb� ms . € USTIC WAY LN z a 0 3 5.604043, - 80.99 0 286 Drag Me! R BP World 0 c� Foothills Marine d Maps legal of Lake Norman Performance Hitch and Trucl Accessories CRM ■ Deg ■ DIMS Help Decimal Degrees Latitude: 35.604043 Decimal Degrees Longitude:-80-910286 Clear Show Point DUKE Lake Services ENERGY® Duke Energy EC120 1 526 South Church Street Charlotte, NC 28202 Mailing Address: EC12Q j PO Box 1006 Charlotte, NC 26201-1005 Pro' ected PrODerty Line AnDroval Letter L i (Print Name) ^` ► owner of Lot # j in Subdivision HA :iS'Cr,- give approval to W I W - _ -�y r )7 , (Print Name) owner of adjacent Lot # in Subdivision -O CD vAN f'a, - to encroach over the projected property line between our lots for uses that are checked below: 0//Dock ❑ Dock Cable Anchor Dredge WAWRA� arlu-2O (DM) ()PaVLAK9MGMTlf2ekage iarmMionlProiWed Pmperry Line Approval Letter dae www.duke-enerFy.com Project N2rne/address., . q �, NL laeat o R dress: re i t wb V r Parcel #. 4 �,p,3g Parcel/lot size rc Disposal area required (sq ft Omd/or acreage) ,4ck 7 r-, pe►nent of N00f cation r files bu �P —1 V�County: �re C-54 ! P r S4 y.- and rules regarding sedl ent and erosio ❑ntrol and wateram 1"Ware hauality51And g Ve pete rn ere to ali $ state regulations r Name of Individual and Company to dispose of their dredge material at the above stated location Owner: ►. � , f Ir a v 1 �s _ n _� _ A rZ x O� Print Date: Jam- �JS18n�aure Along with form, please provide: Aerial of parcel/lot (County G15) Photo of proposed spoil site Identified proposed spoil site M r 00 '4- CV co N Cl N 0? r+r.1 V �I ❑ ►'. r. 4 En ..r. IN V 41- 97 OIL AQlw u� r THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF LANCASTER'S DOCK & LIFTS SYSTEM INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHQUT THE WRITTEN PERMISSION OF LANCASTERS DOCK & LIFTS SYSTEM INC. IS PROHIBITED. ALL DIMENSIONS USED IN THIS DRA WIN(: ARF MOMIM AI ISSUE CLIENT 10-18-23 William and Keisie Grant DRAWN BY 20107 Bascom Ridge Drive M.H. Cornelius, N.C, 28031 Lancaster Custom Dock and Lifts 1156 Perth Road Troutman North Carolina ti THE INFORMATION CONTA fNED IN THIS DRAWING IS THE SOLE PROPERTY OF LANCASTERS DOCK& LIFTS SYSTEM INC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF LANCA STEPS DOCK & LIFTS S YSTEM INC. IS PROHIBITED. ALL DIMENSIONS USED IN THIS 6RAWAG ARE NOMINAL issue CLIENT D 10-18-23 William and Kelsie Grant Lancaster Custom Dock and Lifts IjDRAW MA. N BY 20107 Bascom Ridge Drive 1156 Perth Road Troutman J 'HCornelius, N.C. 28031 North Carolina CUSTOM DOCK & Ll THE INFORMA TION CONTAINED IN THIS DRAWING IS THE SOLE PROPER TY OF LANCAS TER IS DOCK& LIFTS SYSTFIN INC. ANY REPRODUCTION IN PA RT OR A A WHOLE WITHOUT THE WRITTEN PERMISSION OF LANCASTER'S DOCK & LIFTS SYSTEM INC. IS PROHIBITED. A LL DIMENSIONS USED IN THIS DRA WING ARE NOMINAL . . 1 � ' - ti S - '� [ • �. II'�_AT �' i er .. !I-V 1 • g. F �J '1iC�Vh 411 •1' • a""-� A:i. .•' K Y 1. Yf > �i ISSUE CLIENT ■ 1 i}18-23 William and Kelsie Grant Lancaster Custom Dock and Ufts {� DRAWN BY 2-0107 Bascom Ridge Drive 1156 Perth Road Troutman r M.H. North Carolina Cornelius, N.C. 28031 W, N 1 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTYOF LANCASTER'S DOCK& LIFTS SYSTEM INC. ANYREPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF EANOASTERS DOCX & LIFTS SYSTEM INC. IS PROHIDITED. ALL DIMENSIONS USED IN THIS ORA WING ARE NOMINAL a issue CLI ENT 0 23 William and Kelsie Grant Lancaster Custom Dock and Dfts F+ °RAIIN BY 20107 Bascom Ridge Drive 1156 Perth Road Trautman M.H. North Carolina Cornelius, N,C, 28031 W TV W fV fV THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPER T Y OF LANCA S TER'S DO( ►A& LIFTS SYSTEM INC. ANYREPRODUCTION IN PART OR AS A WHOLE UVITHOUT THE WRITTEN PERMISSION OF LAN CASTER'S DDCIC & LIFTS SYSTEM INC. IS PROHIBITED. ALL DIMENSIONS USED IN THIS DRAWA;G ARE NOMINAL ISSUE CLIENT 10-1&23 William and Kelsie Grant DRAWN 6Y 20107 Bascom Ridge Drlve M.H. Cornellus, N.C. 28031 Lancaster Custom Dock and Lifts 1156 Perth Road Troutman North Carolina M1] AGENT AUTHORIZATIrON FORM PROPERTY LEGAL DESCRIPTION: LOT NO. _ 122 PLAN NO. PARCEL ID. 00176224 STREET ADDRESS: 20107 Bascom Ri a Drive Cornelius. NC 28031 Please print: Property Owner: _1Nilliam Grant Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Donna P. Hrko of (Contractor J Agent) Lancaster's Custom Dock and Lift Systems, Inc. (Dame of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: 336--906-0665 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized SignatKY Authorized Signature 9/25/23 Date: Date: Project Namefaddress: Owner: t 1 1 Print Contractor/agent: TAWBR RIPARIAN BUFFER NOTIFICATION FOR Print jj nZU,07&5co►r, Rid Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 028 ,0243(8)j Trees are not allowed to be removed from Zone 1 of the Suffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 028.0243(6)1 Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 028.0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 028.0243(5), (5)] Acknowledgement of Notification f vIl T hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date.