Loading...
HomeMy WebLinkAboutNCC204940_NOT Signed Certification_20231117• NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form, complete, scan and upload to the electronic NOT(Rescission) form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program ••, 512 N. Salisbury Street, 6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 •• t DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CFR 122.221 • NCC204940 General Permit Certificate of Coverage (COC) No.: SkylarAnna Development • Name of Project: Per NC General Statute 143-215.68 (i), any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). • Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge • and belief, such information is true, complete, and accurate. • Legally Responsible Organizational Entity (must match eNOT): Heidur LLC • • *Legally Responsible Person (must match eNOT): Oleg Korchagin • *Title of Legally Responsible Person: Owner • Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: *Signature: Date: 1I [S/2bZ3 * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section 8, Item (6)of the NCG010000 permit. • • For more information on signatory requirements, see Part IV, Section B, Item(6)of the NCG010000 permit. • e � Scanned with CamScanner