Loading...
HomeMy WebLinkAbout820674_Routine Inspection_20231120Type of Visit: eltompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 42rkoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: U,LYI/i17% County:=� Region: Farm Name: 19 6 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: d/ Certified Operator: Lj'I'j Gx Back-up Operator: Title: Pho : Integrator: J2� Certification Number: G -7 �aS Certification Number: Location of Farm: Latitude: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ZNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes ,❑'No ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facility Number: jDate of Inspection: 50 F Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes T::�No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: % Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [2-No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [:]Yes eNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes E:fNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? [:]Yes ,E�No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require [—]Yes [�)No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [D"&o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes -ETNo ❑ Yes ,�No ❑ Yes E� No ❑ Yes O'No ❑ Yes E�No ❑ Yes �o ❑ Yes .E]�No ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ED-T�o ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections []Monthly and I" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E]"No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ETNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: % Date of inspection: {' ' 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E;I-No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes C;J'No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes allo ❑ NA ❑ NE ❑ Yes e"No ❑ NA ❑ NE ❑ Yes T] No ❑ NA ❑ NE ❑ Yes EfrNo ❑ NA ❑ NE [—]Yes 0No ❑ NA ❑ NE ❑ Yes E�No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes J❑[No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 2°No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? i �KMZVRMM�07 M Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ❑ Yes ,gNo ❑ NA ❑ NE /� Imo/ Phone: -/d q/ �JJ� Date: / I Id-1) M 511212020 FACILITY#:ga-(FARM NAME: 7"Z LAGOON LEVEL PERMIT (++s) DUE EVERY 5 YEARS EXPERIATION DATE - CURRENT NUMBER OF ANIMAL - OIC CARD YES OR NO NUMBER OF ANIMALS WASTE UTIL17ATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - ODOR CONTROL CHECKLIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (*21) -GOOD FOR 60 DAYS BEFORE OR AFTER (/' DATE '10'A D/` ")- NITROGEN LEVEL DATE a/F��` a"3 NITROGEN LEVEL DATE `Z Gl.�'� NITROGEN LEVEL o2J3 �li�la3 2-6s g,ba 1 a-3 !. a-3 SOIL REPORT G(uz�) 7j // 11 - EVERY 3 YEARS: DATE( - P-1 (NO MORETHEN 400) - PH (Not if 4 or less)- - Cu2N (NO MORE THEN 3000) CU ZN� (IF PEANUTS NO MORE THEN 300) IRR2 (mI) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RA Not over PAN CROP TYPES FLOW RA _ NITROGEN (N) NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION Is24) EACH REEL SHOULD BE CALIBRrED EVERY OTHER YEAR DATE OF CALIBRATION l f / i, 1 FLOW RATES RAIN FALL (*21) -INITIAL AFTER 1 ° RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED. ,% SLUDGE y ma25) -DUE EVERY YEAR: DATE e/�/ O: 3,,5" P: % %RATIO OF SLUDGE 170 O: P: % RATIO OF SLUDGE - O: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE OTHER FORMS (#22 AND 421) RAIN BREAKER FORM CROP YEILDS MORTALITY *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED BINS_ LAGOON GARBAGE Bermuda grass: Opens March 1st- Ends September 30t Small Grain Over seed: Opens October 1-t- Ends March 31k Corn: Opens February 15s - Ends June 30+ Cotton: Opens March 15N - Ends August 1A Rye: Opens September 1�-Ends March 31A Oats: Opens September 1�t- Ends April 15u Wheat: Opens September 1st - Ends April 30th Soybeans: Opens April 1st- Ends September 15t Fescue: Opens August 1st- Ends July 31�t Sorghum Hay: Opens March 15ffi - Ends August 31 st