Loading...
HomeMy WebLinkAboutGW1--07405_Well Construction - GW1_20231117 _n•v WELL CONSTRUCTION RECORD(GW-1). For Internal Use Only: 1.Well Con rrf rmation: f D 1 hI r `" ) 14-WATERZONES 1 . Name FROM TO DESCRIPTION Well Contor 0 li ft. / oft. ft. ft. NC Well Contractor' ration Number IS..OUTER.CASING(for )OR LINER-(if • ) / FROM TO DIAMETER ThICK NFSS MATERIAL 4.taw r ft. �j'� ft. 6, 1 m. /(f L Company Name / / j 7 •16:INNEIf:CA ttNG.31%;11 BING.(t eot erjad dined-loop) 2.Well Construction Permit#: P/ti / 7 FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.U)C.County,State.Variance.etc.) ft ft. 1° 3.Well Use(check well use): ff 1.7 Water SupplyWell: EN` FROM DIAMETER SLOT SIZE THICKNESS MATERIAL QAgricultural DM 1pal/Public a fG ft in. JGeothermal(Heating/Cooling Supply) Mesidential Water Supply(single) ft. in: . DIndustria11Commercial DResidential Water Supply(shared) .:/ft_ GRona . • • . ' Irrigation FROM TO MATERIAL EMPLACEMENT METHOD& O/UNT Non-Water Supply Well: ft ad ft. Co t Ct/.a- lC cs el n /P Monitoring E3Recovery ft. ft. Injection Well: ft.Aquifer Recharge 0 Groundwater Remediation Aquifer Storage and Recovery • DSalinity Barrier FROSDniLPACK MATERIALk} EMPLACEMENT METHOD 0Aquifer Test DStormwater Drainage f. 0Experimcntal Technology Subsidence Control ft ft. • DGeothermal(Closed Loop) Erracer •28:DRILLING:3AG.(attaehaddiebaalsheeisitiansissary) Geothermal(Heating/Cooling ) °Other(explain tinder#21 Remarks) FROM TO DEscx�tro r ea.ace soil/rock type, a me etc.) 4.Date Well(s)Completed: /// 9��� Well IIIt# �.f 7 5— //..--4 Sa.Well Location: ft. ft.T s 4 e 'e5 4A ft. ft. FactlitylQwnerl /l� Faet7f applicable) ft ft a� .' Physical City,and lap �,1/ ��� ft. _ f ,t• V ,�.�z ZL REMARR5 NO V i ,, n n `�CJ County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/secouds or decimal degrees: (ifwell field,one lat/long is sufficient) 22.Certification: ' J N W /l/743 6.Is(are)the well(s) ermanent or Temporary Signature of ed Well Contractor Date By signing this form.I hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: ®Yes or . No with ISA NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that a If this is a repair,fill out brown well construction information and explain the nature of the Copy of this record has been provided to the well owner. repair under#21 remark section or on the back of thisform. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if nerescary_ drilled: SUBMITTAL INSTRUCTIONS r 9.Total well depth below an surface: 7.� (f-) 24a. For All Wells: Submit this farm within 30 days of completion of well For multiple wells list all depths ifdrfferent(example-3®2 'and__2(Q100`) construction to the following 10.Static water level below top of casing: V (ft.) Division of Water Resources,Information Processing Unit, fwater level Is above casing use"+" - 1617 Mail Service Center,Raleigh,NC 27699-1617 i 11.Borehole diameter (in) 24b.For Injection Wells: Iniaddition to sending the form to the address in 24a 12.Well construction method rB above,also submit one copy of this form within 30 days of completion of well (i.e.auger,rotary,cable,direct push,etc.) / construction to the following: Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 CCr I3a Yield(gpm) J Method of test: 4' 24c.For Water Supply&1 i iection Wells: In addition to sending the form to /� the address(es) above, also submit one copy of this form within 30 days of l,,� 13b.Disinfection type: "! 7 /� Amount: 9e)_ completion of well construction to the county health department of the county where constructed. 1 Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016 i 1 i